Our River Forecasting is in Hydraulics Team Members Evaluation of Hydraulic Models July 2007 Office of Hydrologic Development Hydraulics Group.

Slides:



Advertisements
Similar presentations
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
Advertisements

Free Mini Course: Applying UML 2.0 with MagicDraw.
Chapter 6 The Process of Interaction Design Presented by: Kinnis Gosha, Michael McGill, Jamey White, and Chiao Huang.
Chapter 1 Assuming the Role of the Systems Analyst
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
HEC-RAS.
Systems Analysis and Design in a Changing World, 6th Edition
1 Computer Systems & Architecture Lesson 1 1. The Architecture Business Cycle.
Advancing Government through Collaboration, Education and Action Financial Innovation and Transformation Shared Services Workshop March 17, 2015.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Michigan Career Education Conference February 6, 2012.
Introduction to Systems Analysis and Design Trisha Cummings.
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
David Ramirez, P.E. Senior Hydrologist Lower Mississippi River Forecast Center Slidell, LA Real-Time Operation of HEC-RAS at the Lower Mississippi River.
1 CHPS National Weather Service/ABRFC Implementation of Community Hydrologic Prediction System (CHPS)
Industrial Engineering Roles In Industry
Feb 2003HEC-RAS Version 3.11 Slides adapted from HEC Unsteady Flow Course Unsteady Flow Course.
Business Analysis and Essential Competencies
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Commonwealth of Massachusetts Statewide Strategic IT Consolidation (ITC) Initiative ANF IT Consolidation Website Publishing / IA Working Group Kickoff.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
AGENDA Introduction to Virtual Mechanic Demo Architectural diagram and summary QA steps and user acceptance testing Bugs in the software Feedback from.
HAZUS-MH is a multi-hazard risk assessment and loss estimation software program developed by the Federal Emergency Management Agency (FEMA). (animate on.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
A JOINT PROJECT OF MISSISSIPPI STATE UNIVERSITY AND the Lower Mississippi River Forecast Center PROJECT FUNDED BY NOAA/OAR THROUGH THE NORTHERN GULF INSTITUTE.
NWS FLDWAV ANALYSIS TOOL
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
FLDWAV to HEC-RAS Transition Software Development (HEC-RAS into CHPS) Science and Modeling –Develop and evaluate model transition procedures –Build HEC-RAS.
Washington State Office of Insurance Commissioner State Insurance Management & Business Application Project Recap November 2007.
Systems Analysis and Design in a Changing World, Fourth Edition
Fusion Team Brief Missouri Basin River Forecasters’ Meeting Kansas City, MO Tuesday, 16 November 2010.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
9 Systems Analysis and Design in a Changing World, Fourth Edition.
U.S. Department of the Interior U.S. Geological Survey Marie C. Peppler USGS FIM Program Liaison Flood Inundation Mapping Program Project needs overview.
IWRSS & Fusion Team Brief Missouri Basin River Forecasters’ Meeting Wednesday, January 29, 2014 Noreen Schwein National Hydrologic Services Policy Leader.
Modeling Inline Structures using HEC-RAS Version 3.1
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
National Weather Service Water Predictions for Life Decisions Hydraulics Group Reggina Cabrera Office of Hydrologic Development Hydrologic Science and.
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
HEC-RAS Version 3.1 Overview
OHD’s Hydraulics Group & Future of Hydraulic Modeling.
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
Flood Inundation Mapping Program
RFC Service Enhancements and Support Concepts for Service Evolution HIC Meeting January 30, 2007.
AHPS Update HIC Meeting July 11, AHPS Update NRC AHPS Report NRC AHPS Report FY07 Planning FY07 Planning Program Execution and Tracking Program.
M ODESTO I RRIGATION D ISTRICT | T URLOCK I RRIGATION D ISTRICT FERC PROJECT N O Don Pedro Reservoir 3-Dimensional Temperature Model.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
Flood Forecast Mapping in AHPS October 28, /28/2003MARFC/NWS/NOAA Outline Definition Requirements Processing Tasks –One-time –Routine Test Area.
CS223: Software Engineering Lecture 16: The Agile Methodology.
Focus areas of the NWS Missouri/Souris River Floods of May-August 2011 Service Assessment – Per the NOAA and NWS Strategic Plans, gather stakeholder input.
River Mechanics Activities River Mechanics Group Hydrology Laboratory Office of Hydrologic Development National Weather Service National Oceanic and Atmospheric.
1 Toward Modeling of River-Estuary-Ocean Interactions to Enhance Operational River Forecasting in the NOAA National Weather Service Hassan Mashriqui Seann.
When we last met… Issues on the table for NERFC included: Commence migration activities Transition to GFE QPF production Test & Evaluate Daily QC as a.
Are you looking for an opportunity to join a company that has a long history and an exciting future? A place where you can grow within an international.
Fusion Team Brief Missouri Basin River Forecasters’ Meeting Wednesday, January 25, 2012 Noreen Schwein Deputy for Hydrologic Services NWS Central Region.
Planning Engagement Kickoff
5th Shire River Basin Conference 22 February 2017 Shire River Basin Management Project Shire Basin Planning Tool Sub-Component A1 Development of a.
Chapter 24: Architecture Competence
Identify the Risk of Not Doing BA
Lecture 17 ATAM Team Expertise
Capital Asset Projects executed by the
Map-Based Hydrology and Hydraulics
SKILL ASSESSMENT OF SOFTWARE TESTERS Case Study
IS442 Information Systems Engineering
2 Selecting a Healthcare Information System.
INSTALL EPSON PRINTER DRIVER EFFICIENTLY ON YOUR PC BY CONNECTING WITH PREMIUM SUPPORT IN NEW YORK.
CLINICAL INFORMATION SYSTEM
CHAPTER 10 METHODOLOGIES FOR CUSTOM SOFTWARE DEVELOPMENT
Presentation transcript:

