1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:

Slides:



Advertisements
Similar presentations
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Advertisements

Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
 Safety  Schedule: Past, Present and Future  RHIC and Experiment Reports  Machine and System Reports  AOB.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
May 12, 2009Włodek Guryn1 Physic Program with Tagged Forward Protons at STAR Single Diffraction Dissociation (inclusive SDD cross section, leading  0.
Run15 pp Achievement and pAu status Itaru Nakagawa RIKEN/RBRC.
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
Oct 6, 2008Amaresh Datta (UMass) 1 Double-Longitudinal Spin Asymmetry in Non-identified Charged Hadron Production at pp Collision at √s = 62.4 GeV at Amaresh.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
10/15/2007Dunlop, Welcome and Overview, Analysis Meeting Analysis Meeting 2007: Welcome and Overview James Dunlop Brookhaven National Laboratory.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
Run 12 RHIC Machine/Experiments Meeting 7 Dec 2011 (3 rd meeting) Agenda: Run 12 Priorities.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
STAR pp Run Summary Carl Gagliardi March 11, 2008.
Run 16 RHIC Machine/Experiments Meeting 5 Jan 2016 Agenda: Run 16 Schedule (Pile) AuAu Run Plan (Gu) Projections for deuteron-gold energy scan (Liu) STAR.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
STAR Summary for 2012 pp running May 11, 2012 Bill Christie, BNL Outline Summary of 200 GeV pp run Summary of 510 GeV pp run STAR’s running efficiency.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run16 Y. Akiba.
2006 Relative Luminosity Tai Sakuma MIT 3/19/2007.
Presentation transcript:

1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:

2 Run 8 Log 25 Oct, begin 45 degree cold wave (2.5 MW-NEW) 1 Nov, Cool-down to 4.5 degrees begins 4 Nov, Blue ring cold but still stabilizing 6 Nov, Blue and Yellow cold and stable (0.9 weeks into run) 8 Nov, Beam in Blue ring, “Setup Mode begins” 16 Nov, Beam in Blue and Yellow rings 18 Nov, First collisions (2.6 weeks into run) 19 Nov, Experiment Magnets on, begin night shifts for experiments, “Ramp-up Mode” begins (2.7 weeks into run) 26 Nov (1600 hrs), Machine declared operational for Physics (3.7 weeks into run) 29 Nov, PHENIX in physics mode 1 Dec STAR in limited physics mode (min-bias) 31 Dec, STAR in full physics mode 28 Jan, 0800, end dAu run (9 weeks physics) 28 Jan, maintenance and begin 100x100 GeV pp setup 10 Mar, 0800 pp run ends (6.0 weeks), Low energy AuAu setup begins 12 Mar, 0800 low energy AuAu ends 14 Mar, Cryo warm-up complete (19.3 cryo weeks)

3 PHENIX Original Goal STAR Original Goal

4 APEX/Maintenance days APEX 

5 PHENIX Goals for Run-8 pp Plan A –If higher luminosity, polarization achievable in Run-8 – pb -1 recorded, at P=0.6 –if we must plan on 1.2 pb -1 /week at P=0.5 –will be forced to return to transverse spin running – in a future year – we’ll tell you when, when you tell us the luminosity Plan B –2.5 pb-1 recorded at the maximum P you can give us –Switch ASAP to 500 GeV p+p for ≥ 2 weeks –We consider development so important we’ll risk the very short physics run –Skip the low energy test run in Run-8

6 STAR Goals for the 200 GeV pp run FMS reference data –Sample at least 9 pb -1 with fast detectors FMS transverse spin asymmetry measurements –Sampled figure of merit (P 2 L) at least 3.8 pb -1 with fast detectors –Equivalent to 9 pb -1 at 65% polarization Slow detector measurements for non-photonic electrons –Sample at least 4.5 pb -1 This requires: –C-AD deliver at least 18 pb -1 (assumes 50% STAR up time) –STAR operate the slow detectors with at least 50% live time –FMS fast detector data recorded when the slow detectors are both live and dead Has not been done during this year’s d+Au run Was done during Run 6 p+p

7 PHENIX Plan A 60% pol PHENIX Plan B Whatever % pol Then switch to  s=500 GeV and No Low E AuAu STAR 65% pol End of run STAR 50% pol p.pile understanding of experiment goals max min PHENIX Plan A 50% pol

8 Through 28 Jan 2008

9

10 Through 28 Jan 2008

11 Through 28 Jan 2008

12 Through Dec 2007 Trouble!

13

14 RHIC Machine/Detector Planning Meeting Next Meeting 5 Feb 08 Planning Meeting Web Site:

15 Through Nov 2007

16 Experiments luminosity goals for Run 8, 100 x 100 GeV pp –PHENIX Delivered luminosity = 140 nb -1 Recorded luminosity = 35 nb -1 –Longitudal Polarization goal: 26 nb -1 –Transverse polarization luminosity goal: 9 nb -1 Assumed efficiencies: 48% vertex, 64% up, 82% live  25% overall Assumed polarization: 65% Approximate physics weeks: 12 –STAR Delivered luminosity = 90 nb -1 –Longitudal polarization goal: 60 nb -1 –Transverse polarization luminosity goal: 30 nb -1 Slow detector sampled luminosity (Transverse and Longitudal) = 30 nb -1 Assumed efficiencies: 50% uptime, 65% live  33% overall Assumed polarization: 65% Approximate physics weeks: 12 pp2pp: 3 days of dedicated running Goals: 20M elastics, 300K double pomeron exchange events An issue: In 2006 it took 6 weeks of physics running to get from ~45% polarization to ~60% polarization, above goals assume 65% from physics day 1 (Last update 23 Oct 07)

17 (last update 10/23/07) Experiments luminosity goals for Run x 100 GeV/n d-Au –PHENIX Delivered luminosity = 230 nb -1 Recorded luminosity = 58 nb -1 Assumed efficiencies: 48% vertex, 53% live  25% overall Approximate weeks: 10 –STAR Delivered luminosity = 120 nb -1 Fast Detector sampled luminosity = 60 nb -1 Slow Detector sampled luminosity = 30 nb -1 Fast detector overall sampling efficiency = 50% Approximate weeks: 10 –Monopole Proposal – Detector Tests Once ~ 20:1 signal to background is achieved in building 902, move to 10:00 IR, reestablish good signal to background and then request collisions

18 Phenix Goal PHENIX Goal STAR Goal STAR and PHENIX Plan

19 PHENIX Goal STAR Goal STAR and PHENIX Plan

20 Fischer et.al. Possible 30 week run schedule