Update on DHCAL and RPC progress Lei Xia ANL - HEP.

Slides:



Advertisements
Similar presentations
LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
Advertisements

Development of high rate RPCs Lei Xia Argonne National Laboratory.
Status of DHCAL Slice Test Data Analysis Lei Xia ANL-HEP All results preliminary.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
First analysis of DHCAL Data José Repond Argonne National Laboratory Linear Collider Workshop LCWS 2012 October 22 – 26, 2012 University of Texas at Arlington,
HCAL with Resistive Plate Chambers José Repond Argonne National Laboratory Presented at the Chicago Linear Collider Workshop January 7-9, 2002.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Simulation of the DHCAL Prototype Lei Xia Argonne National Laboratory American Linear Collider Workshop: Ithaca, NY, July , 2003 Fe absorber Glass.
José Repond Argonne National Laboratory Review of the Status of the RPC-DHCAL SiD Workshop SLAC, Stanford, California October 14 – 16, 2013.
Simulation of RPC avalanche signal for a Digital Hadron Calorimeter (DHCAL) Lei Xia ANL - HEP.
Update on Ongoing Tungsten Digital HCAL Beam Tests Erik van der Kraaij CERN LCD.
The Progress of PHENIX RPC Production in China Shouyang HU Xiaomei LI Shouyang HU Xiaomei LI Science and Technology on Nuclear Data Laboratory China Institute.
15 th CBM collaboration meeting, GSI, Darmstadt, Germany, April 12-16, 2010Wang Yi, Tsinghua University R&D status of low resistive glass and high rate.
Optimizing DHCAL single particle energy resolution Lei Xia Argonne National Laboratory 1 LCWS 2013, Tokyo, Japan November , 2013.
DBD HCAL section report and RPC DHCAL progress Lei Xia ANL - HEP.
Optimizing DHCAL single particle energy resolution Lei Xia 1 CALICE Meeting LAPP, Annecy, France September 9 – 11, 2013.
Towards an RPC-based HCAL Design Stephen R. Magill Argonne National Laboratory Digital HCAL for an E-Flow Calorimeter Use of RPCs for DHCAL RPC Design.
DHCAL - Resolution (S)DHCAL Meeting January 15, 2014 Lyon, France Burak Bilki, José Repond and Lei Xia Argonne National Laboratory.
José Repond Argonne National Laboratory Status of the DHCAL Project SiD Collaboration Week January 12 – 14, 2015 SLAC.
Digital Hadron Calorimeter (DHCAL) José Repond Argonne National Laboratory CLIC Workshop 2013 January 28 – February 1, 2013 CERN, Geneva, Switzerland.
RPC Development in Beijing and Potential for NO A Tianchi Zhao University of Washington May 16, 2005.
Recent DHCAL Developments José Repond and Lei Xia Argonne National Laboratory Linear Collider Workshop 2013 University of Tokyo November 11 – 15, 2013.
1 Aging Study for SiD Hcal and Muon System RPCs (University Linear Collider Detector R&D, project 6.19) Changgo Lu, W. Sands, K. T. McDonald, A.J.S. Smith.
Tests of a Digital Hadron Calorimeter José Repond Argonne National Laboratory CALICE Collaboration Meeting March 10 – 12, 2010 University of Texas at Arlington.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
Resistive ….. I.Laktineh IPN-Lyon. Motivation Calorimeters are expected to play an important role in future experiments (ILC, CLIC…) based on PFA concepts.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
CALICE Digital Hadron Calorimeter: Calibration and Response to Pions and Positrons International Workshop on Future Linear Colliders LCWS 2013 November.
Development of a Particle Flow Algorithms (PFA) at Argonne Presented by Lei Xia ANL - HEP.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
The DHCAL Data Analysis José Repond CALICE Meeting, Prague, September 10 – 12, 2007.
W-DHCAL Analysis Overview José Repond Argonne National Laboratory.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
1 Update on Silicon Pixel Readout for a TPC at NIKHEF LCWS08 - Chicago 19 Nov 2008 Jan Timmermans NIKHEF.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Min-DHCAL: Measurements with Pions Benjamin Freund and José Repond Argonne National Laboratory CALICE Collaboration Meeting Max-Planck-Institute, Munich.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
A Hadron Calorimeter with Resistive Plate Chambers José Repond Argonne National Laboratory CALOR 2006, Chicago, June 5 – 9, 2006.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
1 Analysis of Small RPC DHCAL Prototype Data (noise and cosmic ray) LCWA09, Albuquerque, New Mexico Friday, October 02, 2009 Qingmin Zhang HEP Division,
Future R&D of the RPC based Digital Hadron Calorimeter (DHCAL) Lei Xia ANL_HEP.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Development of a Single Ion Detector for Radiation Track Structure Studies F. Vasi, M. Casiraghi, R. Schulte, V. Bashkirov.
Future DHCAL Activities José Repond Argonne National Laboratory CALICE Meeting, CERN, May 19 – 21, 2011.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
1 Micromegas for sampling calorimetry Chronology & people  Initiated by LAPP LC-group in 2006 (C. Adloff, M. Chefdeville, Y. Karyotakis, I. Koletsou)
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Results achieved so far to improve the RPC rate capability
CEPC 数字强子量能器读出电子学预研进展
A proposal to equip the high eta muon stations with High Rate GRPC
Recent DHCAL Developments
Update on Noise Analysis of the DHCal Test Beam at Fermilab
SiD Calorimeter R&D Collaboration
(My personal) CALICE Report
The DHCAL: an overview José Repond Argonne National Laboratory
State-of-the-art in Hadronic Calorimetry for the Lepton Collider
Tests of a Digital Hadron Calorimeter
Tests of a Digital Hadron Calorimeter
Steve Magill Steve Kuhlmann ANL/SLAC Motivation
Presentation transcript:

