P. Dupieux (ALICE), A. Cardini (LHCb) M. Abbrescia, K. Hoepfner, A. Safonov (CMS) Ch. Amelung, O. Kortner, S. Veneziano (ATLAS) 4t meeting with the HL-LHC.

Slides:



Advertisements
Similar presentations
L1 Track Trigger for ATLAS at HL-LHC
Advertisements

(ATLAS) Higgs Prospects at HL-LHC. ATLAS CMS ALICE LHCb Center-of-Mass Energy ( ) 7 TeV Center-of-Mass Energy (Nominal) 14 TeV ? Center-of-Mass.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
7 Nov 2002Niels Tuning - Vertex A vertex trigger for LHCb The trigger for LHCb ….. and the use of the Si vertex detector at the first and second.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
CMS Phase 2 Upgrade: Scope and R&D goals CMS Phase 2 Upgrade: Scope and R&D goals October 21, 2014 Jeremiah Mans On behalf of the CMS Collaboration.
LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
Proposal and current status of developments 4 th RD51 meeting (WG1) 23 November 2009 Atsuhiko Ochi ( Kobe University )
27 th June 2008Johannes Albrecht, BEACH 2008 Johannes Albrecht Physikalisches Institut Universität Heidelberg on behalf of the LHCb Collaboration The LHCb.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
LHeC : Muon Systems L. Pontecorvo.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
The forward detectors of CMS Experiment at LHC Bolek Wyslouch MIT
The CMS Upgrade Program ECFA High Luminosity LHC Experiments Workshop Aix-les-Bains, October 1, 2013 J. Spalding, on behalf of the CMS Collaboration 1.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
Tracking at the ATLAS LVL2 Trigger Athens – HEP2003 Nikos Konstantinidis University College London.
NSW background studies Max Bellomo, Nektarios Benekos, Niels van Eldik, Andrew Haas, Peter Kluit, Jochen Meyer, Felix Rauscher 1.
Roger Rusack – The University of Minnesota 1.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
Workshop 24 Jun 11 AB Workshop on GEMs for CMS high  Last September’s workshop showed that MPGD technology is now mature. Stable operation of large area.
A new generation of RPCs to be tested for the super- LHC CERN GIF workshop 20/06/2011 G. Aielli.
ATLAS upgrades Xmass meeting Current ATLAS Operations ATLAS has been working very well  First beams in Sept recorded successfully by all sub- detectors.
C. F. Bedoya. C. F. Bedoya May 13th, * The goal was to establish a baseline plan for DT in Phase 2, (although some aspects of phase 1 also needed.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
1 Triggering on Diffraction with the CMS Level-1 Trigger Monika Grothe, U Wisconsin HERA-LHC workshop March 2004 Need highest achievable LHC Lumi, L LHC.
Overview of the High-Level Trigger Electron and Photon Selection for the ATLAS Experiment at the LHC Ricardo Gonçalo, Royal Holloway University of London.
Precision Drift Chambers for the ATLAS Muon Spectrometer
W. Riegler, ECFA HL-LHC Experiment Workshop, Oct. 21st, 2014 The ALICE Upgrade.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
David Silvermyr Lund University for the PHENIX Collaboration Early global event results using the PHENIX Pad Chambers at RHIC.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
July 27, 2002CMS Heavy Ions Bolek Wyslouch1 Heavy Ion Physics with the CMS Experiment at the Large Hadron Collider Bolek Wyslouch MIT for the CMS Collaboration.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
( ATLAS was designed for LHC: L=10 34 cm -2 s -1 ) [ Now we expect 7.5 x instantaneous and 10 x integrated luminosity ] PILEUP: from ~30  >200 proton.
Comparison of different chamber configurations for the high luminosity upgrade of M2R2 G. Martellotti - LNF - 13/03/2015 Roma1 + Alessia.
Effects of Endcap Staging/Descoping D.Acosta University of Florida.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
RPCs with Ar-CO2 mix G. Aielli; R.Cardarelli; A. Zerbini For the ATLAS ROMA2 group.
Extending the PHENIX physics reach Physics beyond the baseline accessible at RHIC II Capabilities needed to address the new physics Detector upgrades to.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Trigger & Tracking detector for CMS
Technology and R&D Summary and next steps Burkhard Schmidt.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
ATLAS Upgrade Program Sarah Demers, US ATLAS Fellow with BNL
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
ATLAS-MUON Trigger hardware developments
Third Workshop on GEMs for CMS
Jet reconstruction in ALICE using the EMCal
Why Micromegas? Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack.
(with R. Arcidiacono, A. Solano)
Anna Colaleo - INFN-Bari On behalf of the CMS Muon group
RPC and LST at High Luminosity
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
GEANT Simulations and Track Reconstruction
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Presentation transcript:

