Progress on the MICE RF High Power Drive Systems K Ronald, University of Strathclyde For the MICE RF team 1MICE CM38 RF Parallel Session.

Slides:



Advertisements
Similar presentations
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
Advertisements

RF Specification discussion MICE RF workshop 16 th April 2012.
1 RF Workshop 16 th & 17 th April 2012 Design Layout Alan Grant, STFC.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
HIGH POWER SYSTEMS FOR WIND PROFILER K. P. Ray K. P. Ray Society for Applied Microwave Electronics Engineering & Research IIT campus, Powai, Mumbai-400.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
RF Layout 3pi/2 for Discussion. 2 RF Design mtg 14/1/15 Output line from amplifier is lower than the PRY, needs to go high to clear PRY to couple to South.
Status of the MICE RF System K Ronald, University of Strathclyde For the MICE RF team 1MICE Project Board, 17th April 2015.
THE MICE RF SYSTEM J.F.Orrett* A.J.Moss, ASTeC, Daresbury Laboratory, WA4 4AD, UK Accelerator Science and Technology Centre
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
Daresbury MICE Progress Andrew Moss Joe Orrett Peter Corlett.
Paul Drumm 9 Feb 2004 MICE at RF system: power source, distribution Paul Drumm RAL Ambitious title!
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
Status of the MICE RF System K Ronald, University of Strathclyde For the MICE RF team 1MICE Project Board, 17th April 2015.
Status of the MICE RF System K Ronald, University of Strathclyde For the MICE RF team 1MICE Project Board, 17th April 2015.
RF Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Andrew Moss Daresbury Laboratory Collaboration Meeting th -16 th February 2013 Coseners House MICE RF HP System rprogress.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Progress on the MICE RF Systems K Ronald, University of Strathclyde For the MICE RF team 1MICE Project Board 14th November 2013.
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
MICE RF – TIARA and General Progress Tim Stanley RAL 5 June 2013.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
Electrical & Control Power Supplies Trevor Hartnett.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Anders Sunesson RF Group ESS Accelerator Division
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
XII-th Collaboration MeetingJan 18, House1 LOI PROGRESS: JANUARY 2008 AT THE HALL 2 Yoshiro Irie, KEK for the LOI/SH collaboration.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
Status of the MICE RF System K Ronald, University of Strathclyde For the MICE RF team 1MICE Project Board, 30 th April 2014.
RF Review CM37 Andrew Moss. Amplifier results at Daresbury 2MW at 35kV, good efficiency and gain.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
The MICE RF System K Ronald, University of Strathclyde For the MICE RF team 1MICE RF Review, 9th September 2015.
650 MHz Solid State RF Power development at RRCAT
Status of the MICE RF System K Ronald, University of Strathclyde For the MICE RF team 1MICE Project Board, 6th April 2016.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
MICE RF – Installation at RAL Tim Stanley, MICE RF Engineer, RAL 2 June 2014.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
Andrew Moss STFC, ASTeC Example amplifier control system Example of current STFC copper cavity in operation –Using SF6 insulated waveguide –Conditioning.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
MICE Demonstration of Ionisation Cooling Colin Whyte University of Strathclyde On behalf of the MICE collaboration 1RF Review 9th-10th Sept. 2015, Abingdon.
Standalone Commissioning Plan in MICE Hall K Ronald, University of Strathclyde For the MICE RF team 1MICE RF Review 9th Sept 2016.
DESIGN OF A 9MHZ 15KW CW AMPLIFIER FOR RHIC Shane Dillon CTO.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Areal RF Station A. Vardanyan
Status of the MICE RF System
MICE RF System Power Supplies, Control and Monitoring Status report
RF Layout 3pi/2 for Discussion
An X-band system for phase space linearisation on CLARA
Progress on the MICE RF Systems
12 GHz High Power RF components requirements for CEA activities
CEPC RF Power Sources System
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Presentation transcript:

Progress on the MICE RF High Power Drive Systems K Ronald, University of Strathclyde For the MICE RF team 1MICE CM38 RF Parallel Session

