1 FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and Infrastructure.

Slides:



Advertisements
Similar presentations
1 Shrinking the Federal Footprint… Dispositions and Legislation Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and.
Advertisements

Sustainability (Green Building) Status and Reporting FIMS Real Estate Workshop June 2, 2009 Memphis, TN Thomas Traceski Director, Office of Environmental.
Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
Space Bank & Freeze the Footprint May 22, 2013 Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual Workshop.
Program Name or Ancillary Texteere.energy.gov June 16, 2011 Soudeh Motamedi IBM Contractor, DOE Sustainability Performance Office Year-End Sustainability.
Office of Management, Office of Engineering and Construction Management DATA ELEMENT UPDATE Gary R. Horn Facilities Engineer, LEED AP Office of Engineering.
2011 FIMS /Real Estate Workshop Las Vegas, NV June 14, 2011 Presented by: Michael Kohut, DOE Headquarters (EES) Gayle Smith, DOE Headquarters (EES)
June 16, 2011FIMS / Real Estate Workshop nd Annual FIMS / Real Estate Workshop.
Bridges & Culverts Usage Codes and Validation Annual FIMS Comprehensive Training March 27, 2014.
FIMS/Real Estate Workshop June 16, 2011 The IFI Crosscut and You How FIMS Data Supports the Budget Process Cindy Hunt, PE, LEED AP, CCE, CFM Office of.
1 FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and Infrastructure.
(Your hospital’s format/logo) Hospital X Strategic Energy Management Plan 20__ to 20__ Executive Summary NAME(S) Title(s)
UNDERSTANDING, PLANNING AND PREPARING FOR THE SCHOOL-WIDE EVALUATION TOOL (SET)
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
Trini Torres-Carrion. AGENDA Overview of ED 524B Resources Q&A.
Sometimes referred to as the “16 line statement” Requires greatest scrutiny Shows financial condition for an 18 month period Provides estimated levy &
Office of Acquisition and Property Management Completing an Effective Project Data Sheet (PDS)
April 1, Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. –Event number: –Event password: 2015B13 To hear.
Karen Herter (HMG) Mike Langley (DGS) April 15, 2008 Portfolio Manager for California State Buildings Meeting the Requirements of Executive Order S
Office of Acquisition and Property Management Guidance on Five-Year Plan Summary of Required Actions Attachment G.
Headquarters Perspective Carmelo Melendez May 2015.
Facilities Information Management System Data Validation Update for FY15 U.S. Department of Energy Argonne National Laboratory Annual FIMS Comprehensive.
FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual.
ANNUAL FIMS COMPREHENSIVE TRAINING Y- 12 NEW HOPE CENTER OAK RIDGE, TN MARCH 25, 2014 GAYLE SMITH Accomplishing FRPP Reporting and Improving Data Quality.
1 DOE Disposition Process… Shrinking the Federal Footprint… Monja Vadnais, PE, LEED AP, CFM & Ivan Graff, PE, LEED AP, CFM MA-50 - Facilities and Infrastructure.
2009 FIMS / RE Workshop DOE O 430.1B, Real Property Asset Management - Update Monja Vadnais, P.E. Facilities Engineer Office of Engineering and Construction.
National Laboratory Operations Board Infrastructure Assessment Subgroup Real Property Background Carmelo Melendez.
Facilities Information Management System (FIMS) Data Validation Inbrief program Facilities site name date.
Facilities Information Management System (FIMS) Data Validation Outbrief [Program] [Site] date.
Office of Management Office of Engineering and Construction Management 6/2/2009 Beyond the President’s Management Agenda & FRPC Update Gary R. Horn Facilities.
Laboratory Operations Board Enhancements Mark Gordy & Gayle Smith March 25, 2014 Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN.
2014 FIMS Annual Training Oak Ridge, TN March , 2014 Presented by: Michael Kohut, DOE Headquarters (GCI)
DOE ASSET MANAGEMENT PLAN
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
Proposed FIMS Data Elements for Removal FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 Mark Gordy Energy Enterprise Solutions.
1 FIMS Lease Management and More 2009 FIMS/Real Estate Workshop Memphis, TN June 3, 2009 Prepared by: Gayle Smith, Energy Enterprise Solutions.
FRPP Data Issues FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 Mark Gordy & Gayle Smith Energy Enterprise Solutions.
Annual FIMS Comprehensive Training Argonne National Laboratory May 6, 2015.
Office of Management Office of Engineering and Construction Management 6/2/2008 President’s Management Agenda & FRPC Update Gary R. Horn Facilities Engineer.