P. Dupieux (ALICE), A. Cardini (LHCb) M. Abbrescia, K. Hoepfner, A. Safonov (CMS) Ch. Amelung, O. Kortner, S. Veneziano (ATLAS) 4t meeting with the HL-LHC Steering Committee

Preliminary issues #1  Defined three main “themes” :  New running conditions and new requirements from physics, consequences for muon detection  System longevity, upgrades foreseen,new detectors and R&D  Electronics (front-end and trigger),trigger algorithms, alignment 2 M. Abbrescia Muon System Preparatory Group

Preliminary issues #2  Thinking of splitting theme #2 in two talks:  2a. Longevity of the muon systems  2b. Upgrades and new detectors R&D  Agreed with the Tracker PG that MPGD technologies – of interest for both communities - will be dealt here  Dicussion on potential speakers just started  Premature to propose names – will do it before the end of June  Discussion on talk duration just started (depend on split of theme#2) 3 M. Abbrescia Muon System Preparatory Group

Theme (talk) #1  New running conditions and new requirements from physics, consequences for muon detection  focus on muon detectors requirements from operating conditions after LS2 and the HL-LHC physics program  final integrated luminosity and accumulated radiation, increased instantaneous luminosity, pile-up, etc.  predictions for correlated (beam-induced) and uncorrelated (cavern) background  consequences for detector functioning, required time resolution, and off-line track reconstruction  adequacy or deficiencies of the existing systems performance (extrapolated), and potential improvements  new/better signal/track reconstruction algorithms possible with improved detectors M. Abbrescia Muon System Preparatory Group 4

Theme #2 – one or two talks  System longevity, upgrades foreseen, new detectors and relative R&D  System longevity of the muon systems (talk 2a?)  Muon detector problems after LS2, actions to keep the performance stable, possible improvements using new detectors  Chambers reaching rate limits, high occupancy, high dead time;  Chambers aging due to radiation or accumulated charge  Upgrades with new detectors (talk 2b?)  Replacing old detectors by new ones  Extending muon system coverage with new detectors  R&D for new detector types (including MPGD)  Experimental facilities needed for this R&D M. Abbrescia Muon System Preparatory Group 5

Theme #3  Electronics (front-end and trigger), alignment  effect of increased radiation and higher collision rates on front-end electronics and trigger systems  radiation damage, single-event upsets  readout electronics bandwidth limitations  electronics upgrades  trigger performance, sharpness of trigger threshold, purity  hitting maximum allowed trigger rates  increasing the complexity of low-level trigger algorithms – requiring increased trigger latency  alignment – optical systems and alignment-using-tracks  radiation damage to sensor electronics M. Abbrescia Muon System Preparatory Group 6

 Basic goals of ATLAS:  Keep muon detection efficiency and momentum resolution at the existing level  Keep muon trigger rates at acceptable level  Assumptions for run IV (after LS3):  =5x10 34 cm -2 s -1, L peak =7x10 34 cm -2 s -1  Up to 200 pile-up events (with a safety factor of ~1.5)  Plan to accumulate 3000 fb -1 of pp collision data. M. Abbrescia Muon System Preparatory Group 7

 Implications of these operating parameters:  High cavern background:  Highest expected rates in the Small Wheels (innermost endcap wheel, 7m from IP): 15 kHz/cm 2 (r=100 cm from beam line), 100% occupancy in the MDT chambers, and too high for CSC chambers too.  For comparison, highest rates in the Big Wheels (middle endcap wheel, 14m from IP): ~250 Hz/cm 2, corresponding to ~10% occupancy in the MDT chambers.  Present level 1 trigger rates would be as high as 140 kHz for single muon trigger with p T >20 GeV at the HL-LHC peak luminosity.  Frequent buffer overflows of the MDT front-end electronics expected, due to a high trigger rate at high occupancy. M. Abbrescia Muon System Preparatory Group 8

 Present upgrade plans - the two major ones:  Small Wheels will be replaced in phase-1 upgrade by New Small Wheels (NSW), using sTGC and Micromegas chambers. NSW is designed to be able to continue to operate under HL-LHC operating conditions, i.e. until the end of the lifetime of ATLAS.  Redesign of the complete level 0/1 muon trigger, which entails replacing a large fraction of the electronics chain of precision and trigger chambers. M. Abbrescia Muon System Preparatory Group 9