Requirements of the MICE HPRF system To demonstrate sustained cooling (MICE Step VI) requires 8 cavities at 8MV/m Driver system must provide 1MW to each cavity (500kW on each coupler) at MHz Provide required energy with four 2MW amplifier chains Duty cycle is for 1ms pulses at 1Hz Relatively tight space constraints behind the shield wall Not significantly eased by the switch to the return yoke Distribution network must not impede service access to cooling channel Proposed to use LLRF phase control of 0.5 o with 1% in amplitude regulation Use LLRF 4 system developed by L. Doolittle Recent work has included Demonstration of the required 2MW power from the first, modernised amplifier chain Transport of the amplifier to the MICE Hall Installation and testing to meet the EU-TIARA deliverable Completion of the major University of Mississippi MRI activity 2MICE CM38 RF Parallel Session

High Power Driver System The RF cavities are to be driven in adjacent, coupled pairs with a fixed phase angle between coupled pairs Each coupled pair to be driven by a 2MW, MHz amplifier chain Arbitrary phase control between separate coupled pairs of cavities SSPA (~4kW) driving Tetrode (~250kW max) driving Triode (2MW max) Since last summer all issues with the Power Supply and valve seating have been successfully resolved Key difficulty was a faulty thyratron valve in the crowbar (protection) circuit Temporary solutions with lower specification switch Required reduced operating specification to protect TH116 e2v Technologies offered outstanding support Three prototype thyratron valves made available to project Stable operation at required bias voltage possible Allowed correct tuning of amplifier to be realised 3MICE CM38 RF Parallel Session

Demonstration of required RF signal Once tuned the amplifier chain operated at the desired pulsed output level, 1Hz, 1ms, 2MW, MHz 4MICE CM38 RF Parallel Session a)HT feedline, b)Output 9 inch coaxial line, c)Input 3 inch line Team developed for RF tests and installation at MICE A. Moss and C. White (Daresbury) have worked with T. Stanley (RAL), K. Ronald, C. Whyte and A. Dick (Strathclyde) and S. Alsari (Imperial) This provides the team required to operate the system at MICE

High Power Driver System Triode DC bias and drive brought up together Maintaining ~10dB gain Performance achieved: 2.06MW output RF 34kV bias voltage 129A forward average current  =46% (electronic) Gain 10.8dB Input port return loss -12.5dB VSWR 1.6 Drive from Tetrode 170kW output RF 18kV bias voltage 15.5A forward average current  =61% (electronic) Gain 19dB 5MICE CM38 RF Parallel Session Drive from SSPA 2.27kW Drive from synthesised oscillator 3.7dBm

Distribution network 6 Amplifiers installed behind shield wall Triodes on main floor, Tetrodes on Mezzanine Impact of B-fields negated by yoke Line installation planed before yoke support risers High power dynamic phase shifters removed 4 off 6 inch coax lines over wall Pressurised to increase power handling Hybrid splitters moved - more accessible Minimises clutter and increases service access to the amplifier stations Line lengths matched using 3D CAD Manually adjustable line trimmers installed at cavity to take up assembly errors in coax length Easier to assemble – introduced flexible coax Allows for small misalignments 2 Hybrids split output from the Berkeley Amplifiers (one on amplifier side of wall) CERN amplifiers have two outputs 9 hybrids on MICE side of shield wall Split power for the opposed couplers of each cavity Lines will be pressurised with 2Bar Nitrogen Amplifiers behind Shield Wall Distribution Network to MICE MICE CM38 RF Parallel Session

Distribution network and components Through work of D. Summers, Univ. Mississipi and the US NSF MRI programme: Vast majority of distribution network procured Encompasses Loads, Hybrid Couplers, Reducers, Gas Barriers, Directional Couplers, elbows, line trimmers, etc In addition Mississippi have procured key components to build further amplifiers chains and components for the RF cavities, including Capacitors and Chargers Tetrode valves and tetrode valve amplifier enclosures LLRF boards Tuner components for cavities Some $1M (US) delivered to RAL under MoU between STFC and Univ. of Mississippi Total consignment > 6 tonnes 7MICE CM38 RF Parallel Session

