SC Magnets TF International Collaborations JINR Accelerators Detectors TF SPD Infrastructure InnovationEducation IT НИЦ КИ BSU GSI NECSA ISMA NANU.

Slides:



Advertisements
Similar presentations
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
Advertisements

PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
Role of Big Science in the Developing World. Developed vs. Developing Developed have industrial growth enjoy a flourishing economy Developing depend on.
Accelerating Science and Innovation. Science for Peace CERN was founded in 1954 as a Science for Peace Initiative by 12 European States Member States:
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
Possibilities for further intensification of the JINR Educational Programme S.Pakuliak 110 th session of JINR Scientific Council September 15-16, 2011.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
Report from the Program Advisory Committee for Particle Physics to the JINR Scientific Council T. Hallman for J. Nassalski JINR Scientific Council Meeting.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Polarized deuterons and protons at NICA А.Коваленко NICA-SPIN_PRAGUE 2013 Charles University, Prague, July 7-12, 2013.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
Proton Driver Keith Gollwitzer May 31, Initial Design Overview For design purposes, the following is assumed –H - beam comes from PIP II and follow-on.
G.Trubnikov on behalf of JINR Directorate, Dubna NICA MAC, 19 Oct 2015 status and plans.
WelcomeWelcome CSEM – CERN Day 23 rd May 2013 CSEM – CERN Day 23 rd May 2013 to Accelerating Science and Innovation to Accelerating Science and Innovation.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
PHYSICAL PROJECT OF BOOSTER FOR NICA ACCELERATOR COMPLEX Alexey Tuzikov, Nikolay Agapov, Andrey Butenko, Alexey Eliseev, Viktor Karpinsky, Hamlet Khodzhibagiyan,
Technological, financial, managerial risks Some issues of: V. Kekelidze V.Kekelidze, MAC1.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
1 Historical overview Moscow Mechanical Institute was founded in The main purpose of foundation – training of researchers and engineers for USSR.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Introdcution to Workpackage/Activity Reflection D. Schulte.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
T. Fleck, GSI, Darmstadt, Germany ICALEPCS Status of the Control System for HICAT at an advanced stage of Commissioning Functions, Restrictions.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
1 Report of PAC for Particle Physics T. Hallman Presented by P. Spillantini JINR Scientific Council Meeting June 5-6, 2003 Dubna, Russia.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
1 1/15 Status of the Nuclotron-NICA G.Trubnikov MAC, June 7, 2011.
O. Kester, NuSTAR annual meeting, 27/02/2013
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Topic 1026: University-Type Education Process Report and Prolongation Proposals D.V. Fursaev UC Director Program Advisory Committee on Particle Physics,
Grid technologies for large-scale projects N. S. Astakhov, A. S. Baginyan, S. D. Belov, A. G. Dolbilov, A. O. Golunov, I. N. Gorbunov, N. I. Gromova, I.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Itzhak Tserruya Weizmann Institute of Science
Muon Ionisation Cooling Experiment Overview
Three stages of the NICA project: status and tasks
Innovation Development Strategy
ESS Innovation Procurement Workshop
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Development of modern education programs Project Report
Status of HESR 18th March Gießen Dieter Prasuhn.
A.Sidorin, on behalf of the team PP PAC, JINR, Dubna, 16 January 2017
Status of the Nuclotron-M project
Egle Tomasi-Gustafsson
(Procurement, testing of magnets)
JINR Experience in SC Magnets
Vadim Bednyakov Director of Dzhelepov’s Laboratory of Nuclear Problems
Ways to industry participation in CLIC 24th October, 2017
Large Booster and Collider Ring
Status of the beta-beam study
Veksler and Baldin Laboratory
ПОЛНОЕ НАЗВАНИЕ ПРОЕКТА
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
SOLID Collaboration Meeting
East Hall under construction
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

SC Magnets TF International Collaborations JINR Accelerators Detectors TF SPD Infrastructure InnovationEducation IT НИЦ КИ BSU GSI NECSA ISMA NANU Mega-science: NICA International Collaboration Germany BMBF Civil Russia Min E&S - funding States/ Agencies South Africa DST Belarus SC N&T Bulgaria BAN Ukraine NASU INRNE... РАН, ФАНО JINR China MOST ASIPP - financial/in-kind contribution India DAE

Extra-budget funding (megascience) is for: Infrastructure (social and offices: guest houses + multidisciplinary center on site LHEP, large computing center, dedicated area for applied research, additional cryogenics, …) Spin physics (SPD, spin dynamics) R&D for sc proton linac, detector R&D, others. Grant program for students and PhD, visits, NICA “advertisement” and popularization, …

Types of Risk 3 Estimate Uncertainty Technology Readiness Most other risks not easily addressed by R&D

