NSTX Upgrade Project – Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.

Slides:



Advertisements
Similar presentations
Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Advertisements

NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
Langmuir Probe Peer Review Josh Kallman for the LLD Team February 13, 2009 NSTX Supported by College W&M Colorado Sch Mines Columbia U Comp-X General Atomics.
Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman Final XP Review June 5, 2009 NSTX Supported by.
Operations Notes Updates Since Last Team Meeting Stefan Gerhardt NSTX Team Meeting B318 January 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX Team Meeting June 25, 2010 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Machine Installation and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
NSTX-U Diagnostic Installations S.P. Gerhardt, B. Stratton, R. Kaita With help from A. von Halle, E. Perry, F. Jones NSTX-U Supported by Culham Sci Ctr.
PCS Navigation D. Mueller January 26-28, 2010 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Supported by Office of Science Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U.
College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics New York U Old Dominion U ORNL.
Radiative divertor with impurity seeding in NSTX V. A. Soukhanovskii (LLNL) Acknowledgements: NSTX Team NSTX Results Review Princeton, NJ Wednesday, 1.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX Effects of NTSX Upgrades on DiagnosticsFebruary 8, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Second Switching Power Amplifier (SPA) Upgrade Physics Considerations Discussion S.A. Sabbagh 1, and the NSTX Research Team 1 Department of Applied Physics,
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
1 R Raman, B.A. Nelson, D. Mueller 1, T.R. Jarboe, M.G. Bell 1, J. Menard 1, R. Maqueda 2 et al. University of Washington, Seattle 1 Princeton Plasma Physics.
Xp705: Multimode ion transport: TAE avalanches E D Fredrickson, N A Crocker, N N Gorelenkov, W W Heidbrink, S Kubota, F M Levinton, H Yuh, R E Bell NSTX.
NSTX-U Construction Erik Perry Princeton Plasma Physics Laboratory NSTX Upgrade Readiness to Operate Review LSB B318 December 9-11, 2014 NSTX-U Supported.
Development of Improved Vertical Position Control S.P. Gerhardt, E. Kolemen ASC Session, NSTX 2011/12 Research Forum Location Date NSTX Supported by College.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle NSTX Run Usage 27 February – 5 May, 2006 NSTX Mid-Run Assessment PPPL, Princeton,
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Energy Confinement Scaling in the Low Aspect Ratio National Spherical Torus Experiment (NSTX) S. M. Kaye, M.G. Bell, R.E. Bell, E.D. Fredrickson, B.P.
Some Halo Current Measurements in 2009 S.P. Gerhardt Thanks to: E. Fredrickson, H. Takahashi, L. Guttadora NSTX Results Review, 2009 NSTX Supported by.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman XP Review - ASC Feb 2, 2009 NSTX Supported by College.
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX Team Meeting May 5, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
Effect of 3-D fields on edge power/particle fluxes between and during ELMs (XP1026) A. Loarte, J-W. Ahn, J. M. Canik, R. Maingi, and J.-K. Park and the.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
NSTX NSTX TF, PF and umbrella Upgrade Internal ReviewFeb 24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX NSTX LidsJuly 6, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX Team Meeting December 4, 2008 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Supported by Office of Science NSTX S.M. Kaye, PPPL ITPA PPPL 5-7 Oct Confinement and Transport in NSTX: Lithiumized vs non-Lithiumized Plasmas Culham.
Planning for Toroidal Lithium Divertor Target for NSTX and Supporting Experiments on CDX-U/LTX R. Kaita Boundary Physics Science Focus Group Meeting July.
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX 2007 MHD XP Review – J. Menard 1 Optimization of RFA detection algorithms during dynamic error field correction Presented by: J.E. Menard, PPPL Final.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
XP-945: ELM Pacing via Vertical Position Jogs S.P. Gerhardt, J.M. Canik, D. Gates, R. Goldston, R. Hawryluk, R. Maingi, J. Menard, S. Sabbagh, A. Sontag.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
Implementation of a 3D halo neutral model in the TRANSP code and application to projected NSTX-U plasmas S. S. Medley 1, D. Liu 2, M. V. Gorelenkova 1,
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle Update on the NSTX Run Plan PPPL, Princeton, NJ, 15 May, 2006 Supported by Office.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
NSTX Team Meeting April 5, 2006 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
XP-950: XP-950: Dependence of metallic impurity accumulation on I p and the outer gap in the presence of lithium deposition S. Paul, S. P. Gerhardt are.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics New York U Old Dominion U ORNL PPPL PSI Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Washington U Wisconsin Machine Installations and Outage Coordination Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew U Ioffe Inst RRC Kurchatov Inst TRINITI KBSI KAIST POSTECH ASIPP ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep U Quebec Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Final Design Review LSB B318 June 22-24, 2011