Installation at the MICE Hall (ICTF) 8 MICE CM38 RF Parallel Session At last report – Entire amplifier chain and PSU’s transported to ICTF at RAL – Installation underway to demonstrate practicality of operation in situ – Due to space constraints large 2MW loads not suitable in ICTF Test to maximum power rating of reject load 2.06MW operation therefore previously demonstrated at Daresbury Will be able to achieve full power ICTF once cavities are available Revised installation plan

MICE Installation Progress Services – Water cooling (high quality de-ionised water) and compressed air installation complete – Water cooling distribution panel tested – Provides cooling to triode and tetrode systems – Monitors flows rate – Monitors coolant Temp 9 MICE CM38 RF Parallel Session

MICE Installation Progress Images showing Tetrode amplifier and power supplies installed – Required quite accurate alignment due to rigid coaxial wavevguides 3” (250kW) line installed to triode amplifier SSPA and synthesised oscillator installed 10 MICE CM38 RF Parallel Session Tetrode Amp 3” O/P Line Tetrode HT PSU AUX and SSPA Top Cap Triode Amp AUX rack Triode HT rack

MICE Installation Progress Images showing triode amplifier and valve installed 3” input line (250kW) line installed from tetrode amplifier 6” output line (2MW) installed with reject load 11 MICE CM38 RF Parallel Session Craning in of 2MW amplifier 3” Input 3” line from tetrode 8” to 6” adapter And 6” output line InputTuning Box 2MW amplifier In situ Triode Top Cap with Valve

ICTF electrical installation Completed during December for both Tetrode & Triode amplifiers – HT, Heater and control circuit installation – RF links between Oscillator and SSPA – Cabling (and cooling) installed in trays suspended from Mezzanine – Will be tested to maximum power capacity of reject loads 12 MICE CM38 RF Parallel Session

Installation and Tests in MICE Hall 13 TIARA requirement: Demonstrate the prototype amplifier operating in the MICE RF power station Amplifier No.1 dismantled at DL and Transported to RAL Includes SSPA, Preamplifier and Final Stage Amplifier subsystems with PSU’s Extensive water and air distribution systems installed Pre-amplifier operating since the 4 th December Final stage operating since the 12 th December Installation and operation achieved slightly ahead of a tight timetable Testing progressed very successfully: Power limited only by load capacity At present space constraints limit size and power capacity of the RF load Triode Performance -531kW output RF -22kV bias voltage -Gain 10.8dB -Input port return loss 11dB -Drive from Tetrode 44kW MICE CM38 RF Parallel Session

LLRF development Exploits two LLRF4 boards from LBNL – now purchased Agreements with LBNL established to develop system Basic design of hardware and software is done Daresbury have tested all major features, including the feed-forward control system on a recent 1.3GHz system (separate project) Design remains fundamentally unchanged Hardware and software can be applied to MICE MHz Requires straightforward modification of the analogue system Can be achieved in ~ 3 months Systems in use already with EPICS control Prior to cavities arriving, can build cavity simulator Allows testing of the timing diagnostic 14MICE CM38 RF Parallel Session

Summary High Power Drivers Have achieved specification on system No.1, 2MW for 1ms at 1Hz and MHz Installation of system No.1 at RAL complete Tested to 500kW (limit of reject loads) in December Meets TIARA deliverable requirement TIARA reports submitted: Opportunity for Newsletter article Major procurement effort complete Vast majority of components required for distribution network Many components required for amplifiers and LLRF work Immediate Future Commissioning of systems No.2-4 (2 nd tetrode cavity already tested to 250kW) Testing continuing at RAL and shortly to resume at Daresbury Upgrade PSU’s for remote control PSU’s will return to Daresbury in early spring for upgrade from HT circuit prototype to ‘production ready’ prototype Will be used to test the second amplifier system Reduces the number of ‘new’ elements in the system Makes fault finding faster and hence commissioning more efficient 15MICE CM38 RF Parallel Session