Update on DHCAL and RPC progress Lei Xia ANL - HEP

Outline  Summary DHCAL test beam activities  Progress on test beam data analysis  RPC R&D progress SiD workshop 2

DHCAL test beam has finished!  Last DHCAL test beam period at CERN with W absorber finished in Nov –Got more hadron data at high momenta, and did another muon run –Tried high-gain mode of the DCAL chip, and measured change in rate capability –Experienced a sudden gas gain change – understood why SiD workshop 3 DHCAL Data Summary 1 Contains a significant fraction of ‘calibration events’ 2 Contains no ‘calibration events’ 3 Numbers in millions

DHCAL prototype has been shipped back to ANL  What should we do next (with the prototype)? –Have a few ideas, but suggestions are very welcome SiD workshop 4

Data analysis  Results from the first look of the data exist (and were reported at conferences)  Analysis towards final publications is on-going –ANL team is analyzing the data from Fermilab test beam –ANL and CERN group will work together on CERN test beam data, with CERN playing a major role –We made a lot of progress, but things are not easy Calibration is significantly more complicated than we anticipated Shortage of manpower is slowing us down SiD workshop 5 Muon response/simulation DHCal response/resolution at PS (1 – 10 GeV) Some preliminary results from CERN data

More preliminary results from CERN data SiD workshop 6 Response at the SPS (12 – 300 GeV)Comparison with Simulation – SPS energies (data: not calibrated; simulation: rescaled)

Data analysis: calibration  DHCAL calibration was though to be simple and painless –Control parameters: RPC efficiency (ε), multiplicity (μ) –DHCAL response, to first order, should scale with ‘calibration factor’ = ε x μ –In deed, this calibration scheme works to first order, more or less  To go further, things become complicated –Due to the fact that some pads were hit by more than one particle, these hits scale differently from the others –Number of particles hitting a pad can be approximated by local hit density, which changes with energy and type of showering particle –As a result, calibration may have hit density, energy, particle type dependences –Simulation samples were generated at different signal charge thresholds, in order to study the calibration scheme SiD workshop 7 Average number of hits as a function of readout threshold: scaling is energy dependent (muon, pion and positron at several energies, all normalized to the number of hits at threshold = 400)

