Mobility Workshop Griffith University Case Study Bruce Callow Director – Information and Communication Technology Services ICTS November 2011.

Slides:



Advertisements
Similar presentations
IEEE Mentoring Program Pilot Membership Development Retreat 1 May 2005 Cathy Downer, IEEE RAB Membership Development
Advertisements

Office of Technical Services Tracking & Reviewing Research Space Usage Tony Woods Deputy Director, OTS.
SIP Trunking Academy Patrick Herron – VP Product Management.
1 GROUP-8. 2 PPT downloaded from
International Federation of Accountants International Education Standards for Professional Accountants Mark Allison, Executive Director Institute of Chartered.
Global Business Blueprint Summary Presenters: Laurie Dempsey, CBP Lois McCluskey, eCP January 28, 2004.
Enterprise Customer Engineering Strategic Relations and Solutions Lync/Skype Product Engineering Pre-release product validation Skype Experience Engine.
© Rightscom 2005 – All rights reserved Disciplinary differences: some findings and conclusions Presentation to the Research Communications Forum Sue Sparks.
Introduction to MY-SCHOOL. Pre- Transformation Training By the end of today’s session you should be familiar with: 1.What transformation is and its benefits.
Fòmasyon Itilizatè Ayiti Office 365 Fòmasyon. Why the Change? Partners in Health's new hosted Microsoft Office 365 solution allows users to access their.
0ictQATAR October 13, 2008 Qatar’s ICT Statistical Information Areas Tariq Gulrez.
TC2-Computer Literacy Mr. Sencer February 4, 2010.
CRICOS Provider No 00025B Strategies for enhancing teaching and learning: Reflections from Australia Merrilyn Goos Director Teaching and Educational Development.
Lunch January 2012 Cloud Computing, Communications and Collaboration FORDHAM UNIVERSITY THE JESUIT UNIVERSITY OF NEW YORK.
Virtual Meetings Increasing Collaboration While Reducing Costs and Ensuring Business Continuity Ram Narayanaswamy CTO 8x8, Inc.
Professor Phillip Steele Pro Vice-Chancellor (Campus Coordination) Academic Director (Berwick & Peninsula) ICT Requirements What do campuses.
IT Student Survey 2009 Your name here. Overview Over 1,400 responses were received. Students across all faculties, nationalities and years were represented.
African Librarianship and the Academic Enterprise Prepared By: Kay Raseroka Director: Library Services University of Botswana.
Wireless Solution Training for the (Enterprise) Carpeted Office February 2004 Tina Herrera
Introducing Microsoft Lync 2010 Connect and Collaborate.
Welcome to the iTEC People & Events Directory … key points!
December 2010iTEC - Designing the future classroom1 Virginija Birenienė iTEC community moderator iTEC Edukata tools in Education.
Australia’s Innovation Action Plan – Self-Assessment Report June 2010 Barry Jones Industry and Small Business Policy Division.
TAKING COMPREHENSIVE DISTANCE-FLEXIBLE LEARNING TO THE NEXT LEVEL Prof. Dr. Karim Zerhouni Chief Information Officer Head of Sciences Division Prof. Dr.
BCNET Security Policies Jens Haeusser Information Security Officer, UBC and Chair, Security Working Group, BCNET Internet2 Joint Techs Vancouver, BC July.
Mobility Project iPad Experiences & Results Child Welfare Technology Conference October 23, 2013 PRESENTED BY County of Ventura, Human Services Agency.
Familiarisation with the new environment, staff and friendship formation: Using QR Whodunnit Mystery Activity for students transitioning into HE Sharon.
Going global: student led internationalisation Heather McKnight, Academic Affairs Manager Students’ Union Parallel session 1 (10.00 – am) The Checkland.
The Deanes School Our ICT Journey. Our Starting Point SLT residential in November 2004 Started January 2005 SWOT analysis Interviews with all staff Interviews.
State of Alaska Division of Retirement and Benefits Introduces WebEx™ Division of Retirement and Benefits.
University of North Dakota Office of Institutional Research November 8, 2013 Drivers get ready - new dashboards are coming your way! Presented at the.
Team Members: Gosia Dzienisowicz Steve Filipiak Yulanda Nelson Kaushik Patel.
National Secondary School Computer Fund (NSSCF)