Our River Forecasting is in Hydraulics Team Members Evaluation of Hydraulic Models July 2007 Office of Hydrologic Development Hydraulics Group

Our River Forecasting is in Hydraulics Why did we do this evaluation?  Model is unstable  Projects now DORMANT  Need troubleshooting techniques. Drop it and support HEC-RAS  More resources should be invested in supporting an operational HEC-RAS  Difficulties due to inadequate documentation and tutorials  Too many glitches  PC version different to AWIPS version  Not enough workshops and those that happened, not effective

Our River Forecasting is in Hydraulics Why Hydraulics Models are here to stay? They are needed to simulate/forecast river water levels under the following conditions: flat terrain tidal influence tidal influence backwater effect dam break scenarios dynamic inundation maps. Hydraulic Models will NOT go away!

Our River Forecasting is in Hydraulics NWS Hydraulic Model Development

Our River Forecasting is in Hydraulics Time to move on ?  Field issues: Development has been limited at NWS officesDevelopment has been limited at NWS offices Training somewhat not effective: Intentions different than reality. More focused on learning how to debug software than how to build a hydraulic model.Training somewhat not effective: Intentions different than reality. More focused on learning how to debug software than how to build a hydraulic model. Result: Expertise at field offices is weak Result: Expertise at field offices is weak

Our River Forecasting is in Hydraulics Evaluation Objective: Review most commonly used hydraulic models and make a recommendation for its use in the field offices in addition to or in place of FLDWAV. Team Members: Representing field offices

Our River Forecasting is in Hydraulics Ed Capone Brian Astifan Mike Shultz John Halquist Thea Minsk Don Laurine Joanne Salerno Janet McCormick OHD Sanja Perica Cecile Aschwanden Reggina Cabrera Lori Schultz Team Members P

Our River Forecasting is in Hydraulics Steps followed: Step 1. Training on the use of different models Step 2. Evaluate complexity or simplicity on setting up each model Step 3. Selection of data sets

Our River Forecasting is in Hydraulics Steps followed: Step 4. Compilation of capabilities and limitations of each model Step 5. Testing models execution Step 6. Submit report with recommendations

Our River Forecasting is in Hydraulics Selection of Hydraulic Models FLDWAV………….…. NWS SOBEK………………. DELFT MIKE-11……………... DHI HEC-RAS……………. COE

Our River Forecasting is in Hydraulics Strategy to select items to test RFC’s Feedback Dam break Operations Inundation Maps Licenses Training 1-D, 2-D,…

Our River Forecasting is in Hydraulics Criteria for Evaluation RFCs Feedback Matrix of Needs MON Developers/Providers Matrix of Capabilities MOC

Our River Forecasting is in HydraulicsFunctionalityRFCMODEL ABRFCABRFCABRFCABRFC APRFCAPRFCAPRFCAPRFC CBRFCCBRFCCBRFCCBRFC CNRFCCNRFCCNRFCCNRFC LMRFCLMRFCLMRFCLMRFC MARFCMARFCMARFCMARFC MBRFCMBRFCMBRFCMBRFC NCRFCNCRFCNCRFCNCRFC NERFCNERFCNERFCNERFC NWRFCNWRFCNWRFCNWRFC OHRFCOHRFCOHRFCOHRFC SERFCSERFCSERFCSERFC WGRFCWGRFCWGRFCWGRFC TOTALTOTALTOTALTOTAL FLDWAVFLDWAVFLDWAVFLDWAV MIKEMIKEMIKEMIKE RASRASRASRAS SOBEKSOBEKSOBEKSOBEK General modeling capabilities River sinuosity √√√√ Multiple rivers √√√√ Braided rivers √√√√ Split flow √√√√ Flow diversions √√√√ Wind effects √√X√ Ice jam buildup/breakup hydraulics X■√X Floodplain mapping $√$$

Our River Forecasting is in Hydraulics MOC F M R S

Our River Forecasting is in Hydraulics Training for team members  To help understand each model  Install the model software for each team member  Work through examples  Establish a relationship with the vendors/providers

Our River Forecasting is in Hydraulics  Tidal Boundaries  Ice Jams  Dam break  Structures o Bridges o Levees o others Selection of Data Sets

Our River Forecasting is in Hydraulics Difficulties encountered Discrepancy in cross-section data. Geometrical data from FLDWAV different than other models Difficulties in converting data sets between models Transformation of data, Manning’s nTransformation of data, Manning’s n Missing structuresMissing structures

Our River Forecasting is in Hydraulics Cross-Section Difference

Our River Forecasting is in Hydraulics HEC-RAS to FLDWAV ?

