Commissioning and preliminary results

Slides:



Advertisements
Similar presentations
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Advertisements

Supervisor: Jonathan Emery Labview control BWS Calibration Bench.
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
What Is Network ?. A Network is a connected collection of devices and systems, such as computers and servers, which can communicate with each other.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
PROFIBUS wiring/installation can be done with:
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
The Actuator and Control unit CERN wire-scanner development review J.Emery for the BWS team.
1 Status and Plans at J-PARC Linac Kazuo Hasegawa J-PARC Center/Japan Atomic Energy Agency Collaboration meeting between CERN and J-PARC December 18, 2013,
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
8/12/2000Guy Crockford BI days New application software for SPS wire scanner controls G.Crockford SL/OP.
September 19-20, 2007 R. Lambiase Power Supplies Bob Lambiase September 19-20, 2007 DOE Annual Review.
TECHNOLOGY GUIDE FOUR Basics of Telecommunications and Networks.
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
RF source, volume and caesiated extraction simulations (e-dump)
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
CLIC workshop 2015 EXTRACTION KICKER STRIPLINE MEASUREMENTS C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M.J. Barnes.
BPM stripline acquisition in CLEX Sébastien Vilalte.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
LAPP BI Read-out electronics Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC BI WS 02-03/06/2009.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
Controls Test Stand Test stand proposal document review - Dayle. The activities can be prioritized according to which measurements we need to do first.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
LER workshop 2014 Update on the Extraction Kicker for CLIC DRs: Calibration Tests C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral.
Kévin Pepitone 1CLIC workshop, CERN, January 2016 Kevin PEPITONE, BE-RF LEETCHI: Drive Beam Electron Source.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
H - ion source at the pre-acc R&D lab Update HINS Meson meeting January 20 th, 2011 L. Prost, C. Schmidt, D. Bollinger, R. Tomlin.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
Report Technical Director Storage-Ring-Installation Completed
DOM acceptance and calibration
Diagnostic & Control Status
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
EAAC, Isola d’Elba, September 2017, WG1
ELENA installation and commissioning status
ATF/ATF2 Control System
Injectors BLM system: PS Ring installation at EYETS
Construction and Commissioning of Electronic Test Benches
Status of the Front End Test Stand April 2007.
352MHz Klystron Control for the 3MeV Linac test stand
A.KOLOMIETS & A.KOVALENKO
AWAKE status and readiness for phase #2
McCrometer Nano Board Test Procedure
Particle Detection System for MERIT
PIs: Riad Suleiman and Matt Poelker
High Level Physics Applications for LCLS Commissioning
Particle Detection System for MERIT
Linac Diagnostics Commissioning Experience
KFA10 status 03/06/2019 Currently:
Illustrations of Beam Synchronization Issue
Presentation transcript:

Commissioning and preliminary results ELENA ION SOURCE Commissioning and preliminary results Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 ELENA Ion Source Design H+/H- production +/-100 kV Bias voltage Tungsten filament Decapole magnet Magnetic filter Pulsed extraction Currents of tens of µA Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 High voltage Electronic signals Fiber optics Computer com. HIGH VOLTAGE AREA HIGH VOLTAGE CABINET GROUND CABINET PC Pepper-pot CONTROL UNIT CONTROL UNIT WS PC CT Puller Source MAINS FILAMENT PS - + PULSE GEN. Stepper motor trigger Measurement trigger Screen e- TTL to FO ARC PS - + QUADRUPOLE PSs WS measurement Calib. signal Current meas. Cam. Quadrup. PULLER PS 220V/400Hz conv. HIGH VOLTAGE PS (+/-100kv) PC Main trigger PC WS CONTROL PICOSCOPE Ana Megia. CERN. September 2015

Source characterization Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 Raw data Wire scanners Pepper-pot Current transformer Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 Where to begin? H+/H- Arc voltage Arc current Gas flow Source voltage Puller voltage Quadrupole settings Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 Wire Scanner analysis Pepper-pot analysis Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 Results comparison (EIS-NP-SC-014) WIRE SCANNER PEPPER POT Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 Results comparison (EIS-NP-SC-014) WIRE SCANNER PEPPER POT Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 Results comparison (EIS-PP-SC-004) Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 Results comparison (EIS-PP-SC-004) WIRE SCANNER PEPPER POT Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 Results comparison (EIS-PP-SC-004) WIRE SCANNER PEPPER POT Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 Results comparison (EIS-NP-SC-037) Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 Results comparison (EIS-NP-SC-037) WIRE SCANNER PEPPER POT Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 Results comparison (EIS-NP-SC-037) WIRE SCANNER PEPPER POT Ana Megia. CERN. September 2015

Source re-installation Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 What’s next? Regarding previous measurements: Improve the ellipse fitting. Analysis of all results. Is it possible to get better RMS Emittance values?? Determine new interesting points to be measured. Analyze Pepper-pot images for all the measurement points. Ideas are welcome. Waiting for some parts from Jülich (HV cables & safety hood). September 2015 Measurement plan for the source and the ion switch (Daniel Barna) Timing and Oasis. Integration of the source in the AD control system? Regarding source future operation: Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 Timing Ana Megia. CERN. September 2015

? OPTION I: LOCAL CONTROL (€) OPTION II: REMOTE CONTROL (€€€) 5000 € PICOSCOPE CURRENT TRANS. CONTROL UNIT PULLER PS PULLER Trigger cable PULSE GEN. WS STEPPER MOTOR WS CONTROL WS MEAS. Local control of the source parameters OPTION II: REMOTE CONTROL (€€€) ? PICOSCOPE CURRENT TRANS. Trigger cable CONTROL UNIT PULLER PS PULLER PS Serial cable CONTROL TEST STAND WS STEPPER MOTOR Ethernet 5000 € WS CONTROL 1805 € WS MEAS. Source parameters controlled from the control room by remote desktop app Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 OPTION III:LOCAL CONTROL PREPARED FOR FUTURE REMOTE CONTROL (€€) PICOSCOPE CURRENT TRANS. Trigger cable CONTROL UNIT PULLER PS PULLER Serial cable PULSE GEN. Ethernet WS STEPPER MOTOR 1805 € WS CONTROL WS MEAS. Source parameters controlled from the control room by remote desktop app OPTION IV: INTEGRATION OF THE SOURCE (€€€€) OPTION II + man power Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 QUESTIONS FROM TIMING TEAM Will the source be always operated in pulsed mode? If so, which are the maximum and minimum frequency and pulse length? Once the commissioning is finished and ELENA is connected to the AD ring, will the source need to be synchronized with the AD beam? Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 Oasis Ana Megia. CERN. September 2015

Extraction pulse trigger PICOSCOPE OASIS Picoscope trigger Main trigger CT calibration signal CT calibration signal Ion current Ion current Extraction pulse trigger Wire scanner signal Ana Megia. CERN. September 2015

Comments… Cable request deadline 25th September ! Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 H- preliminary results Ana Megia. CERN. September 2015

Ana Megia. CERN. September 2015 H+ preliminary results Ana Megia. CERN. September 2015