HBD Alignment in Run-10 (update) Mihael Makek Weizmann Institute of Science HBD Meeting, 8/12/2010.

Slides:



Advertisements
Similar presentations
Thermal Photon Measurement using the HBD in PHENIX :Status and Update Sky RolnickUC RiversideAPS April Meeting 2011.
Advertisements

1 STAR TOF Calibration. 2 Detectors TPC(TPX) - tracking MRPC TOF (TOFr) – stop time measurement pVPD/upVPD - start time measurement Particle momentum;
OD Calorimetry Study Update — Z vertex position dependence Jaewon Park University of Rochester MINERvA/Jupiter Group Meeting, May 17, 2006.
Particle flux simulations Sergei Striganov Fermilab June 11, 2008.
LATEST ANALYSIS WITH THE PHENIX HBD Mihael Makek (University of Zagreb) for the PHENIX Collaboration Thermal Photons and Dileptons in Heavy-Ion Collisions,
HBD performance study during run9 pp 200GeV Katsuro Nakamura 1.
Dealing with central events in Run 10 Au+Au collisions Mihael Makek Weizmann Institute of Science HBD Meeting, 2/6/2010.
HBD Meeting 2010 / 11/ 24 Katsuro 1. confirmation plan for HBD simulation performances 2 HBD charge distribution Red: merged cluster Blue: separated cluster.
Current Status of Hadron Analysis Introduction Hadron PID by PHENIX-TOF  Current status of charged hadron PID  CGL and track projection point on TOF.
Status of W analysis in PHENIX Central Arm Kensuke Okada (RBRC) For the PHENIX collaboration RHIC Spin Collaboration meeting November 21, /21/20091K.Okada.
Observation of W decay in 500GeV p+p collisions at RHIC Kensuke Okada for the PHENIX collaboration Lake Louise Winter Institute February 20, /20/20101.
1 MTD Calibration for Cosmic Ray Triggered Data in RUN 10 at STAR Lijuan Ruan (BNL), Liang Li (UT Austin) 04/01/ Workshop on STAR MTD Production.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Fixed Target Program in STAR Fixed-target running allows much higher rates without e-cooling at lower energies Top of  B range now ~ 400 MeV; extends.
Jin Huang BNL.  GEANT4 customary code  PHENIX simulation/analysis  EICROOT by EIC taskforce at BNL (learning) RICH Discussions J. Huang 2.
WWND 2011, Winter Park, CO, 7/Feb/2011ShinIchi Esumi, Univ. of Tsukuba1 v n {EP} measurements with forward rapidity  n in 200GeV Au+Au collisions at RHIC-PHENIX.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Nantes — 2008, July Analysis of results from EmCal beam test at CERN PS (and SPS) energies P. La Rocca & F. Riggi University & INFN Catania University.
JPS/DNPY. Akiba Single Electron Spectra from Au+Au collisions at RHIC Y. Akiba (KEK) for PHENIX Collaboration.
2/18/2016I. Ravinovich1 HBD Run-10 data analysis I. Ravinovich WIS.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
1 HBD Update Itzhak Tserruya DC meeting, May 7, 2008 May7, 2008.
Measurements of low mass e + e - pairs in p+p and Au+Au collisions with the HBD upgrade of the PHENIX detector Mihael Makek Weizmann Institute of Science.
Central-Cluster Tracking Takashi Hachiya Maya Shimomura.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
6/29/2016I. Ravinovich1 HBD status in Run-10 I. Ravinovich WIS.
Charge Subtraction, Weizmann Clusterizer, and Pattern Recognition Mihael Makek Weizmann Institute of Science HBD Fest, Stony Brook, 2010.
Stability Hidemitsu Asano. pixel unstable point seg#
ATLAS Tile Calorimeter Data Quality Assessment and Performance
External Alignment Maya Shimomura (ISU)
Z-alignment Hidemitsu Asano.
Charles F. Maguire Vanderbilt University
fKK analysis in Run3 d+Au collisions: Update
VTX tracking issues Y. Akiba.
Software Update Takashi HACHIYA.
External alignment Maya Shimomura (ISU) 12/03/15 RIKEN VTX meeting.
External Alignment Maya Shimomura (ISU)
Hadron PID recalibration in EMCAL GeV dataset)
Maya SHIMOMURA University of Tsukuba for the PHENIX Collaboration
EMCal Recalibration Check
Run4 f K+K- analysis: analysis train
Current status of run14 VTX alignment
Alignment of the PHENIX Silicon Vertex Tracker (VTX) in 2014
EMCal Recalibration Check
Weekly Report Maya SHIMOMURA Run dependent check for VTX alignment
Yuxi Pan University of California, Los Angeles
EMCal Run4 Recalibration Check Looking at K mass centroid and width
5 × 7 = × 7 = 70 9 × 7 = CONNECTIONS IN 7 × TABLE
5 × 8 = 40 4 × 8 = 32 9 × 8 = CONNECTIONS IN 8 × TABLE
->K+K- Production at 62.4GeV Au+Au Collisions
Problems with the Run4 Preliminary Phi->KK Analysis
4 × 6 = 24 8 × 6 = 48 7 × 6 = CONNECTIONS IN 6 × TABLE
5 × 6 = 30 2 × 6 = 12 7 × 6 = CONNECTIONS IN 6 × TABLE
Humanities and Social Sciences Upper Level Northeast: Accessible Entrance
fK+K- yield analysis update
For First Place Most Times Up at the Table
10 × 8 = 80 5 × 8 = 40 6 × 8 = CONNECTIONS IN 8 × TABLE MULTIPLICATION.
3 × 12 = 36 6 × 12 = 72 7 × 12 = CONNECTIONS IN 12 × TABLE
Fu Jinghua Institute of Particle Physics, Huazhong Normal University
Reaction Plane Calibration
East West Move to Table 2 N/S
1 2 Table No Table No 5 Table 5 Table ¾ Howell Movement
Student Center A South: Inaccessible Element
5 × 12 = × 12 = × 12 = CONNECTIONS IN 12 × TABLE MULTIPLICATION.
LC Calorimeter Testbeam Requirements
VTX stability study Hidemitsu Asano.
5 × 9 = 45 6 × 9 = 54 7 × 9 = CONNECTIONS IN 9 × TABLE
3 × 7 = 21 6 × 7 = 42 7 × 7 = CONNECTIONS IN 7 × TABLE
Presentation transcript:

HBD Alignment in Run-10 (update) Mihael Makek Weizmann Institute of Science HBD Meeting, 8/12/2010

Detector movements during Run-10 Run(s) selected for alignment

Goal: determine time variations of HBD offsets Selected data: CCNT - hadrons Good quality tracks (31,51,63) n0 < 0 Emcal matching Selected subsample: p > 0.7 GeV/c Hbdsize = 1 Restricted geometry in HBD modules Centrality > 50% The dataset

Sign dependence Select particles with p > 0.7 GeV/c to avoid sign dependence

Matching in phi (run )

Matching in z (run )

Offsets in phi The blue line – weighted average EAST The red line – weighted average WEST

Offsets in z Z-offsets for East and West are moving synchronously  cannot be connected with carriage movements. BBC calibration? Beam related? The blue line – weighted average EAST The red line – weighted average WEST

Check the systemactics of the method Look at two very close runs:  the difference comparable or smaller than the errors

Offsets in phi - table

Offsets in z - table