DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF HEATING, VENTILATION AND AIR-CONDITIONING (HVAC) SYSTEMS FOR THE PS ACCELERATOR INFRASTRUCTURE TENDERING.

Slides:



Advertisements
Similar presentations
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Advertisements

Best Value For Money adjudications for Industrial Services C. Lara/CERN 14 November 2013.
STANDARD BIDDING DOCUMENT PROCUREMENT OF GOODS (FOR VALUE UP TO NU.0.25 MILLION) Presentation by: Tshewang Gyeltshen.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031 Date: 15 January 2013 Time: 09:00.
Co-funded by the European Community eContentplus programme WP1 – Project Management Reporting and financial issues Milva Carbonaro GISIG.
Consolidated Equipment Financing Program (CEFP) Department of Financial Services Bureau of Accounting.
Large Scale Projects Aleksejs Šaforostovs LSP Project Manager Joint Technical Secretariat.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3972/EN PROVISION OF MAINTENANCE SERVICES ON INDUSTRIAL TRUCKS ON THE CERN SITE Insert.
Invitation To Tender Procedure IT – 4005/en Provision of engineering studies and drawings, the supply and installation of piping and its accessories.
Reporting Instructions For Beneficiaries and Partners of the HUSKROUA ENPI CBC Programme November 2011.
TENDERING PROCEDURE IT- 3927/EN
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4123/EN Supply, Replacement and Repair of Crane Rails.
United Nations Procurement Division
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
VALUE FOR MONEY 1 OGC buying.solutions Procurement of Projects Presented by Andy Hamer Pre Accession Advisor, Finance Ministry.
Doing business with CERN Anders Unnervik 3 November 2014.
Financial Management MW-Sonet 16 th – 19 th of March 2011, Turkey.
Financial reporting Linda Wormö, MA Per Dahlström, MA 1st October,2015 Kuopio, Finland.
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM Cycle 2 Conversions.
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems General Conditions of Contract and Special Conditions of Contract.
Doing business with CERN Anders Unnervik Ankara 5 October 2015.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
EN/CV/DC IT-3673 Presentation done by Elena Perez Rodriguez For further information contact For the purchase of cooling fluids.
Suppliers without a Contract Purchase Order for Services.
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Contractual and Financial Management Administrative and Financial Handbook.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3976/EN PROVISION OF SPECIALIZED EOT CRANE MAINTENANCE SERVICES ON THE CERN SITE Insert.
Doing business with CERN Anders Unnervik 20 May 2014.
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems Invitation to Bids (ITB) and Bid Data Sheet (BDS) February 27- Mar.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
EU - China 11 Guidelines for Applicants rules for applications European Union Delegation to China & Mongolia Beijing Information Session 14 th November.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4142/EN Supply, Installation, Testing and Commissioning of the HVAC System for the.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
KUSILE POWER STAION PROJECT PROVISION OF CAR WASH SERVICES ENQUIRY NUMBER : MPP (SC) DATE: 19 SEPTEMBER 2014.
CERN Procurement Procedures for the HL-LHC project Civil Engineering work London, 24 June 2016 Lisa Bellini-Devictor, CERN/IPT-PI.
CERN Procurement Procedures Rome, 28 th June 2016 Adam Horridge.
2016 Floris Bonthond 31 May Agenda – Procurement at CERN 2 What does CERN buy? Procurement budget Industrial Return and Return Coefficients.
Doing business with CERN Anders Unnervik
Agenda Procurement organization and budget What does CERN buy?
Doing business with CERN Anders Unnervik
Doing business with CERN Dante Gregorio (dante.
Chisinau, Republic of Moldova 2017
Content of Tender Dossier - Instructions to Tenderers - Tenders
INVITATION TO TENDER PROCEDURE IT-4344/EP Design, Supply, Installation, Testing and Commissioning of a Cleanroom extension for the integration of ATLAS.
Purchasing supplies at CERN
Content of Tender Dossier Instructions to Tenderers
Invitation To Tender Procedure
Contract Award Procedures
Invitation To Tender Procedure IT – 4327/SMB Technical specification for the civil Engineering works for the construction of the new building.
IT-4130/EN Bidders conference
Cooperation between CERN and Ukrainian Industries 2017
TENDERING PROCEDURE IT-3981/EN
ALIGNMENT RULE PROCEDURE
International Open Tender
IT-4328/EN Bidders conference
History Dec 2015, FC Discussion about contract splitting
Suppliers without a Contract
Fasset Briefing Session
ALIGNMENT RULE PROCEDURE
Financial and Administrative presentation on PARTICULATES project
The meeting of INTOSAI Working GROUP on Public Procurement Audit July 4-5 Lisbon Abstract of State Audit Bureau of Kuwait in conducting the public procurement.
IT-4464/EN Bidders conference
EU/IMF 15 Day Rule.
Presentation transcript:

DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF HEATING, VENTILATION AND AIR-CONDITIONING (HVAC) SYSTEMS FOR THE PS ACCELERATOR INFRASTRUCTURE TENDERING PROCEDURE IT- 3869/EN Bjorn JENSSEN 1

TENDERING PROCEDURE Compulsory conference and visit : Compulsory conference and visit : Bids to be returned to CERN by: Bids to be returned to CERN by: Finance Committee: Finance Committee: Please do not request for information concerning the result before FC approval Please do not request for information concerning the result before FC approval Contract negotiation and notification Contract negotiation and notification Start of the contract : Start of the contract : Late September 2012 (commissioning of the systems in (commissioning of the systems in November 2013) November 2013) Bjorn JENSSEN 2

DOCUMENTATION Tender Form + Annexes Tender Form + Annexes Technical Specification + Annexes Technical Specification + Annexes « Selection and Adjudication criteria for supply contract » March 2012 « Selection and Adjudication criteria for supply contract » March 2012 General Conditions for Invitations to Tender CERN/FC/5312-I General Conditions for Invitations to Tender CERN/FC/5312-I General Conditions of CERN Contracts CERN/FC/5312-II General Conditions of CERN Contracts CERN/FC/5312-II Bjorn JENSSEN 3

CLARIFICATION PROCESS All questions shall be addressed in writing to All questions shall be addressed in writing to Bjorn JENSSEN CERN will respond to any request for clarification received earlier than 14 calendar days prior to the deadline for submission of bid ( ) CERN will respond to any request for clarification received earlier than 14 calendar days prior to the deadline for submission of bid ( ) CERN/s response will be sent to all bidders, including the request for clarification but without identifying its source CERN/s response will be sent to all bidders, including the request for clarification but without identifying its source Bidders shall acknowledge receipt of the acknowledge in cover letter with bid should each individual CERN clarification correspondence received Bidders shall acknowledge receipt of the acknowledge in cover letter with bid should each individual CERN clarification correspondence received Bjorn JENSSEN 4

BASIS OF AWARD Bjorn JENSSEN 5 Adjudication basis: The contract shall be awarded on a « lowest compliant » basis to the bidder whose bid complies with the technical, financial and delivery requirements and is the lowest* * Subject to the rules aiming at achieving well balanced industrial return coefficient for Member States (MS) PB= Poorly Balanced WB= Well Balanced

BASIS OF AWARD Selection and adjudication criteria – Concept Improve the distribution of our purchases among CERN MS Country of origin (for supplies) : the country (ies) where the supplies (including their components and assemblies) are manufactured or undergo the last major transformation by the contractor or his sub- contractor(s) Country of origin (for supplies) : the country (ies) where the supplies (including their components and assemblies) are manufactured or undergo the last major transformation by the contractor or his sub- contractor(s) Industrial return coefficient: The ratio between that Member State's percentage share of all purchases of supplies (excluding purchases funded by non-Member States) during the preceding four calendar years and that State's percentage contribution to the budget over the same period. Industrial return coefficient: The ratio between that Member State's percentage share of all purchases of supplies (excluding purchases funded by non-Member States) during the preceding four calendar years and that State's percentage contribution to the budget over the same period. Well balanced Member states: CH – CZ – FR – PL – PT Well balanced Member states: CH – CZ – FR – PL – PT The tender shall be treated as that from a poorly balanced PB MS provided that the value of supplies originating in one or more PB MS is not less than 51% of the total amount of the contract. The tender shall be treated as that from a poorly balanced PB MS provided that the value of supplies originating in one or more PB MS is not less than 51% of the total amount of the contract Bjorn JENSSEN 6

