Andrew Faulkner1 DS4 Deliverables 4 th SKADS Workshop, Lisbon DS4 Deliverables Andrew Faulkner.

Slides:



Advertisements
Similar presentations
SKAMP Square Kilometre Array Molonglo Prototype. Supporting Institutions  University of Sydney  Argus Technologies  ATNF  ICT Centre.
Advertisements

Integrated Receivers for the SKA Suzy Jackson (CSIRO ATNF – Macquarie)
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Jan Geralt Bij de Vaate DS4-T4 Wideband Integrated Antennas DS4-T4 Jan Geralt Bij de Vaate ASTRON.
System R&D on Multi-Standard RF Transceiver for 3G and beyond Advanced System Technology.
CERDEC-06/27/ Digital Array Radar Technology Development March 20, 2007 Dr. Barry S. Perlman Associate Director for Technology US Army CERDEC.
Built-In Self-Test for Radio Frequency System-On-Chip Bruce Kim The University of Alabama.
AAVP Workshop December 2010 SKA 1 AA-low design. AAVP Workshop December 2010 SKA 1 AA-low design SKA 1 AA-low is a major System: >10x LOFAR sensitivity.
SKA TDP Receiver Antenna Interface March 21, 2008 Total system noise contributions Choice of operating temperature Wideband feeds.
BDT Radio – 2b – CMV 2009/10/09 Basic Detection Techniques 2b (2009/10/09): Focal Plane Arrays Case study: WSRT System overview Receiver and.
Polar Loop Transmitter T. Sowlati, D. Rozenblit, R. Pullela, M. Damgaard, E. McCarthy, D. Koh, D. Ripley, F. Balteanu, I. Gheorghe.
March 2009LOFAR MKSP Update: SKA and PrepSKA Paul Alexander.
Prototype SKA Technologies at Molonglo: 2. Antenna and Front End G.B. Warr 1,2, J.D. Bunton 3, D. Campbell-Wilson 1, R.G. Davison 1, R.W. Hunstead 1, D.A.
Sascha D-PAD Sparse Aperture Array.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
Dec 2010 AAVP Cambridge workshop AAVP AAVS1/2-low demonstrators Jan Geralt Bij de Vaate.
Keith Grainge Calibration requirementsAAVP 2010 Calibration and Imaging Requirements Keith Grainge (plus teams at ASTRON, Oxford, Cambridge)
What’s Going on in Canada?
Multi-beam Patch Antenna Design Mustafa Konca Supervisor: Prof. Dr. Sener Uysal.
LOFAR Antenna Systems Dion Kant, Wim van Cappellen AAVP – 10 December 2010, Cambridge, UK.
CSIRO. Paul Roberts Digital Receivers SKANZ 2012 Digital Receivers for Radio Astronomy Paul Roberts CSIRO Astronomy and Space Science Engineering Development.
Name1 title 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Progress in Active Antenna Design and Developement - FIDA3 Timothy Finn FG-IGN
Name1 SKA(DS) System Design Aspects 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKA(DS) System Design Aspects: building a system Laurens Bakker.
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
SKA-Japan Industry Forum [SKA-Japan Workshop 2010] EMC & Microwave Systems November 05, 2010.
Georgina Harris1 2-PAD 4 th SKADS Workshop, Lisbon, 2-3 October Polarisations All Digital Dr Georgina Harris / Prof Tony Brown SKADS System Design.
Jader Monari1 BEST receivers 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Jader Monari IRA -INAF- Bologna –Italy-
Bi-Directional RF Data Communication A Robot Control Device Team BDRFC.
Space-Time Digital Filtering of Radio Astronomy Signals using 3D Cone Filters Najith Liyanage 1, Len Bruton 2 and Pan Agathoklis 1 1 Department of Electrical.
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
Eloy de Lera Acedo 2 nd SKADS Workshop October 2007 DS4T4 Differential Dual Polarized Antenna Array Design - Eloy de Lera Acedo - Research Associate.
S. Montebugnoli 2 nd SKADS Workshop October 2007 Stelio Montebugnoli IRA - INAF- Italy.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
