1 July 13, 2011 Some morning photos Tank Valve Box.

Slides:



Advertisements
Similar presentations
Inspect Water Distribution EO Air Gaps, Vacuum Breaker, and Back Flow Preventers TP 8 50 min.
Advertisements

Levolors New Size-In-Store Blind Cutting Machine.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
This is a Redneck Handy Mans reference book. Feel free to use any of the ideas. (Click to See Next Slide) Not responsible for fires, flooding, electrocutions,
Stem Challenge Energy management systems, CHP, Harvester tank, green roofs and underfloor heating. 1.
Growing Fish in a Recirculating System: Advanced Teacher’s Workshop An Inexpensive Recirculating System Blan Page & PJ Waters.
This is a Redneck “Handy Man’s” reference book. Feel free to use any of the ideas. (Click to See Next Slide) Not responsible for fires, flooding, electrocutions,
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
DUBAI STAR WORK PROGRESS DATE 23 JULY Material At Site.
Rebuild Stafford High School Update- October 2014.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
Scavenging System  To reduce exposure to waste anesthetic gases  Can be active or passive scavenging system Active Scavenging System  Connected to a.
THE SUMMER OF CHANGE Things are happening ….. WEEK ONE.
The Stephanie Country Mansion Dollhouse Assembly Instruction
Pulsation dampener ALHP Absorption is made by the deformation of hose controlled by compressed air Best result when the pick of maximum pulsation is +-
 Given: No information  Find: The Number of basketballs required to fill this classroom.
1 July 8, 2011 Boxes were moved between ground floor and console room floor. –Safety equipment and supplies identified and unpacked. –LN2 tank was unpacked.
MONALISA installation at the ATF2 ATF2 weekly meeting.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Painting An LNG Tank Important Processes To Follow! Painting An LNG Tank Important Processes to Follow William Donald Director Of Field Operations Tank.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
Scavenging System A&A Pg 356  To reduce exposure to waste anesthetic gases  Can be active or passive scavenging system Active Scavenging System  Connected.
Pump is Blue part (right) - timer is black (left side) New Electrical Outlet This Photo shows where the Re-Cir pump is installed on the Output line on.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
2004 South Carolina Dairy Products Contest Milker Parts Identification Study Guide.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
Construction Photo’s of FANDIC July, The Front of FANDIC Building 1st floorThe two floors.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
St. Peters School Carpeting and Refresh project October 5,6 and 7 th St. Peters School Carpeting and Refresh project October 5,6 and 7 th
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
April 19, 2006A.Klebaner Cryogenics for ILC TA Current Status Plans and issues.
Firefighter III Module B Water Supply (4-19) (4-19)
 Roof integration  USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear Research Warsaw University.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
1 Progress for July 16, 2011 We woke up to 9+ inches of new heavy snow.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.
Slide 1 of 33 Home Inspection Class Redfin’s Montgomery Team September 5, Bethesa, MD Host: Michael Wells & Margaret Plumly Like:
1 Progress for July 18, 2011 Morning Safety Meeting was held in the Control Room today. Tom & Herman worked with Jim Hughes (remotely) and made a temporary.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
1 Progress for July 19, 2011 Preparations for Fill. –4 protection valves were attached: 2 on Z-shaped tubes, 2 on the tank –Herman’s new CTIO engineering.
DECAM LN2 PUMP REMOVAL - CHECKLIST
Photo Album by V. Venkatesan.
1.3-GHz Cavity Vacuum Furnace at IB4
SABRE PoP Fluid Handling
Cryoplant Installation Scope
Crude Oil Storage Storage tanks containing crude oil and H2S are monitored by Model S4000T Intelligent Sensors. The sensors are dedicated to monitoring.
2.2 Gallon TourTank Installation
This is a Redneck “Handy Man’s” reference book
Private Fire Hydrant. Fire hydrant systems (also known as fire pumps, hydrant boosters, fire water pumps) are high pressure water pumps designed to increase.
Effective Methods to Test the Fuel Pressure Regulator in your Car.
EXAMPLE-#1 Connection at Meter Service
Consulting Captains, LLC
Trinity Square Field Report
ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
Overarching Commissioning Plan
Instructions: Adding refrigerant fluid to system
Around the room Orders of operations.
This is a Redneck “Handy Man’s” reference book
This is a Redneck “Handy Man’s” reference book
SC1R Cold Box PDR Assembly Sequence
Three Bridges Estates HOA Meeting
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
Presentation transcript:

1 July 13, 2011 Some morning photos Tank Valve Box

2 “Action” Shots All four Z tubes moved to C floor, one installed on valve box To locate position of hole in floor

3 July 13, 2011 Ricardo and Rodrigo practice with LN2 and vacuum fittings Jorge attached the tank to the console room roof Electrical outlets installed on old console post, ready to hook up now

4 July 13, 2011 Tubes installed in Coude room

5 July 13, 2011 Hole in floor to secret stair case and Coude room in progress at 4pm Photo shows railings & diagonal braces

6 Plans Install two Z-shaped pipes and attach to hoses in Coude room Store or install the other two z pipes Install the Coude room valve box. Note: it will take ~500 liters of LN2 to fill the tank the 1 st time (next week)