BASIS OF AWARD The alignment rules 1- Lowest bidder from PB MS Contract 1- Lowest bidder from PB MS Contract 2- Lowest bidder from well balanced (WB) MS 2- Lowest bidder from well balanced (WB) MS (If bid from PB MS is within a difference of < 20% negotiations) 1st bidder from PB MS aligns Contract1st bidder from PB MS aligns Contract If not - 2 nd bidder from PB aligns ContractIf not - 2 nd bidder from PB aligns Contract If not – Contract to lowest bidderIf not – Contract to lowest bidder Bjorn JENSSEN 7

PRICE BASIS All prices shall be quoted in CHF or EUR or the preferred currency of the bidder (if you wish to be paid in this currency), free of taxes, not subject to revision All prices shall be quoted in CHF or EUR or the preferred currency of the bidder (if you wish to be paid in this currency), free of taxes, not subject to revision Quantities indicated in the DQE are merely indicative. A change of the volume will not affect the unit prices. Quantities indicated in the DQE are merely indicative. A change of the volume will not affect the unit prices. Report the prices indicated in each of the chapters of the DQE into the tender form. Report the prices indicated in each of the chapters of the DQE into the tender form. Validity of the bid: 6 months from the closing date. Validity of the bid: 6 months from the closing date. Re-measurement contract: Final price of each of the contract shall be agreed to after re-measurement of the real quantities installed. Re-measurement contract: Final price of each of the contract shall be agreed to after re-measurement of the real quantities installed Bjorn JENSSEN 8

VAT Prices shall take into account CERN’s exoneration from VAT and import duties Prices shall take into account CERN’s exoneration from VAT and import duties VAT shall be subject to the rules and invoicing instructions as defined under the following link: VAT shall be subject to the rules and invoicing instructions as defined under the following link: OR Bjorn JENSSEN 9

PAYMENT CONDITIONS (1 of 2) Bjorn JENSSEN 10

Bjorn JENSSEN 11 PAYMENT CONDITIONS (2 of 2)

Services covered in IT-3869/EN shall be delivered on the Swiss the CERN site. CERN’s privileges and immunities do not apply to firms intervening on the CERN site. Firms intervening on CERN’s site remain subject to their national legislation and shall comply with the Ordre Public rules applicable on the territory where the intervention takes place Relations with Host States

Switzerland / Suisse : Office cantonal de l'inspection et des relations du travail (OCIRT) Rue des Noirettes 35 CH-1227 Carouge T F France : Direction régionale des entreprises, de la concurrence, de la consommation, du travail et de l’emploi (DIRECCTE) Rhône-Alpes – Unité territoriale de l’Ain 34 avenue des Belges Quartier Bourg centre F Bourg-en-Bresse cedex T F Switzerland / Suisse : Office cantonal de l'inspection et des relations du travail (OCIRT) Rue des Noirettes 35 CH-1227 Carouge T F France : Direction régionale des entreprises, de la concurrence, de la consommation, du travail et de l’emploi (DIRECCTE) Rhône-Alpes – Unité territoriale de l’Ain 34 avenue des Belges Quartier Bourg centre F Bourg-en-Bresse cedex T F

RETURN DATE Bids shall be returned to CERN no later than: Bids shall be returned to CERN no later than: Bjorn JENSSEN 14

CONTACT FOR INFORMATION Bjorn JENSSEN Tel: Fax: Always put in cc: Bjorn JENSSEN 15