Our River Forecasting is in Hydraulics FLDWAV to HEC-RAS ?

Our River Forecasting is in Hydraulics Team Member’s Work  Some team members worked on the transformation of data  Frequent conference calls among the team members  Maintained communication with vendors/providers  Availability of testing licenses: 1 year

Our River Forecasting is in Hydraulics Criteria for Evaluation   Documentation   Data Entry / Data Editing   Computational Methods   Model Stability   Troubleshooting   Tabular output   Graphical output

Our River Forecasting is in Hydraulics Final Testing Testing of the models: The team members worked in pairs and one model was assigned to each group, but the evaluation was individual. We tried to select those who had acquired the most experience in the given model. At the end, grades and comments were turned in. OHD did not grade

Our River Forecasting is in Hydraulics Main Graded Topics 1. GENERAL MODEL SETUP AND MANIPULATION a. Ease of use b. Model run c. Input information d. Output information 2. MODELING TRIBUTARIES, JUNCTIONS AND SPLIT FLOW 3. BRIDGES AND CULVERTS 4. GATES, WEIRS AND LATERAL STRUCTURES 5. LEVEES/ LEVEE BREACH 6. DAMS/ DAMBREAK ANALYSIS 7. TIDES 8. ICE JAM 9. FLOODPLAIN MODELING Grading scale 1 to 5: 5- excellent, 1-poor

Our River Forecasting is in Hydraulics

Findings during the evaluation…  All tested models are very powerful, well developed hydraulic models, based on sound hydraulic engineering principles.  All models are capable of analyzing and solving nearly all typical hydraulic modeling applications but there are specific advanced hydraulic applications that cannot be resolved by all models. For example, HEC-RAS cannot model wind effects, SOBEK and FLDWAV cannot model ice jam, etc.  Major differences are in ease of use, quality of graphical user interface, availability of documentation, technical support and cost. Team members evaluated HEC-RAS to be a superior model based on those criteria.  All models have been used by different agencies for real-time forecasting.  In the USA, HEC-RAS is the most widely utilized model. It has been used extensively by private industry, state and federal agencies. It has been adopted by many federal government agencies as their official hydraulic model.

Our River Forecasting is in Hydraulics Support  During the evaluation How fast did the vendors respond?How fast did the vendors respond? How much support was provided?How much support was provided? Was the support available when needed?Was the support available when needed? Was the support provided by a team or an individual?Was the support provided by a team or an individual?  Future Other considerations….

Our River Forecasting is in Hydraulics Availability of Training This was geared towards the future, once the model would be recommended and implemented o How often would training be available? o How much would it cost? o Where could it happen?

Our River Forecasting is in Hydraulics Interface  Does it have a Graphical User Interface?  Is it user friendly?

Our River Forecasting is in Hydraulics Cost of software? Cost of software?

Our River Forecasting is in Hydraulics Recommendation #1 The team recommends that the AWIPS version of FLDWAV continues to be available to NWS hydrologists at the River Forecast Centers and that it should be included into the new operational architecture.

Our River Forecasting is in Hydraulics Recommendation #2 It is the consensus of the evaluation team that HEC-RAS be considered for inclusion into the suite of NWS hydraulic models.

Our River Forecasting is in Hydraulics Recommendation #3 The team recommends performing a test focusing on comparing development of FLDWAV and HEC-RAS models using identical data sets, assessing difficulties in converting data sets from one program to another and differences in results.

Our River Forecasting is in Hydraulics Recommendation #4 Critical modeling functionalities not available in either HEC-RAS or FLDWAV models should be documented and resolved.

Our River Forecasting is in Hydraulics Report: Finished and now what?

Our River Forecasting is in Hydraulics What is OHD doing?  Working toward the transition: Comparison between models to assess the transition...

Our River Forecasting is in Hydraulics Recommendation for the RFCs  Need to get ready… RFCs need staff prepared to handle hydraulics Should training be in FLDWAV or HEC-RAS or both? Should training be in FLDWAV or HEC-RAS or both? Should we continue developing with FLDWAV? Should we continue developing with FLDWAV? Will FLDWAV be supported? Will FLDWAV be supported?

Our River Forecasting is in Hydraulics