- Physics context  Muon offline coverage and trigger performance critical independent of physics; e.g. sensitivity to H couplings measurements strongly depends on channels with µ:  H-> ττ-> µ +X is key for measuring coupling to fermions  H->ZZ->4µ or 2µ+X is key for coupling to vector bosons  H->2 µ will be measurable at high luminosity giving new insight on fermion coupling  Substantial gains in LHC reach, if iCMS to extend muon system and possibly triggering capabilities beyond current η=2.4  A substantial challenge as even maintaining the current envelope may not be easy, given very high rates and limitations arising from complex magnetic field configuration, material.  Particularly strong motivation for going forward if inner tracking capabilities are extended simultaneously (being considered by CMS) M. Abbrescia Muon System Preparatory Group 10

- Scenarios for moving forward A 2-prong strategy being pursued:  Work to ensure maintaining the current µ offline and triggering envelope, provide strengthening as required  Very likely that we will find that it will be necessary as a third of µ coverage 1.6<η<2.4 is in potential jeopardy due to rate increases and trigger bandwidth limitations  A thorough cost-benefit analysis of scenarios extending into the region of up to η=  Physics gains substantial, but challenges can be very significant  The outcome will depend on other sub-system’s plans, especially tracking, but also the calorimeter  New technologies capable of withstanding high rates are considered (GEM, MPGD, iRPC) including new ideas, e.g. imaging calorimeter with µ tagging  Simulation will be critical to provide the full picture M. Abbrescia Muon System Preparatory Group 11

CMS#theme1 - Challenges in more detail  Maintaining current envelope:  All the original complexities for the forward region stay in place: magnetic field, large material budget, high background rates, triggering challenges, shielding concerns given the space constraints  Rate increase further complicates these old challenges, but also bring new ones (aging)  Enhanced coverage options beyond η=2.4 and up to η=4.0:  New ideas in the context of physics enhancements due to better triggering, resolution and efficiency, including the broader context of the related detector systems (tracking, calorimetry)  Detector technology choices at very forward region driven by high rates and aging.  Post-Phase-2: 10s of kHz/cm 2 in the region η=  Expect a further rate increase, perhaps up to an order of magnitude on the high eta edge? Even higher abilities to withstand aging needed M. Abbrescia Muon System Preparatory Group 12

 The plans of the ALICE muon system (MS) upgrades are limited (as compared to CMS/ATLAS ones) because the constraints on the luminosity are much less important  ALICE MS upgrades are fully scheduled to be installed during the LS2, nothing foreseen for LS3.  Operating conditions and requirements. ALICE operating conditions after LS2:  PbPb 100 kHz (MAX collision rate) => L~10^28 /cm/s (the constraints in pp are expected to be less)  One order of magnitude above the MS present design.  Total integrated luminosity in PbPb ~10 nb-1 (goal) M. Abbrescia Muon System Preparatory Group 13

 Detector upgrades  Existing MS: Angular coverage: 2-9 degrees (one arm only)  Muon Traking, 10 planes of cathode pad/strip chambers, 1 Mch  Muon Trigger, 4 planes of single gap RPCs, 20 Kch  Upgrade Plans: No modification of the existing detectors  Electronics upgrades  Replacement of the readout electronics of the Muon Tracking and Muon Trigger, towards a dead time free readout => ALICE CRU (Common Readout Units)  Replacement of the very FE of the Muon Tracking => based on ongoing developements of the S-ALTRO chip essentially  Replacement of the very FE of the Muon Trigger => very FE with amplification (it is not the case presentely) for operation in genuine avalanche mode (like CMS/ATLAS RPCs) in order to limit the RPC aging => new ASIC (FEERIC) being developped M. Abbrescia Muon System Preparatory Group 14

 Upgrade taking place in LS2, like ALICE  Operating conditions and requirements  After LS2 we will be operating at 2 x 1o 33 cm -2 -s-1, which is x10 w.r.t. current design, but only x5 w.r.t. to current data taking conditions Plan is to acquire 50 fb-1 in 10 years.  Muon chambers for the upgrades  Only minor modifications of the existing muon detector (but probably only between LS2 and LS3): some highly irradiated detectors ( MHz/cm2) will be replaced with triple-GEM detectors with pad reaodut  Electronics upgrade - This is the main goal of our upgrade:  new common readout boards for 40 MHz readout  new muon off detector electronics boards  low level muon trigger at 40 MHz used just after LS2, and eventually we will go to NO low level trigger and processing of ALL events by high level trigger with a super PC farm  new electronics for muon control M. Abbrescia Muon System Preparatory Group 15

Things to do  Decide if split theme#2 into two talks  Better define talks from #2 on (talk #1 is quite well defined)  Decide speakers and allocate talks M. Abbrescia Muon System Preparatory Group 16