Initial eligibility assessment and ex-post monitoring of State aid in EU funds co-financed projects.

Slides:



Advertisements
Similar presentations
BUDGETING Training Unit 13.2 Principles and financial rules of mobility.
Advertisements

1 Unit C3 Finance, legal Affairs and Partner support CALL FOR PROPOSALS APPLICATION PROCEDURE SPECIFIC ADMINISTRATIVE AND FINANCIAL ISSUES Version
Regional Policy Delegated Acts. Regional Policy 2 Delegated ActsImplementing Acts 32(10): Purchase of land and combination of TA with FI 33(3)(a):FI complying.
INFSO/F3 1 Guide for proposers Willy Maes INFSO/F3, EC TEN-TELECOM Information Day.
Management verifications Franck Sébert European Commission DG Employment, Social Affairs and Equal Opportunities.
European Union Cohesion Policy
INTERREG and Tacis budgets Main differences: No breakdown of the Tacis budget between the partners is required; No strict limits for the project management.
Ms Valerie Vandermeersch National expert, Ministry of Justice.
“MED P ROGRAMME ” Z ERO C O (2) Z ERO EMISSION CO MMUNITIES F INANCIAL MANAGEMENT SYSTEM K ICK O FF M EETING J UNE 17° 18° 2010.
1 District 7610 Rotary Foundation Seminar Grants ManagementSlide 1 Grants Management PDG Travis White District 7610 Rotary Foundation Stewardship Committee.
AUDITING COHESION AND STRUCTURAL FUNDS IN SLOVENIA Nataša Prah Ljubljana, 
Single Audit Strategy LATVIA. Audit System The Audit Authority functions are carried out by the Internal Audit Department of the Ministry of.
Arrangements regarding ECP 2014–2020 implementation 1.Implementation of the Republic of Slovenia Budget Act Specific section for the period:
1 Project “EGO - ENTERPRISE GENDER ORIENTED” LLP-LDV-TOI-09-IT-0496 Management of the project: aspects of its contents Porto, January 2010 EGO, Kick-off.
Large Scale Projects Aleksejs Šaforostovs LSP Project Manager Joint Technical Secretariat.
Practical Information and Guidance to Applicants Green Industry Innovation Programme Bulgaria Official Launch, Sofia, 4 th December 2012 Practical Information.
Financial and legal aspect in the context of proposal preparation Marija Šola, MSc. Project manager University of Belgrade School of Electrical Engineering.
Audit of Public Procurement
Report about controlling activity and its results in the programme in 2013 TOP Monitoring Committee Meeting
Financial management Management and control systems Training for Programme Operators March 2012.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
Analysis and Elaboration of a Unified Methodology for Projects that within Five Years from the Completion of Operation have Undergone Substantial Modifications.
Montenegro May 20-22,2008 Agricultural Pre Accession and Accession Programs of the European Union Krassimir Kiriakov - Agribusiness Consultant.
Rahandusministeerium Project Preparation Fund for Structural Funds Peter Gornischeff Ministry of Finance of Estonia.
Croatian Experience with Management of EU Funds Nataša Mikuš, Deputy State Secretary Central Office for Development Strategy and Coordination of EU Funds.
Outlook on effective management of EU structural funds from to Vilnius.
SEMINAR on the EEA Financial Mechanism THE EUROPEAN COMMISSION DIRECTORATE- GENERAL REGIONAL POLICY Brussels 13 June 2005 Audit of the Cohesion Fund Lena.
ADMINISTRATIVE & FINANCIAL ISSUES DG ECHO HUMANITARIAN AID AND CIVIL PROTECTION Finance, Legal Affairs and Partner Support unit-C3.
Financial reporting Linda Wormö, MA Per Dahlström, MA 1st October,2015 Kuopio, Finland.
8th Cohesion Fund Monitoring Committee 11 April 2008 Technical Assistance for the Cohesion Fund Management in Latvia No.2005/LV/16/C/PA/001.
Paulius Baniūnas Ministry of Finance of the Republic of Lithuania EU Structural Support Management Department Monitoring and Analysis Division SYSTEM OF.
Practical Information and Guidance to Applicants Green Industry Innovation Programme Romania July 2014 Practical Information and Guidance to Applicants.
EQUAL Community Initiative Programme for Malta Conference co-financed by the EU: European Social Fund (ESF) Co-financing Rate: 75% EU Funds;
Structural Funds Managing Authority – Ministry of Finance 1 Technical Assistance Ilze Aleksandroviča Head of Control and Development Division EU Funds.
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
EU Funds in Latvia Aleksandrs Antonovs Ministry of Finance Deputy director of Department of EU Funds December 4, 2006.
Grant contract and annexes Training for Auditors Estonia/Latvia/Russia ENPI CBC Programme Riga, Tartu, April 2012.
Ministry of Education, Research and Religious Affairs General Secretariat for Research and Technology EEA Financial Mechanism GR07 Research within.
Reporting and payment claims Black Sea Basin ENPI CBC Programme Training for Grant Beneficiaries and Partners Bucharest 18 June 2014 Financial Unit.
District 5650 Grant Management Seminar April 11, 2015.
Eligibility of Administrative Costs in Projects of Structural Funds and Cohesion Fund 1.
24 March 2011 Management and control system 1. Contents 1.Changes in the management and control system in The progress of the control/audit activities.
District Simplified Grants. Utilize a portion of the district’s DDF –20% of new DDF –1 grant per district per Rotary year Itemized and budgeted humanitarian.
Technical Assistance Office 1 Contract, Reports and errors to avoid! GRANT AGREEMENT 2005 Comenius coordinators’ meeting, 17/10/2005 Maryline Fiaschi,
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
Implementation progress of SPD activities within the competence of the Ministry of Education and Science [as at 31/12/2006] EU Structural Funds for Education.
Methodology of RIA for European integration purposes and practical examples Outsourcing RIA preparation to external consultants: project management issues.
S&E and BMW Regional Operational Programmes 14 – 20 Training for Local Authorities involved in DUCGS projects, 21st April 2016 REPORTING, DATA COLLECTION.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
Ex-ante state aid control initial assessment of the planned state aid performed by the Ministry of Finance.
Grant Management Seminar 1 District 6540 Grant Management Seminar Doing International Grants.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Management of the Grant Agreement By Philippe Ruffio & Nathalie Hoste-Luxen Tempus project representatives’ meeting Brussels December 2011.
Transnational training seminar for potential Lead Partners and Partners to INTEREGG IIIB-CADSES procedures for 3° call for proposal CADSES implementation.
Ministry of Finance Contribution of the Operational Programmes to the implementation of the NSRF objectives Boriana Pencheva Director Management.
What is a grant? A direct financial contribution – donation – from EU budget An action - contributing to EU policy achievement Functioning of a body acting.
Objectives of the Training
Contractual obligations
Role & Responsibilities
Role & Responsibilities
Audit Requirements, Risk and Anti Fraud
Management Verifications & Sampling Methods
INTERREG IPA CBC “GREECE ALBANIA ”
Audit Requirements, Risk and Anti Fraud
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
SME Initiative Malta TAIEX-Regio Workshop Bucharest 11th July 2017.
MINISTRY OF ECONOMY AND FINANCE
Management Verifications & Sampling Methods
DG Employment, Social Affairs and Inclusion
Presentation transcript:

