Tracy Lovell, PE HSIP PROJECT PROCESS. HSIP Process  Identify the location – RD Corridor, Emphasis Area, etc.  Conduct Road Safety Audit with multi-disciplinary.

Slides:



Advertisements
Similar presentations
Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
Advertisements

Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
1 Element 1: The Systemic Safety Project Selection Process Element 1: 4-Step Project Selection Process.
HSM: Celebrating 5 Years Together Brian Ray, PE Casey Bergh, PE.
SIXTH ANNUAL AMOTIA CONFERENCE Asset Maintenance in Louisiana Rhett A. Desselle, P.E. 10/03/2014.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
1 LOW COST SYSTEMATIC SAFETY IMPROVEMENTS Sue Groth Mn/DOT Sue.Grothdot.state.mn.us.
U.S. 231 Intersection Improvement in North Spencer County Heritage Hills High School Thursday, April 30, 2015.
Single Point of Contact (SPOC) MTC Workshop PRESENTED BY: Sylvia Fung District 4 Local Assistance September 2014.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
All Roads Transportation Safety (ARTS) Program Kevin J. Haas, P.E. Traffic Investigations Engineer, ODOT February 26, 2015.
Safety Project Request received by TDOT Safety Project Request sent to RSAR Coordinator Safety Planning Office completes Letter of Findings for internal.
. Efforts to Reduce Crashes on County Roads in Iowa.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
Old Policy – which no one ever seem to have heard of.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Traffic Engineering Division Traffic Operations Traffic Administration Construction and maintenance of traffic control devices. Engineering design Signal.
Operation & Maintenance Budget Public Works Department FY Budget Worksession July 13, 2015.
Local Rural Highway Investment Program (LRHIP)
Upcoming changes. Big & Small Changes Coming  Currently have 2 traffic engineering permits  Will have 11 new & different traffic engineering permits.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
City of Henderson Citizens Traffic Advisory Board NDOT SAFETY UPDATE.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
Highway Operations Section Technical Standards Branch Section overview.
9-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Exercise C – Session #9.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
The 2010 Evaluation of Low Cost Safety Improvements Pooled Fund Study Technical Advisory Committee Meeting March 2010 Thomas M. Welch, P.E. State Transportation.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
2015 Traffic Signals 101 Topic 2 Agreements. Office of Traffic, Safety, and Technology Agreements Signal Agreements An Agreement is a contract between.
NC Local Safety Partnership Selecting Interventions.
All Roads Transportation Safety (ARTS) Program Angela Kargel Region 2 Traffic Manager Oregon Department of Transportation January 2015.
Louisiana Local Road Safety Program
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Engineering our Highways for Older Drivers in Minnesota
Small Cost – Big Impact: Lessons in Low-Cost Safety Improvements Gustave Scheerbaum, PE Complete Streets Safety Engineer ARLE Grant Programs Manager City.
US 421 Centerline Rumble Strips in Chatham Co. Renee B. Roach, P.E. and Al Grandy May 2, 2007.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Jason J. Siwula, PE – Safety Engineer HSIP HORIZONTAL ALIGNMENT SIGNING.
October 15 th, 2013 The City of Akron SUM – Exchange Street / Cedar Street Corridor Safety Study.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Metro Highway Program Presentation to CMAA Abdollah Ansari
1 Evaluation of Low-Cost Safety Improvements (ELCSI) Pooled Fund Study Roya Amjadi, Highway Research Engineer FHWA, Turner-Fairbank Research Center 10/24/08.
SUCCESSFUL APPLICATION FOR HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) GRANTS Presented By: Patrick V. DeChellis Deputy Director Los Angeles County Department.
California’s Experience with HFST 1.  Overview  Challenging Locations  Collision Reduction (State and Local Roads)  Typical Placement and current.
Road Safety Audits Road School, 2011 Rick Drumm, P.E. Safety Engineer Federal Highway Administration.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
INDOT Office of Traffic Safety Manager, Mike Holowaty
Improvements to Stockton Street
Learning Outcomes Describe ways to incorporate and implement practical safety solutions during projects and maintenance. Identify potential sources of.
VDOT’s Operations Program Opportunities May 20, 2016
DISTRICT 7 DESIGN-BUILD PUSH BUTTON (FEDERAL SAFETY AND STATE FUNDS)
Interdisciplinary teams Existing or new roadway
CTDOT Traffic Safety Engineering
OR 99E Corridor Segment Plan
Meeting of the Hillsborough MPO Board December 5, 2017
SR 25 – Hoosier Heartland Highway Lafayette to Logansport
Highway Safety Team Staff Meeting SMART Portal HSIP Application Demonstration Systemic Safety Improvement (SSI) November 21,2017.
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
SW 6th Ave. – Fairlawn to Gage
I-295/Malcolm X Avenue Interchange Improvement Project
Design Criteria CTC 440.
Environmental Commitments
Protected Bicycle Lanes Finally Pedal Their Way to KC…
SCOHTS Meeting April 29-May 1, 2009
ARCHIE BRIGGS Traffic Calming
Project Location: 35th Ave HSIP8
Presentation transcript:

Tracy Lovell, PE HSIP PROJECT PROCESS

HSIP Process  Identify the location – RD Corridor, Emphasis Area, etc.  Conduct Road Safety Audit with multi-disciplinary team. OR, prepare estimate for identified countermeasure  Submit Right of Way, Utility and Environmental Clearance Documents with Funding Request  Process Environmental Documents  Request Funding  Process Right of Way Clearance  Create Proposal  Advertise for Bids  Award Contract  Construct District HSIP Coordinator is the Contact Point for All Phases

Chosen Countermeasure(s)  An identified/requested countermeasure does NOT eliminate the need to follow existing approval procedures.  You must follow other Cabinet policies when applicable.

Division of Traffic Operations Approval  Traffic signals  New installs  Modifications  Beacons  Intersection  AWB/Sign beacons  Audible/accessible, exclusive ped phases  School flasher assemblies/speed limits  Reversible lane signals  AWFs

Division of Traffic Operations Approval – Cont’d  LED-Enhanced signing  Lighting  Interchange  Intersection  Roundabout  In-roadway  Interchange guide signing  Word markings on pavements (non-std)  Speed limit changes  RPMs  Rumble strips  Permanent transverse  Edgeline  Centerline (non-std)