State Scientific Center of Russian Federation Institute for Theoretical and Experimental Physics ( ITEP )

Slides:



Advertisements
Similar presentations
R Scrivens, CERN, ABI Workshop, 12/2008 The Feschenko Bunch Shape Monitor User experience at CERN Developed by INR, Troitsk. High resolution bunch shape.
Advertisements

Bunch shape monitor for Linac-4 A.V.Feschenko Institute For Nuclear Research (INR), Moscow , Russia.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
BPS Location in CTF3/CLEX Area Mechanics with PCB Electronics Test Results BPS Linearity Error A linear fit of the wire test measures was done (left) for.
1 Secondary Emission Beam Profile Monitor H. Haseroth, CERN.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
FFAG Workshopfermilab April 2005 f Summary: FFAG WORKSHOP nonscaling electron model muon FFAGs C. Johnstone Fermilab.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
Carbon Injector for FFAG
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Crystal channeling 2009 A. Afonin, IHEP, Protvino New results of use and research of crystals at U-70. A.Afonin, IHEP, Protvino 4- th Crystal channeling.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
FFAG-Workshop Dec Kumatori Japan Diagnostics for FFAG- accelerator Takahisa ITAHASHI Department of Physics, Osaka Univ. Toyonaka, Osaka, ,Japan.
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
K. Matsuoka (Kyoto Univ.) for T2K muon monitor group
A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.
G. Ferioli, R. Jung - LHC-BI Review Workshop November 19&20 LHC Screen Profile Monitors G. Ferioli, R. Jung Introduction BTV LHC layout Monitor set-up.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Matching monitors for SPS and LHC E. Bravin 31 March 2011.
IPM EM Simulations 9 th DITANET Topical Workshop on Non-Invasive Beam Size Measurement for High Brightness Proton and Heavy Ion Accelerators April.
L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities Peter Forck, JUAS.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
First Demonstration of Optics Measurement and Correction during Acceleration Chuyu Liu Collider Accelerator Department, BNL.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
Challenges in Beam Instrumentation Rhodri Jones (BE/BI) LIU-2011 Event, 25 November 2011, CERN.
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
1 NBI Rh. Jones (CERN - AB/BDI) CNGS Target Area Beam Position Monitors OUTLINE 1.Recap of Requirements & Layout 2.Monitor Candidates -Secondary.
The LHC Beam Position System Ad-hoc Working Group on LHC Experiment-Machine Parameter and Signal Exchange 26 th March 2002 Rhodri Jones (SL/BI)
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
ApEx needs for CeC PoP Experiment December 11, 2015.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
ESS Front End diagnostic
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
IPM Simulations at Fermilab 3-4 March 2016 Randy Thurman-Keup.
EUROTeV Diagnostics WP5
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Experiments on Fast Ion Instability at PLS
A. Martynov on behalf of accelerator division.
Analysis of optical IPM data
standard THGEM versus FLOWER
P. Forck, P. Kowina, M. Schwickert, R. Singh
Preliminary Electron Transportation Channel Project for EIC Facility (FAIR, Germany) Dmitry Berkaev Budker Institute of Nuclear Physics, Russia, ,
    BEAM POSITION MONITORS USING A RE-ENTRANT CAVITY C. Simon1, S. Chel1, M. Luong1, P. Contrepois1, P. Girardot1, N. Baboi2 and N. Rouvière3.
ERL BPM System Mike Billing, Mark Palmer
Use of Beam Loss Monitor type detectors in CNGS muon station
Beam Current Monitoring with ICT and BPM Electronics
Electron cloud studies at CESR
CLIC damping rings working plan towards the CDR
FEL-Beam-Dynamics Group
Proposal for a CESR Damping Ring Test Facility
Presentation transcript:

State Scientific Center of Russian Federation Institute for Theoretical and Experimental Physics ( ITEP )

FAIR meeting on 19 March 2009 (Protvino) FAIR. Expression of interest from ITEP SIS 300 beam diagnostics

FAIR meeting on 19 March 2009 (Protvino) Diagnostic elements Comfort'In house'In collaboration' SIS 100BPM50% Closed orbit feedback 10% Wall current monitor50% Ionization profile monitor60% SEM grid50% SIS 300BPM50% Wall current monitor50% Ionization profile monitor60%>60% SEM grid50%>50% CRBPM50% Wall current monitor50% Ionization profile monitor 40% SEM grid50% RESRBPM50% Ionization profile monitor 40% HESRBPM50% >50%

FAIR meeting on 19 March 2009 (Protvino) Beam position monitor challenges  Wide range of currents  Tight requirements for position accuracy for intense beams – Δx < 0.1mm, x = ±100mm Beam position monitor features  A special attention to pick-up construction  Careful design of front-end electronics

FAIR meeting on 19 March 2009 (Protvino) BPM Applications distortion SIS100/300 Turn-by-turn variation of any bunch in the train Closed orbit feedback Bunch-by-bunch operation to get a distinguish between bunches reaction Lattice function

FAIR meeting on 19 March 2009 (Protvino) Example of a electrode arrangement for a linear-cut BPM and the scheme of the position determination.

FAIR meeting on 19 March 2009 (Protvino) BPM electronics

FAIR meeting on 19 March 2009 (Protvino) BPM basestation with analog front-end

FAIR meeting on 19 March 2009 (Protvino) BPM timetable (rough estimation)

FAIR meeting on 19 March 2009 (Protvino) Ionization profile monitor  Advanced concept with high resolution and fast profile measurements  IPM is a subject of GSI-ITEP collaboration

FAIR meeting on 19 March 2009 (Protvino) Ionization profile monitor. Fast profile readout.

FAIR meeting on 19 March 2009 (Protvino) Permanent magnet quadrupole at one of the ITEP synchrotron output channel Examples of ion beam optic elements constructed in ITEP on the base of permanent magnets PM Lens design and rods magnetization scheme for 352 MHz Prototype Alvarez DTL Tank for the CERN SPL

Secondary emission monitor FAIR meeting on 19 March 2009 (Protvino) Construction drawing (overview from the front side) of a typical profile grid. To reduce the number of required signal processing channels, a larger spacing outside the center has been chosen. Roughly estimated number of secondary electrons per incident ion with the energy of incident ion as a parameter. The data have been scaled ~z1.5 from various data found in the literature

FAIR meeting on 19 March 2009 (Protvino) SEM-grid timetable (rough estimation)

FAIR meeting on 19 March 2009 (Protvino) Wall Current Monitor Scheme of an inductive wall current monitor and the realization for CERN LINAC 2 The realization of a wall current monitor at a Ø 40 mm beam pipe for CTF

FAIR meeting on 19 March 2009 (Protvino) WCM electronics timetable (rough estimation)

FAIR meeting on 19 March 2009 (Protvino) Diagnostic elements Comfort'In house'In collaboration' SIS 100BPM50% Closed orbit feedback 10% Wall current monitor50% Ionization profile monitor 60% SEM grid50% SIS 300BPM50% Wall current monitor50% Ionization profile monitor60%>60% SEM grid50%>50% CRBPM50% Wall current monitor50% Ionization profile monitor60% SEM grid50% RESRBPM50% Ionization profile monitor60% HESRBPM50% >50%

FAIR meeting on 19 March 2009 (Protvino)