Initial eligibility assessment and ex-post monitoring of State aid in EU funds co-financed projects

Content 1.Initial eligibility assessment Assessment of aid objectives Assessment stages Preparation stage Project appraisal 2. Ex-post monitoring Monitoring of project implementation 3. Payment of costs

Goals of project appraisal Reduce market distortions to minimum Prevent fraud in EU funded projects Prevent inappropriate or disproportionally large support to beneficiary

Payment of costs Payment is made to the beneficiary only after a full 3- step check-up that includes: 1.Appraisal and approval of the project application; 2.Verification that the actual expenditure has been made in compliance with the program provisions (i.e., as per contract); 3.Verification that the objectives of the program (e.g. commencement of economic activity based on the purchased equipment) have been reached.

Preparation stage for receipt of projects Preparing for project selection Launch of informative campaign on the program provisions: - publication in local newspapers on the opening of a program ; - organizing public seminars ; - draw-up and distruibution of informative portfolio ; - publications on IDAL’s website ; - consultations on the program provided by IDAL’s customers service. Informing potential applicants of project monitoring and fraud prevention

Appraisal of project applications Documentation checklist procedure: - Non-eligible sectors; - Eligibility check on project activities and costs; - Requested aid does not exceed the amount of aid under the program; - Aid intensity; - Time-set for project implementation corresponds to that provided for by state aid program; - Cumulation of aid; - SME status; - Verification whether enterprise is not in financial difficulties; - Initial investment, the definition of experimental development Goal of the documentation checklist procedure is to disallow project applications from non-compliance with program provisions

Appraisal of project applications In-depth appraisal of the project: Validity check of the costs ear-marked for eligibility based on: publicly available information; expert rating; information provided by equipment manufacturers or service providers.

Evaluation system of project appraisal An inter-institutional body (IIB) carries out an in-depth appraisal (including objective conformity check) IDAL arranges and provides information to IIB, and does secretarial work IDAL carries out the documentation checklist procedure The first evaluation phase ends up with the signing of the contract IDAL ensures a contract monitoring function

Contract signing and implementation IDAL drafts a model contract for each state aid program, which includes provisions required by state aid program; the model contract is then proposed for approval to the Managerial Body (Ministry of Economics); Project reviewed and approved by IIB becomes an integral part of the contract upon conclusion of the contract; Amendments to the contract (if such) proposed by the beneficiary go under review to ensure they are not in conflict with provisions of state aid program.

Project implementation and post-monitoring On-the-spot checks: − During project implementation; − After the final payment. Interim and final checks: − Progress report checks (every 6 months of the project); − Verification of payment claims and expenses incurred.

Compliance with state aid requirements (I) Objective – to check whether the objectives of the project have been reached and review the eligibility and accuracy of costs incurred for achieving these objectives. Activities: On-the-spot checks– verification of the actual works, performed supplies and services based on the project and supporting documentation: - contracts for works, supplies or services provided; - transactions and supporting documents; Progress report check: verifying whether the project implementation has been carried out in compliance with the project provisions.

Compliance with state aid requirements (II) Eligible costs: Adequacy of costs (illegal arrangement of costs): - Public information; - Equipment manufacturers; - Expert rating; Documentation check: - Check the payment claims included in the cost of items and the supporting documents; - Double financing check to make sure eligible expenses are not included in beneficiary’s operating expenses and any other EU or national, or local project co-financed expenditure: 1. Accounting records present separate accounts for the project costs; 2. Existing a separate banking account for the project; 3. The project documentation bears a reference to the contract concluded with IDAL.

Compliance with state aid requirements (III) The maximum amount and intensity – check whether the payment claim does not exceed the required amount of support stipulated by the contract and state aid requirements Project duration –the extension of the project is disallowed if it exceeds the aid program; Specific requirements by aid program which may provide that: - On-the-spot-checks are to verify whether the installations or technologies acquired are new; - The experimental results of development are not used for commercial purposes;

Payment of costs After all activities under the project have concluded After IDAL has made it sure that the project objective has been achieved (e.g., the equipment is used for the purpose of beneficiary’s economic activity) After the final payment IDAL carries out monitoring of the project for 3-5 years

Thank you for your attention!