Magnet system construction and mounting 40 dipole magnets, 24 quadrupole duplets, 24 dipole correctors and 8 multipole correctors Manufacturing rate of magnet yokes is 3 dipoles and 2 quadrupoles per months Finish of magnet yoke manufacturing is planning in middle of Manufacturing rate is 5 coils per month 6 magnets will tested per months 150 hours is required for testing of one magnet in cryogenic line. Three parallel cryogenic lines will used for testing of magnets. Finish of magnetic tests is June of 2017 Mounting of magnets and lenses in tunnel will be done during halve year in parallel by several teams. Critical point is realization of assembling and tests of magnets in accordance to schedule. BOOSTER Ion sources, Linacs Do not see any real serious problem. More less in accordance to schedule. Big delay (1 year) for HILAC – due to technological problems in Germany and Australia. Does not influence on the NICA collider commissioning. Ion Sources – OK, schedule agreed to developers and physicists. Additional personnel – needed: 2-3 engineers. Solving steadely with ITEP, MEPhI, …

Critical issues: -complicate technology of manufacturing of curved elliptic dipole vacuum chamber for ultrahigh vacuum conditions.; -Fast extraction from Booster (cold/warm? septum magnet) + cold beam channel from Booster to Nuclotron + injection to Nuclotron. It is solvable technically in principle, no showstoppers. But we have obvious delay (~1 year) with design and further prototyping for whole channel. Lambertson magnet – unique item, almost impossible ordering outside JINR; -Stripping target – design and simulation in very weak phase (have some concept and raw drawings). WD phase should be pushed and prototyping. Collimation in collider – hot task also. -Cryogenics: compressor hall (equipment is on board). Delay caused by problems with design and construction civil construction company (~1 year); Could be compensated. Does not influence to Booster commissioning directly. -Infrastructure/construction works for Booster (all systems: tunnel, e-cooling, main power converter, cryolines). Delay caused by slow design phase (special radiation safety regulations – requires more time than planned, more special efforts). Staging is organized and process is going; -Design phase for Collider RF2 and RF3 should be started a.s.a.p. Delay caused by funding lack. Now situation is better. We have to make fast solution to start; -To make choice for HV electron cooling system for collider – better a.s.a.p could be spent for concept and design (not much money, but moving ahead).

Beam dynamics: -It is time to create dedicated BD group/sector (5-7 persons) – “universal team” for simulations/programming/ training students. -Collider lattice optimization. Spin dynamics and “polarized” lattice. Chief Engineer (E.Syresin) – just started. Will have a lot of task. First one (highest priority) is Work Breakdown Structure and planning of the whole project (integration, dependencies, responsibilities). Second one (not less important) – documentation, radiation safety, planning of Nuclotron runs.

Personnel JINR establish a policy (strategy) for special rules of stimulation personnel. In 2016 increasing of salary fund will be 25% (5% - overall, 20% - for key staff (they are 60% of LHEP staff). Non-budgetary funds actively attracted since It helps to increase about 20-30%. For definite-period entertainment (SC magnet fabrica) – short- term contracts only. Market is open for whole town.

International Student Practice (ISP) In total 139 students from 9 JINR Member States have participated in three stages of ISP-2014 (129 last year): ARE-24, Belarus-8, Bulgaria-2, Czech Republic-23, Poland-22, Romania-13, Slovakia-9, South Africa-32, Serbia-5 By the beginning of 2014/2015 academic year 226 graduate students have taken part in various JINR educational programs. The JINR PhD program is currently being updated according to a new “Law on Education in RF” and according to the goals of the JINR seven-year plan. JINR Summer Student Program (SSP) In 2014 JINR UC has launched the Summer Student Program. The main distinction of SSP from ISP is a selection of participants on a competitive basis. In 2014 the SSP was organized in the field of accelerator physics and information technologies. 30 applications were received and 8 participants in SSP from ARE, Poland, Czech Republic and Russia were selected by VBLHEP and LIT. In 2015 SSP the scientific fields will be extended to include all JINR research areas.

The scientific-engineering group at the University Center was created to implement training programs for engineering physicists. Scientific-engineering group at UC New department “Development of the modern education programmes” was created at JINR University Center. One of the goals is a creation of the educational programs to include current scientific data into the educational process, conduct virtual and online laboratory research based on information and communication technologies

Particle Physics is GLOBAL !

Для свободных - все высоты достигаемы (M.Горький) For free individuals - all heights are attainable (M.Gorkiy)

Thank you very much !

…What NEXT ?... Merging 92+ U 235 beams E~ 0,6 GeV/u ~ 11 Tm ring Formation of SUPERHEAVY “ATOM” Experiments on the observation of spontaneous electron–positron pair creation in supercritical Coulomb fields (new 2 compact SC rings with merging bare Uranium beams)

…What NEXT ?... e- beam SC linac, 1 GeV, ~ 30m Target Mass-separator Radioactive ions Mass-spectroscopy of radioactive heavy ion beams in isochronous mode (using collider ring) + measurement of massive nuclei PDF with colliding electron beam (up to 1 GeV)

…What NEXT ?... Two collider rings SC magnets ~ 5 T; ~ 100 T  m E ~ 30 GeV (p) Intensity ~ 1e13 μ -target Goal: MW proton beam to the target, generating muon and neutrino fluxes SC proton-linac (~10MV/m) p