December 3-4, 2003 Green Bank GBT PTCS In Progress Review EMS/LRF Update Richard Prestage.

Slides:



Advertisements
Similar presentations
1 Establishing Performance Indicators in Support of The Illinois Commitment Presented to the Illinois Board of Higher Education December 11, 2001.
Advertisements

Which season do you like best? 1106 Grade 8 Unit 9.
WI State Report RVIPP, Indianapolis, IN June 9-10, 2010.
WALT: Know the months of the year poem. Answer questions about the months.
Early Intervention- Early Childhood Professional Development Community of Practice June 21, 2012.
DOT 1 January , 1990 DOT 2 July 23 - August 3, 1990.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Birthday Months By: Cynthia Tran Months in a year? January February March April May June July August September October November December.
UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Green Bank Laser Rangefinders.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Instrumentation K. Constantikes.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review GBT Precision Telescope Control System Kim Constantikes 4/8-9/03.
DOC Emergency Management Update June 15, Agenda Mass Communication updates Fall Exercise Planning Faculty guidance for emergencies Business continuity.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
School Census Spring 2011 Headlines 1 Version 1.1.
December 3-4, Green Bank GBT PTCS In Progress Review Laser Rangefinder Update 9/5/03 Experiment K. Constantikes.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Weather Fatima Emirova.
WEATHER BY: JENNIFER FAUTH KINDERGARTEN.
December 3-4, 2003 Green Bank GBT PTCS In Progress Review Future Development Program Kim Constantikes, Richard Prestage.
Life Cycle Logistics Validation and Workforce Assessment LOG FIPT Presentation March 28, 2008 LOG FIPT AT&L HCSP Competency Initiative … Enabling a High-Performing,
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Out of Focus (OOF) Holography for the GBT Claire Chandler.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Overview of the High Frequency Observing System Richard Prestage.
Prototyping life cycle Important steps 1. Does prototyping suit the system 2. Abbreviated representation of requirements 3. Abbreviated design specification.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
The months of the year January February. The months of the year March April.
SPIE – June 25, The Details….. SPIE – June 25, Previous Focus Tracking Curves.
December 3-4, Green Bank GBT PTCS In Progress Review Thermal Focus and Pointing Corrections K. Constantikes.
1 WISE SoE data reporting: cycle of business processes 2013 Marine Eionet Workshop 24/25 September 2013, Copenhagen Marek Staron Data operator SES2, EEA.
How did we get to this point Reviewed the BDA (2008) Curriculum Framework Hosted a number of consultation events in 2010 with placement providers Developed.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
Status summary of the ad-hoc discussions 29th of June 2012 oneM2M call.
NON-ACADEMIC POLICY TIMELINE For February 2010 Policies of great importance or policies that relate to a University regulation may need to go to the BOT.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
January 6, 2005 URSI Nation Radio Science Meeting, Boulder, CO. Pointing and Focusing the GBT K. T. Constantikes NRAO Green Bank.
PSAT/NMSQT  Administered one time per year in October  Highly recommended for Grades 8-11  Must take in Grade 11 to qualify as a National Merit Scholar.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Richard Prestage, Kim Constantikes, Dana Balser, Jim Condon The GBT Precision Telescope Control.
Сегодня мы с вами на уроке: Познакомимся с названиями месяцев; Познакомимся с названиями месяцев; Вспомним слова, которые нам помогут при обсуждении темы.
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Critical issues in Planning, Design and Development
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Can you guess what this lesson is about?
Year 2 Autumn Term Week 12 Lesson 1
13-block rotation schedule
NATA Foundation Building Blocks Process
The SAT will be given at ECHS on the dates below!
McDonald’s Kalender 2009.
Problem Gambling Clicks to Opgr.org
Chapter 6 Activity Planning.
SEASONS Khalatyan Nane Artschool The 4th grade.
McDonald’s calendar 2007.
Strategic Planning Timeline Overview
Year 2 Autumn Term Week 12 Lesson 1
Critical issues in Planning, Design and Development
Teacher name August phone: Enter text here.
Calendar.
Tropical cyclones movement
February 2007 Note: Source:.
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

December 3-4, 2003 Green Bank GBT PTCS In Progress Review EMS/LRF Update Richard Prestage

2 Goals From April CoDR: “….EMS/LRF…will be available as a GBT surveying tool, allowing us to measure critical dimensions and characterize the antenna with considerably higher accuracy and convenience than is possible with conventional surveying techniques”. Panel Report: “…Careful measurements of simpler performance aspects are needed to evaluate if the LRF are useful in other modes of operation.....”

3 From June 16 th PTCS Project Meeting EMS Objectives –“Production” Use, 1mm or better –Characterization of LRF accuracy –Develop EMS/Wit/Matlab frameworks for experiments –Feed Arm Tip Survey –Subreflector Survey Schedule –EMS Framework (completed) –Test data set collection beginning early July, repeated at intervals –Prototype trilateration EMS code August, developed with July data –Completed FA survey tool September –Prototype SR survey tool September

4 Actual Schedule EMS sufficiently complete to execute experiments: late May. EMS Refinements for real-time trilateration results: August. LRFs ready for basic trilateration experiment: end August First “successful” trilateration experiment: 5 th September

5 Results EMS prototyping/characterization tool resounding success. LRF trilateration results c.f. traditional survey showed significant discrepancies. April to September: ~two staff years of effort. Clearly would not be able to make any significant performance contributions for Winter 03/04. Temperature sensors and traditional approaches were showing great promise. Postpone further LRF work until Spring 2004.