Multiuser Detection (MUD) Combined with array signal processing in current wireless communication environments Wed. 박사 3학기 구 정 회.
Philippe Picard1 System Design 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Aperture Arrays system design Front end RF combining: an efficient way to.
André van Es 2 nd SKADS Workshop October 2007 Review on Deliverables and forward look André van Es.
Andrew Faulkner1 Technology Readiness Levels 4 th SKADS Workshop, Lisbon Technology Readiness Levels TRLs Andrew Faulkner.
Andrew Faulkner1 SKADS and SKA 4 th SKADS Workshop, Lisbon SKADS and SKA Andrew Faulkner.
The BEST-2 SKA pathfinder is composed by 32 receivers. The front ends are installed on the focal lines of 8 cylinders, offering a collecting area of about.
Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 S.Montebgnoli IRA -INAF- Bologna –Italy- 4 th SKADS Workshop, Lisbon, 2-3 October.
1 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 EMBRACE Deliverable Status overview G.W. Kant ASTRON, The Netherlands.
1 SMART ANTENNAS FOR TDMA Jack H. Winters AT&T Labs - Research Red Bank, NJ September 7, 2000.
AAs in PEP Jan Geralt Bij de Vaate. PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction.
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
SKA DRAO SKA success dependent on technology development –major improvements in price/performance Survey Speed -> (A eff / T sys ) 2 x Field of View.
Andrew Faulkner 2 nd SKADS Workshop October 2007 SKADS Benchmark Scenario Andrew Faulkner.
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
S.Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Stelio Montebugnoli IRA -INAF- Bologna –Italy- SKADS 4th -Lisbon- Oct 2-3, 2008.
Ariadne’s Thread Kristian Zarb Adami. Simulator Aims ۞ Provide the system architect a tool to visualise trade-offs in designs ۞ Provide the scientist.
System designAA Consortium - BolognaOctober 2012 AA Consortium The path to AAVS1 22 October 2012.
2 nd SKADS Workshop October 2007P. Colom & A.J. Boonstra 1 Outline -progress in RFI mitigation (methods inventory) -system design & RFI mitigation:
O. García-Pérez (FG-IGN) 1FIDA3 Wide Field Astronomy and Technologies for the SKA, Limelette, 4-6 November 2009 FIDA3: A Novel Active Array for the Mid-SKA.
WELCOME TO IHEP. RF Phase Control for BEPCII Linac Accelerator Wenchun Gao.
Philippe Picard 2 nd SKADS Workshop October 2007 Station Processing Philippe Picard Observatoire de Paris Meudon, 11th October 2007.
Abstract The purpose of this project is to design a high-performance FPGA-controlled amplifier for Teradyne Corporation. This will constitute Phase IV.
Dr Danielle Kettle1 LNA progress 4 th SKADS Workshop, Lisbon, 2-3 October 2008 LNA progress.
Paul Alexander1 DS3 Deliverable Status 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS3 Deliverables Review.
Antenna Arrays and Automotive Applications
6 May 2009Lynn Baker AWG Meeting LA1 TDP Antenna and Feed Plan Lynn Baker Antenna Working Group Meeting Los Angeles, CA May 6, 2009.
Cosmic Microwave Technology, Inc.
Digital Receivers for Radio Astronomy
ALICE INDUSTRIAL AWARD for its collaboration to the ALTRO Chip
Medichats 14 October 2008 ADC bit number and input power needed, in new radio-astronomical applications View of the Medicina Radiotelescopes - Italy Eng.
Focus areas Internet of Things (IoT) Network and Cloud SW
IRA – INAF Bologna (I) DS-6 16 September 2018 SKADS Workshop 2006
Technical Foundations & Enabling Technologies – DS4
SKADS White Paper - Technologies -
Multi-band Modulation, Coding, and Medium Access Control
DS4-T1 FRONT-END TECHNOLOGIES
SKA PEP - Dish Array WP5 Phase 1 Dishes with Single Pixel Feed Systems
Presentation transcript:

Andrew Faulkner1 DS4 Deliverables 4 th SKADS Workshop, Lisbon DS4 Deliverables Andrew Faulkner

Andrew Faulkner2 DS4 Deliverables 4 th SKADS Workshop, Lisbon 1. Establish benchmark LNA simulations to provide performance feedback for device process development for various semiconductor technologies. 2. RF on wafer (RFOW) measurements on device wafers fabricated (Maximum of 6 iterations), extract scaleable equivalent circuit model. 3. Design, fabrication and testing of SiGe band pass filter using PIC Technology 4. LNA design techniques simulation study – determine optimum design approach, including consideration of circuit topologies best suited for achieving wide operating bandwidth, linearity, low noise temperature, high yield and low cost 5. ADC Design rule established and recommended ADC architectures selected. 6. ADC building blocks design, fabrication and performance T1: Front End technologies - 1 Due: T Act: T &18 OK

Andrew Faulkner3 DS4 Deliverables 4 th SKADS Workshop, Lisbon 7. Design, manufacture and test of hybrid LNA using novel discrete devices developed in programme (two iterations) 8. Fabricate and test Integrated ADC circuits 9. Fabricate and test of advanced integrated interconnect technologies with Si and GaAs technologies. 10. Fabricate and test further LNA technologies – iterations 2 and Fabricate and test further ADC technologies - iterations 2 and Final report on different semiconductor technologies Due: T Act: T0+ 1 st done In prog. 6 mth delay OK TBD T1: Front End technologies - 2

Andrew Faulkner4 DS4 Deliverables 4 th SKADS Workshop, Lisbon T2: Signal Control & Digitisation 1. Wide band, high dynamic range A/D blocks (task linked with DS4-T1 and DS4-T3) 2. Digital Down Converters 3. Sizing of the digital word at the different levels of the system chain 4. Low cost Poly-Phase filter banks 5. Data distribution and synchronization 6. A quasi-perfect reconstruction equi-spaced filter bank channelizer Due: T Act: T0+ Done OK

Andrew Faulkner5 DS4 Deliverables 4 th SKADS Workshop, Lisbon T3: RFI mitigation techniques 1. Develop RFI mitigation strategies for the phased-array concept of SKA, at a station level and for the instrument as a whole; 2. Assess the influence of these methods on data quality; 3. Assess the cost effectiveness of these methods for the RFI environment of the selected SKA site; 4. Demonstrate practical RFI mitigation techniques for the EMBRACE and BEST SKADS demonstrators in particular, and in more general terms for focal plane arrays. Due: T Act: T Much of this work has been late starting and limited on resource Also, cyclostationary interference studies have been added There is little impact on other tasks The work will be completed by the end of SKADS Pretty much done

Andrew Faulkner6 DS4 Deliverables 4 th SKADS Workshop, Lisbon T4: Wideband integrated antennas Due: T0+ 48 Act: T0+ OK ?? OK 1. Wide band integrated antenna, dual polarization 2. Low cost antenna technology 3. Low cost packaging solutions 4. Low cost analogue photonic link 5. Reports on all of the above deliverables 6. Publications and PhD thesis

Andrew Faulkner7 DS4 Deliverables 4 th SKADS Workshop, Lisbon T5: Beam forming at patch level Due: T Act: T OK 25 OK 1. Prototype analogue beamformer in GaAs for EMBRACE. Superceded by Deliverable 2 – Si. 2. Prototype of a lower cost analogue beam-former in Silicon (not in time for EMBRACE.) 3. Prototype digital beamformer for 2-PAD. 4. Architecture design for the whole digital beam-forming system for 2-PAD. 5. A final report on the trade-offs and cost-effectiveness of analogue and digital beam-forming systems.

Andrew Faulkner8 DS4 Deliverables 4 th SKADS Workshop, Lisbon T6: The 2-PAD demonstrator Due: T Act: T0+ 42 OK 48 OK 1. Dual polarization all-digital tile 2. Design documentation package for all-digital tile 3. Test environment for prototype all-digital tile. 4. Evaluation report of tile performance. 5. Tile cost estimates projected for SKA volumes and timescales. 6. Reliability analysis report. 2-PAD is entering a critical phase. It appears to be tight but on time Cost estimates will be part of DS3-T3 Cost modelling

Andrew Faulkner9 DS4 Deliverables 4 th SKADS Workshop, Lisbon Summary We anticipate meeting all deliverables by end SKADS DS4-T2 is in the process of catching up 2-PAD is entering a critical phase It is essential that the quality of the deliverables meets SKA requirements The results of this development work are vital to ongoing work in PrepSKA era.