NSTX Upgrade Project – Final Design Review June , 2011 NSTX Upgrade Outage As we shift from engineering the NSTX Upgrades to the installation of the hardware, we need to plan the installations in such a way that success is assured A plan has been developed for performing the NSTX Upgrade Outage –Based on experience from similar outages since 1984 A system for coordinating and controlling the outage tasks has been identified –Based on the very successful Work Control Center that was used during the TFTR D&D Project 2

NSTX Upgrade Project – Final Design Review June , 2011 Outage Planning Outage planning based on bottoms-up estimates from Engineering –Assumes one shift, 5 days per week for almost all work Assign technicians, by name, to scope to assure staffing requirements are met –Identify early where temporary staff additions are needed 6 Electricians (from existing BOA), 1 welder, 4 safety watch technicians Adjust start date of tasks to assure one task at a time in each area Accelerate tasks that make other tasks more efficient Work toward peeling back cabling and fiber optics, rather than removing them when access is needed to perform tasks 3

NSTX Upgrade Project – Final Design Review June , 2011 Outage Planning cont Work in the Bays J, K and L most congested –Neutral beam installation, including cutting large hole in vessel –Coil supports and umbrella modifications for center stack –Diagnostic relocations, including cutting large hole in vessel Work crews on opposite sides of the vacuum vessel Assume moving NB box into test cell will impact other activities until box can be sealed Pre-plan temporary storage areas –Minimize material handling whenever possible Daily / hourly coordination of all field work is critical 4

NSTX Upgrade Project – Final Design Review June , 2011 Outage Coordination Use of a Work Control Center ( like TFTR D&D Project ) Work Control Center reviews all Engineering Work Packages for the field –Reviews Job Hazard Analysis (JHA) –Assures pre-requisites are done –Arranges for permits –Assigns work to field crews once package is ready –Runs pre-job and post-job briefs –Interfaces between Engineering and the field crews –Assures that the field work is done safely and correctly –Assures that the field crews are used efficiently –Coordinates storage and lay-down areas as well as crane use Daily Plan-of-the-Day meetings to coordinate activities between crews and fine tune technician assignments 5

NSTX Upgrade Project – Final Design Review June , 2011 NSTX-U Work Control Center 6

NSTX Upgrade Project – Final Design Review June , 2011 Work Control Center Flow Chart 7

NSTX Upgrade Project – Final Design Review June , 2011 NSTX-U Outage Plan Schedule 8

NSTX Upgrade Project – Final Design Review June , 2011 NSTX-U Outage Plan Schedule cont 9

NSTX Upgrade Project – Final Design Review June , 2011 NSTX Test Cell 10

NSTX Upgrade Project – Final Design Review June , 2011 Outage Plan - Start of the Outage Establish construction power Disconnect all power to NSTX Test Cell (NTC) except lighting and construction power Vent vacuum vessel and ventilate to the outside –No vessel entry at this time 11

NSTX Upgrade Project – Final Design Review June , 2011 First Month Remove cable tray at top of machine –Improves crane access for heavier diagnostics Remove RF piping within 10’ of vacuum vessel –Permits access to east side of machine Install new 118’ EL platform on west side –Permits moving racks to new location, not just temporary storage Start rack removals to make room for NB2 12