Connecting Classrooms Online. What is Connecting Classrooms Online?  Connecting Classrooms Online (CCO) provides a single, over-arching framework for.
An Evaluation done by: Lisa R. Hansen Needs Assessment Analysis Star Chart Analysis Results Campuses are at a Developing Technology Level In the areas.
Work Tools of Tomorrow: A Case Study in Innovation Financial Management Institute Jill Kot, Assistant Deputy Minister Workplace Technology Services Ministry.
President’s Office University Strategy University Strategy ‘Leadership through Foresight’ Overview.
IT Staff Survey Overview Over 1,300 responses were received. Staff across all faculties and support services were represented. 50 % of respondents.
Continuing the work of the Bill & Melinda Gates Foundation Presented by: Jeff Stauffer WebJunction Service Manager Date: 3 February 2005.
Information Technology Services ITS Update to UMG Thursday 22 nd April 2010 Alison Trpevski – Associate Director Client Services – ITS.
Partners in Care: Working with families/whaanau to encourage participation Background: A proposed change to our admission documentation, included questions.
Last Updated 1/17/02 1 Business Drivers Guiding Portal Evolution Portals Integrate web-based systems to increase productivity and reduce.
Conferencing & Collaboration from Desktop to Robot Ronald Haynes, CUCS Oxford ICT Forum Conference 14 th July 2011.
Elucido CONNECT. 2  Collaborate using personal devices AND from conference rooms…  Write, Annotate, Create documents & presentations on the fly…  Experience.
Video Griffith General Update Tim Gentile, Project Manager VC Infrastructure.
QUESTnet Workshop Video Conferencing & The One USQ Connectivity Project Presented by Troy Downs (Manager Unified Communications Projects)
Video Griffith Green Considerations Peter Kurtz, Manager Network & Collaboration Services Information Technology Infrastructure.
Introducing Microsoft Lync 2010 Connect and Collaborate.
THINK EFFICIENCY Administration Review Customer & Support Services Scrutiny Committee 24 th November 2008.
ITExpo January 24, 2006 Networks C OGNITRONICS Network Media Servers Conferencing and Collaboration Mike Keefe CTO Presented by.
1 New Enhanced Collaboration Workspace Pilot Initiative for 2006 ITSC Status Update Sally Waselik 02-Dec-2005.
Department of Employment, Economic Development and Innovation Harnessing the Digital Economy “Setting the Strategic Context” 9 December 2011 Malcolm Letts.
Google Apps and Tools for the Classroom
Presentation on “Technology used by university student”
Strategic Planning Chester County Library System Strategic Planning Steering Committee November 14, 2008 Gail Griffith.
0 What Does SIP Bring to Your Customer Experience ? Extend VoIP and IP Contact Center values through support of SIP o Media and location independent support.
UNIVERSITY OF JYVÄSKYLÄ ICT Support in International MDPs Tuning International Master’s Programmes Merja Ruuska Planning Officer Information.
Hunter Trainers & Assessors Network (HTAN) Facilitator HTAN Recognition Network – Sue Flindell.
University of Wyoming Financial Reporting Initiative Update April 2016.
1 © 2016 Lifesize, Inc. All Rights Reserved. Confidential. Continuing the Conversation Beyond the Meeting Lifesize ® Cloud — Group Chat March 2016 Confidential.
Centre for Education Futures: Futures Observatory Second Activity Report February 2016.
RAIL SUPPLIER ADVOCATE Bruce Griffiths RTAA Field Day 26 October 2011.
Education Portal Solutions for Higher Education Education portals create a common gateway to the data and services that the people throughout your university.
TeraGrid’s Process for Meeting User Needs. Jay Boisseau, Texas Advanced Computing Center Dennis Gannon, Indiana University Ralph Roskies, University of.
1 Intended use of this Presentation This presentation is for the client Executive contact to use with their internal Enterprise eTIME Project Team. The.
Digital Campus: Foundation Projects
Cara Clifford Instructor, Learn iT!
CONNECT.
Professor Rebecca Strachan Sanaa Aljabali
Developing Innovative Unified Communications Applications
Presentation transcript:

Mobility Workshop Griffith University Case Study Bruce Callow Director – Information and Communication Technology Services ICTS November 2011

About Griffith University

Fast Facts  Griffith University opened in 1975  5 campuses across 3 cities (Brisbane, Logan and the Gold Coast)  Over 300 degrees available for study  10 broad study areas: Humanities, Languages and Criminology, Business and Commerce, Education, Engineering and IT, Environment, Planning and Architecture, Health, Law, Music, Science, Visual and Creative Arts  Over 40,000 students (domestic and international)  Over 100,000 graduates from over 156 countries have passed through our doors ICTS November 2011

New Sir Samuel Griffith building  Griffith University is building Australia’s first zero-emission and self-powering teaching and research building driven by solar-powered hydrogen energy, which will be a model for remote communities that are 'off-grid' and cannot access power in Australia and across the world ICTS November 2011 For completion by end of 2012 at Nathan campus

ICTS November 2011 New Science, Engineering and Architecture building  Science, Engineering and Architecture building at the Gold Coast campus Opened 2010

6 Science, Environment, Engineering and Technology July Campuses in Queensland, Australia ICTS November 2011

Mobility  Enterprise mobility defined by devices people carry, their job roles and their mobility.  The application of mobile devices and wireless technology to enable communication, information access, and business transactions from any device, from anyone, from anywhere, at anytime.  Mobility Solutions include the delivery of: »Solutions for information sharing and networking »Solutions for wireless connectivity (network infrastructure/systems) »Solutions for personal portable, localized information and transaction enabling (mobile devices)  Convergence of wireless, mobile devices and the internet ICTS November 2011

Mobility at Griffith  Unified Communications – Pilot done  Virtualised Desktop – Pilot commencing  BYOD – Consideration stage  Support for mobile devices – Struggling with  Wireless network – Planning extensive growth  Eduroam – In place  Learning spaces – considerable work done  Mobile apps – released, next release in January / February ICTS November 2011

Case Study ICTS November 2011

 CASE STUDY – Use of personal video conferencing and Unified Communications  Survey to determine current practices  Development of business case  Setup of pilot technology and training of pilot group  Running of Pilot  Review ICTS November 2011

Survey  The aim of the survey was to determine high level themes in collaboration tools, practices and behaviors and needs.  The sample consisted of the same individuals selected to partake in Griffith University’s Video Collaboration and System Trial and was comprised of a number roles including executive roles, management roles and team roles. The sample came from: » Griffith Executive, » INS Executive, » Information and Communication Technology Services, » Scholarly Information Research, and » Learning and Teaching.  94 participants in the pilot; 44 responded to the survey and 21 were interviewed ICTS November 2011

Survey Results  The most frequently utilised forms of collaboration for the sample were General Communication, Management Meetings and Workshop Meetings respectively. ICTS November 2011

Survey Results  Face to face collaboration is the most popular method of collaboration for 5 of the 6 collaborative activities followed closely by video conferencing, web conferencing and . ICTS November 2011

Survey Results  Some points to note: 59% of respondents would spend 1 hour or more of their time travelling between campuses for meetings. 10% cent of these respondents estimated that they spent more than 5 hours in transit between campuses each week.  In 42% of cases, the meeting activities requiring travel lasted only an hour or less. ICTS November 2011

Survey Results  ICTS November 2011

Business Case  Using scenarios to indicate a management collaboration baseline, and also the benefit opportunity.  The Student experience not included in this business case. ICTS November 2011

Current state scenario - Operations management collaboration  Sandra is a manager located at the Gold Coast with 4 teams each with 6 members located across other campuses.  Sandra is member of her peer management group, 2 Griffith SME committees and 2 inter University forums.  Sandra often has a full diary of commitments each week. She performs a juggling act when scheduling in appointments or receiving meeting requests, selecting any slot available. She provides similar guidance to her team. As such she does not “have time” to think about the best method for collaboration and it is often face to face.  Sandra has attempted video conferencing on a number of occasions, however the rooms were already booked over a month in advance. As such, she travels to: »Logan campus 2x per month and Nathan campus 2x per week for routine team management meetings. »Nathan once per month for strategic forums (e.g. policy, key decisions making). »Nathan 2x per month and Southbank 6x per year for projects and workshops. ICTS November 2011

New state scenario - Operations management collaboration  Due to recent initiatives within the University a number of options for collaboration have been made available to Sandra in supporting her role:  Integrated video conferencing and portable video facilities,  Desktop conferencing solutions (video phone and web-based tools), and  Real time document sharing and editing capabilities.  Sandra now conducts significantly more collaboration form her desk space. Similarly, because of the holistic use of the improved collaboration tools with the university, Sandra is also requested to use the tools more via diary invites from other Griffith staff and managers.  As such, Sandra’s travel now consists of : »Logan campus 1x per month and Nathan campus 4x per month for team management meetings and strategic forums. »Southbank 4x per year for projects and workshops.  All other activities are carried out on the GC and through video collaboration. ICTS November 2011

So what are the figures  Current State  New State ICTS November 2011

How the figures stacked up  Each graph is based upon the Griffith Executive Group, 15 teams where 2 members of each team travel between campuses and a varying number of managers who travel / work between campuses. The X Axis on each graph is for the number of managers.  Calculations are based on:  1. Vehicle Running costs use University chargeout rates for pool vehicles.  2. Vehicles are changed over at 60,000k at a cost of $30,000 per vehicle.  3. There are 210 working days in a year used to calculate staff savings.  4. Annual staff costs including on-costs is calculated at $125,000. ICTS November 2011

Technology Solution  Drivers  Ease of use  Integrate room based with desktop with phones with mobility  Ability to link locally, nationally and internationally  Fit for purpose – multiple solutions  It must “Just work” all the time ICTS November 2011

Learnings  How to recover the savings  Varying degrees of acceptance  Need to be done as a workgroup  Ease of use and understanding of solution is paramount  Excellent Change managers / trainers required ICTS November 2011

Where to from here  Further work to increase integration of technology and increased options for users  Planning for rollout of IPtel and Unified Comms  Funding model ICTS November 2011

Questions and comments ICTS November 2011