Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 1 TRANSBOUNDARY EFFECTS Gijs van Luyn InfoMil.

Slides:



Advertisements
Similar presentations
Environmental Protection Agency Montenegro. Competent Authority Since November 2006, The competent authority for environmental issues was the Ministry.
Advertisements

Regional Workshop Warsaw, January 2006 STATE UNION OF SERBIA AND MONTENEGRO Basel Protocol on Liability and Compensation Questionnaire No. 2 Ratification.
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
HR 09 IB EN 02 – German Proposal, Zagreb, 10 June 2011 Page 1 April 12, Strengthening the Ministry of Nature Protection of the Republic of Armenia.
BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
SERBIA AND MONTENEGRO Tanja Popovicki Department for International Co-operation Ministry for the Protection of Natural Resources and Environment of the.
Making Aarhus work in international forums A workshop on promoting the application of the principles of the Aarhus Convention in international forums Geneva,
Aviation Regulations Department Belgrade, 12 July 2010.
Local Self Government in environmental management Jadranka Ivanova Head of EU Department Ministry of Environment.
Food Safety Systems in some Member States of the European Union Dieter Arnold Berlin Dieter Arnold
Non-governmental Actors in the Compliance with and Monitoring of Multilateral Environmental Decisions.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Standards experts. Accreditation solutions. Andrea Spencer Coordinator, WTO/NAFTA Enquiry Point (Canada) TBT Special Meeting on Procedures for Information.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Analysis of minimal criteria for environmental inspection.
1 LINKING THE WATER FRAMEWORK DIRECTIVE AND IPPC DIRECTIVE Main achievements Session 8 - Nature and water Malta, 03/10/2013.
Implementing the Second Pillar of the Aarhus Convention: Problems Identified in the National Implementation Reports Magda Tóth Nagy, Senior Expert Geneva,
Current state on Harmonisation and Implementation/Enforcement of Environmental Legislation - Industrial Pollution Control in SLOVENIA Barbara Bernard Ministry.
The Aarhus & Espoo Conventions Making implementation work for stakeholders.
Report on the current legal structure and resources available to the environmental protection agencies and inspectorates in Croatia 1st BERCEN Exchange.
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
APPLICATION OF EU SUSTAINABLE DEVELOPMENT RULES Axel Luttenberger.
Third BERCEN Plenary Meeting December 16-17, 2004 Brussels, Belgium Key Achievements in Environmental Enforcement and Compliance in the Republic of Montenegro.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
IPPC transposition and experience with its implementation in the Czech Republic ?? …!! AjPíPíSí ??
4 th Exchange Programme Cluj Napoca, October, 2005 REPUBLIC OF CROATIA Updates in the Transposition and Implementation of IPPC directive Updates.
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
Energy Efficiency in IPPC Installations, Wienna Oct/2004 Petr Honskus (SPF Group) Chairman of EE TWG CR Vladimíra Henelová, Monika Přibylová Members.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
The conception of Information System on Integrated Pollution Prevention and Control (IS IPPC) Ing. Blanka Kapustová, PhD. Slovak Environmental Agency Centre.
CONTROL Environmental protection act Boyko Malinov Ministry of environment and water Bulgaria.
Implementing legislation for Integrated Permitting Monika Pribylova 1 October 2013 года Air Quality Governance in the ENPI East Countries.
P1 The implementation of virtual water within the European water policy : the basics for a legal and political analysis Teresa Elola Calderón Research.
Environmental Impact Assessment in the Slovak republic.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
The legal background for implementing the IPPC, EPER, and PRTR Protocol Requirements Orsolya Adamovics Department for Conservation of Environment Ministry.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
The European SEA Directive Simon Marsden School of International Business, University of South Australia Module 1: Basics of SEA.
SEA in the Czech Republic Prague, 24 September 2008.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 EMS as part of Integrated permitting and inspections Rob.
Consultant: CMDC Joint Venture Transboundary effects.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 MONITORING Mr. Jan Prášek IPPC Agency.
Biosafety Clearing House Training Workshop date place.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 1 DEFINING THE BOUNDARY OF AN INSTALLATION Gijs van Luyn.
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Consultant: CMDC Joint Venture Czech experience - Use of BREFs and national BAT notes, role of IPPC Agency, Czech TWG Multi-Country Workshop June 8th,
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
1 Quality Indicators of Regulatory Management Systems Stéphane Jacobzone, Chang Won Choi, Claire Miguet The views are the author’s responsibility OECD.
Peter Lukáč Ministry of Environment of the Slovak Republic Department of Environmental Assessment.
Albania - Identification and notification of the public concerned in Decision Making : Best practices and Challenges Aarhus Convention Task Force on Public.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 FEEDBACK ON DEVELOPMENTS Rob Bakx InfoMil Resident Twinning.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 InfoMIL Rob Bakx InfoMil – Twinning Advisor.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
Better Regulation – practices
THE NEC DIRECTIVE Gijs van Luyn InfoMil.
INTEGRATED PERMITTING PROCEDURE IN THE CZECH REPUBLIC
INTEGRATED PERMITTING IPPC DIRECTIVE: BEST PRACTICE
Overview of public participation in strategic decision-making in the UNECE area David Aspinwall.
BACKROUND Author and editor: Sarka Havrankova
INTRODUCTION TO Compliance audit METHODOLGY and CAM
Towards Modern Environmental Impact Assessment (EIA) in Uzbekistan
Nick Bonvoisin Secretary to the Convention on the
Clean Air Act The Clean Air Act was first passed in 1963
Presentation transcript:

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 1 TRANSBOUNDARY EFFECTS Gijs van Luyn InfoMil

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 2 The relevant articles in the IPPC Directive do not intend to regulate global and trans-European environmental effects such as global warming and acidification. Only environmental effects which have a regional impact, like air quality and surface water pollution can be considered to be transboundary effects in the sense of the IPPC Directive. Transboundary effects are regional effects

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 3 The relevant legislation article 17 of the IPPC-Directive article 7 of the EIA-Directive If significant transboundary effects are to be expected, the relevant authority has to inform the neighbouring country of the planned activity and to give the public of that country the right to voice its opinion on this activity.

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 4 Within the Czech IPPC framework assessing if a certain activity has transboundary effects is important due to the division of competence between regional and national authorities. Assessment of transboundary effects should take place at a regional level since the regional competent authorities have to make an assessment of the environmental effects of a certain activity anyway. Competence of the authorities

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 5 If there are transboundary effects, the application is referred to the Ministry of Environment, IPPC Department as this is the competent body. MoE will arrange with the Ministry of Foreign Affairs for contacts to be made with the affected Member State(s). The MoE will ensure that the regional authority is consulted and kept informed of progress with the application at all stages during its determination. Czech procedure

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 6 Communication between States The communication between the Czech Republic and its neighbouring countries should take place as early as possible in the process described above It is preferable to have discussions on an informal level before the official notification to the neighbouring country of transboundary environmental effects is given.

When are environmental effects transboundary effects? Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 IPPC directive, article 17 (1): “significant negative effects on the environment of another Member State”.

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 8 A decision has to be made how big an increase of air or water pollution is considered significant enough to be regarded as “significant negative effects”. A practical solution is that an emission can be considered insignificant if it contributes less than a certain percentage of an EU environmental quality standard (or some other standard derived from another data set) to the general average environmental quality. “Significant negative effects”

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 9 Methodology for determining the presence of transboundary effects A good assessment of the possible environmental effects is required. A methodology for assessing transboundary effects should consist of the use of dispersion models as a test of environmental significance. Based on the data gathered from the assessment, the question whether the activity has transboundary effects can be answered quite easily.

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 10 Dispersion models Dispersion of pollutants in surface water and noise can be quite easily calculated. The calculation of dispersion of pollutants into the air is a different matter. In recent years several high-quality dispersion models of air pollution have been developed which could be used within the Czech Republic by the operators and state authorities.

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 11 How to deal with multiple polluters When multiple polluters cause certain effects it is of utmost importance to assess which percentage of the existing pollution is caused by which polluter. This assessment in itself is a basic condition of good environmental permitting. A proper assessment of the emissions from a certain activity is vital for writing a permit.

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 12 Permit writers are advised to : (a)ensure that the operator has provided the right data on emissions to all environmental media (b) check the dispersion model calculations to verify that they are accurate (c) apply a test of environmental significance (d) if transboundary effects are present

Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Page 13 Any Questions?