NSTX Upgrade Project – Final Design Review June , 2011 Months Continue removing racks to make room for NB2 Remove diagnostics from Bays J, K and L –Most congested work area for outage Coil up cables, tubing and fibers from Bays J, K and L –Do not remove cables etc – too costly and time consuming to replace 13

NSTX Upgrade Project – Final Design Review June , 2011 Months Finish removing racks to make room for NB2 Remove diagnostics from Bays D, E, and F –Opposite side from Bays J, K and L –Coil up cables, tubing and fibers Remove diagnostics from Bays A, B, and C –Coil up cables, tubing and fibers Perform modifications to umbrella at Bays J, K and L –First modifications in primary work area Start modifications to umbrella at Bays D, E and F Start removing diagnostics to make room for NB2 –Diagnostics on platform away from vacuum vessel Start coil support mods in Bays J, K, and L Clean/sand tiles in-vessel to remove lithium 14

NSTX Upgrade Project – Final Design Review June , 2011 Months Coil support mods in Bays J, K, and L Remove diagnostics from Bays A, B, C, G, H and I –Coil up cables, tubing and fibers Finish modifications to umbrella at Bays D, E and F, then start coil support mods there Remove Bay L pump duct Remove NW section of 109’ EL platform Finish removing diagnostics to make room for NB2 Remove passive plates, then trial fit and trim new passive plates and tiles Remove old centerstack 15

NSTX Upgrade Project – Final Design Review June , 2011 Months Finish coil support mods in Bays D, E and F Perform modifications to umbrella at Bays A, B and C Vacuum vessel penetration cutting for NB2 at Bays J and K –Reinforce area prior to cutting –Protect surrounding areas –Significant crane usage Weld in “bay window” at Bays J and K –Protect surrounding areas –Significant crane usage 16

NSTX Upgrade Project – Final Design Review June , 2011 Months Perform modifications to umbrella at Bays G, H and I Start coil support mods in Bays A, B, and C Vacuum vessel penetration cutting for diagnostics at Bay L –Protect surrounding areas –Significant crane usage Weld in nozzle for Bay L port –Protect surrounding areas –Significant crane usage 17

NSTX Upgrade Project – Final Design Review June , 2011 Months Finish coil support mods in Bays A, B and C Move NB2 into NSTX test cell and seal enclosure –Protect surrounding areas –Significant crane usage Begin connections of services to NB2 Replace items in Bays D, E and F Final installation of new passive plates and tiles 18

NSTX Upgrade Project – Final Design Review June , 2011 Months Coil support mods in Bays G, H and I Begin re-installation of items removed for NB2 installation Replace items in Bays A, B and C Continue NB2 installation 19

NSTX Upgrade Project – Final Design Review June , 2011 Months Continue re-installation of items removed for NB2 installation Replace items in Bays G, H and I Continue NB2 installation Replace RF piping 20

NSTX Upgrade Project – Final Design Review June , 2011 Months Install new center stack Continue re-installation of items removed for NB2 installation Replace items in Bays J, K and L Continue NB2 installation 21

NSTX Upgrade Project – Final Design Review June , 2011 Month 27 Finish re-installation of items removed for NB2 installation Finish NB2 installation Re-establish power in test cell Clean, photo, close and pump down vacuum vessel 22

NSTX Upgrade Project – Final Design Review June , 2011 Summary The NSTX Upgrade Outage has been planned based on –Bottoms-up estimates from Engineering –Identifying staff to perform the work –Scheduling work to avoid conflicts The plan is being worked –To reduce work required to remove/reinstall to gain access to areas –To improve efficiencies –Plan available to accelerate overall schedule by two months Coordination and Control –Provided by the Work Control Center –At the Plan-of-the-Day meeting –Continuously by the Field Supervisors Ready to successfully perform the outage 23

NSTX Upgrade Project – Final Design Review June , 2011 NSTX Upgrade Outage Successfully Completed 24