FACET Exp Area Christine Clarke 3 rd October 2013.

Slides:



Advertisements
Similar presentations
1 Vacuum Pressure Calculations. 2 Vaccalc The program vaccalc was used for all calculations. The program required three pieces of information for each.
Advertisements

STEAM TRAPS.
Palestine TV Test Jason Link University of Hawaii ANITA Collaboration Meeting at UCI 4/7/05 – 4/9/05.
Hargrave Street Pumpstation – Site Preparation July 2014.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
TJR Sept 22, 2004MICE Beamline Analysis -- SEPT041 MICE Beamline Analysis – SEPT04 Tom Roberts Muons, Inc. September 22, 2004.
1. Pump down the chamber from the atmosphere pressure 2. Using RHEED to obtain diffraction images 3. Open the RHEED chamber or venting from high vacuum.
A. Bross MTA RF WS August 22, Welcome MTA RF Workshop.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
1 ATF2 - IP Chamber Design and manufacturing of Chamber with high precision piezo actuators for high resolution BPMs Status / progress report – 26 June.
10 October 2003S. DeBarger PEP-II Vacuum Failures PEP-II Machine Advisory Committee.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
FACET II Project – User Area Christine Clarke 26 th June 2015.
VACCALC: A Program to find Beam pipe Pressure Profiles M. Sullivan Nov. 3, 2011 JLAB, CASA, MEIC.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
Beam Transport AIP Beam Transport to Delivery Ring Instrumentation and Controls Update Brian Drendel December 15, 2014.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
20to2T5m100cm Images Van Graves February 13, 2014.
SAXS/WAXS Conversion for Beamline Engineering Review.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Wakefield Calculations for the ATF2 Beamline A. Lyapin, Wakefield Calculations for the ATF2 Beamline 1 S. Boogert, J. Snuverink (JAI/RHUL, UK)
FACET Update ARD Status Meeting Christine Clarke April 14 th 2011.
23 rd WP8 Bi-weekly meeting Lukasz Krzempek (TE-VSC-DLM) TAS-Q1 – vacuum equipment design.
E-217 FACET users meeting 9/15/14 Ken Marsh. What happens to the experiment when laser fires full power in Lithium? Do we ionize the helium buffer zones?
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
E. Richards EE Chamber installation. Summary Position Of the EE chambers General view of EEL chambers EEL5 chamber Installation of other chambers ex.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator.
Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?
Modifications to FACET Laser Transport in IP Area for Run Main features: Sampled low-intensity beam with independent compressor for diagnostics,
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Vacuum Pumps. Vacuum Pump Safety Physical and Chemical Hazards – Always vent pump exhaust – Keep pump away from flammable.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Safety Interlocks Group Front End Equipment Protection System Currently there are 55 FEEPS Systems in Service –This consists of: 43 Version 1 system 4.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Design Update Puck and Gun Magnet February 16, 2016.
Summary of the AWAKE Technical Board Meetings Edda Gschwendtner.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes.
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
There is a decrease in ionisation energy as you go down the group. Beryllium to Magnesium.
Introduction Six-Month Follow-Up on Action Items of Feb 2016 CEBAF Field Emitter Workshop Rongli Geng September 12, 2016.
Preliminary Y-chamber specifications – First draft
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Operational Experience - Field Emission
Jason Link University of Hawaii
XFEL Beam Physics 10/30/2015 Tor Raubenheimer.
Stainless Steel Water Well Casing.
The Building Blocks of Matter: Atoms
Ingersoll Rand EXP-Valve Animation with Simul-Shift & Quick Dumps
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Hall C Dump Status Beam Resuscitation Review
Two-beam Test-stand Design and Construction Status
Presentation transcript:

FACET Exp Area Christine Clarke 3 rd October 2013

Notable changes: Ion pump now in IP1 area to maintain vacuum when valve 3160 is closed E-202 chamber removed – space now exists for EOS chamber for laser-e-beam timing Space/support made for long oven design due to be installed this run Lost wirescanner 4  2 BPMs installed in the IP Area (controls information to follow) No Stainless Steel 50um window – only windows in beamline are 75um and 50um beryllium

7:30am 30 th September… what lies at the end of the rainbow?

IP1 table upstream end. No changes until after wirescanner. Be window moved upstream. E202 chamber removed. Space created for EOS chamber. BPM installed.

Downstream end of IP1 table. Oven table mover is now extended by 1 m…

… creating space for the new 140 cm lithium oven currently being built in UCLA. There is also a BPM installed in the bypass line.

Elements after the oven moved slightly downstream and some nipples/spool pieces were removed.

Unfortunately particularly cramped downstream and it was necessary to remove the fourth wirescanner from the IP Area. The stainless steel vacuum tight window was also removed and a valve installed to enable us to continue to vent this area and pump down again quickly.