Data analysis: calibration  Current calibration studies –Data driven method ‘Full calibration’ using ‘calibration factor’ = ε x μ Try to ‘reduce’ the full calibration and find new calibration functions based on local hit density – MC sample driven method Using MC sample to study the migration of hits in density bins as a function of threshold Bin by bin calibration function for each density bin, using ε and μ as parameters  Both methods make a lot of progress  hope to solve the problem soon SiD workshop 8 Scaling of number of hits as a function of readout threshold: particle type dependence (muon, positron, pion: all response are scaled to their own response at threshold of 400)

RPC R&D progress  R&D on improving RPC rate capability  Progress on 1-glass RPC SiD workshop 9

RPC rate capability  Particle flux through RPC  Signals  Current through detector, in particular through resistive electrode (glass/Bakelite)  Voltage drop on resistive electrode  Reduced voltage on gas volume  Lower gas gain, lower efficiency  limiting factor for rate capability  For stable particle flux, after transient, the voltage on gas volume u 1f is:  Ways to improve RPC rate capability –ρ↓: lower resistivity electrode material –d 2 ↓: reduce thickness of electrode –c ↓: operate with lower gas gain, together with more sensitive readout SiD workshop 10 High voltage applied on RPC Threshold voltage for signal to appear Particle flux rate Bulk resistivity of electrode material Thickness of resistive electrode

Low resistivity material  Electrode material currently available:  Various R&D groups are exploring ways to produce low resistivity electrodes –Partially successful, but production cost very high SiD workshop 11 Ceramic electrode Semi-conductive glass electrode CMB: the Compressed Baryonic Matter experiment at FAIR

Finding new electrode material: glass  Argonne, U. Iowa has engaged Coe College [expert in glass research] to develop affordable low resistivity glass  Lab samples achieved resistivity in very large range:  Small size glass pieces delivered several weeks ago. Currently trying to make RPC with them. SiD workshop 12

Finding new electrode material: Bakelite  USTC (University of Science and Technology of China) engaged Chinese Bakelite manufacturer to work on R&D of low resistivity Bakelite material  First batch of boards delivered –Bulk resistivity 10 8 – Ω∙cm –Visual inspection suggests good quality  ANL agreed to evaluate the new boards. We are trying to build RPCs with this batch of Bakelite boards SiD workshop 13 编号厚度 /mm 电阻率 /Ωcm 室温 / ℃湿度 /% E E E E E E E E E E E E E E E E E E

Other approaches  Reducing the ‘effective’ electrode thickness –Practical electrode thickness is limited by mechanical strength: ~ 1 – 2 mm –However, one can try to embed the resistive coating into the electrode  reduce effective thickness that limits the rate capability –Bakelite boards are built layer by layer  perfect candidate to try this idea –USTC + Chinese Bakelite producer delivered the 1 st batch of samples recently –Again, ANL will evaluate the new boards  Using more sensitive readout –Running RPC with smallest possible signal  smaller signal current  smaller voltage drop on electrodes –Idea and test results reported in recent RPC conference* –Recent DHCAL test beam verified the idea with two different gain settings SiD workshop 14 Embedded graphite layer Electrode Resistive paint * R. Santonico, Keynote talk at RPC 2012

1-glass RPC development  1-glass design has many advantages for DHCAL, and as a new type of RPC –~1mm thinner than normal 1-gap RPC  significant cost saving for magnet –Can significantly simplify DHCAL calibration –Avoids several production difficulties: gap size control, resistive coating, coating uniformity –Potential better tracking resolution  Finally, got to build 2 large (32x48 cm 2 ) 1-glass RPC prototypes –Built with DHCAL prototype FEB’s –1 RPC leaks, but can be avoided –Has been running (more or less) continuously for ~2 months –Test results looks good SiD workshop 15 HV Readout pads EfficiencyHit multiplicity

Summary  DHCAL test beam has been successfully finished  Data analysis is the current focus –First look of the data is pretty good –Calibration of DHCAL is taking shape –Hope to have final results soon  More RPC R&D is on-going –Improve RPC rate capability –1-glass RPC –Will have some results in the near future SiD workshop 16