FIMS Standard Report Enhancements FIMS/Real Estate Workshop Palm Springs, CA June 2 – 6, 2008 Mike Kohut Gayle Smith FIMS Technical Support Presented.
STATE OF OUR FACILITIES REPORT bellwether of the asset management plan evolution of the three year rolling timeline Ivan Graff Office of Asset Management.
1 Department of Energy Excess Screening and Disposition Tracking Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and.
Mark Gordy Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014.
1 FIMS Data Validations And Lessons Learned Phil Dalby, P.E. Office of Engineering and Construction Management Facilities and Infrastructure Team FIMS.
ANNUAL FIMS COMPREHENSIVE TRAINING ARGONNE NATIONAL LABORATORY MAY 6, 2015 GAYLE SMITH Federal Real Property Profile Reporting.
1 Department of Energy Excess Screening and Disposition Tracking Phil Dalby, P.E. Office of Engineering and Construction Management Facilities and Infrastructure.
1 DOE Excess Elimination an Dispositions Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual Workshop.
FIMS Workshop June 2-6, 2008 Jolie Macier. A subcommittee of individuals comprised of Field Office users, including DOE contractor personnel, that recommend.
National Strategy for the Efficient Use of Real Property Fiscal Years I VAN G RAFF Lemont, IL May 6, 2015.
Measuring the Power of Learning.™ California Assessment of Student Performance and Progress (CAASPP) Accessibility and Accommodations December 16, 2015.
Mark Gordy, PMP Energy Enterprise Solutions, LLC 2013 Property Management Workshop May 22, 2013.
R ICHLAND O PERATIONS O FFICE Hanford Site 2008 FIMS/Real Estate Workshop.
REAL ESTATE DISPOSAL Federal Asset Sales Tom Geronikos, MAI Senior Realty Officer OECM, MA June 6, 2008.
NNSA Service Center Albuquerque, NM Field Office Status Report June 2008.
GAO and Inspector General Reports: A Review of Recent Audits Ivan Graff, P.E., CFM, PMP, CCP, LEED AP.
Laboratory Operations Board
Presentation for: 2011 FIMS/Real Estate Workshop Prepared by: Gayle Smith, DOE Headquarters (EES) Facilities Information Management System FY11 Year-End.
Presentation for: 2009 FIMS/Real Estate Workshop Prepared by: Mark Gordy, Headquarters (EES) Facilities Information Management System Data Quality and.
Freeze the Footprint Update March 25, 2014 Presented for Monja Vadnais Facilities & Infrastructure Division (MA-652) Office of Acquisition and Project.
1 Chicago Office. 2 FACILITIES INFORMATION MANAGEMENT SYSTEM (FIMS) & REAL ESTATE WORKSHOP FIMS POPULATION QUERY DEMONSTRATION June 2 – 6, 2008 Palm Springs,
May 7, 2015FIMS / Real Estate Training 2015 FIMS / Real Estate Training FY 2015.
Presentation for: 2009 FIMS/Real Estate Workshop Prepared by: Gayle Smith, Headquarters (EES) Facilities Information Management System Upcoming FIMS Enhancements.
FIMS Data Quality FIMS Annual Training May 10-12, 2016 Prepared by: Mark Gordy and Gayle Smith.
FIMS FY16 Year-End Schedule FIMS Annual Training May 10-12, 2016 PREPARED BY: GAYLE SMITH.
1 of 32 Performance Measures and the State of Our Facilities Eric Haukdal MA-50 Office of Asset Management.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
FIMS / CAIS HELPDESK SUPPORT FIMS ANNUAL TRAINING ORLANDO, FL MAY 10-12, 2016 Presented by: Gayle Smith.
FIMS Data Validation Update for FY16 FIMS Annual Comprehensive Training May 10 – 12, 2016 Presented by: Gayle Smith.
1 Getting to Green at the Department of Energy Progress on OMB’s Environmental Sustainability Scorecard Andy Lawrence Director, Office of Nuclear Safety,
What is the UL QFCP? FCIA Webinar Presenters:
Presentation transcript:

1 FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and Infrastructure Team FIMS Workshop 3 June 2009 Department of Energy

2 Agenda FIMS Status of FY 2009 Validations QA Assist visits Plan for FY 2010 validations Lessons learned Reminders Questions

3 FIMS Reliance on FIMS is increasing –Current user community consists of almost 500 people –The user base has increased by 40% over the last 5 years –We have seen an increased level of interest in FIMS training by management and facilities personnel in the field OMB's and GSA’s focus has shifted from data completeness to data quality/accuracy –This makes our data validation process all the more important –We are nearing completion of the third year of validations and have seen significant improvement –Good results with OSF’s –Most sites are now green on status for buildings and real property trailers Next year (FY 2010) we will combine Building, trailers and OSF’s Call the hotline!!

4 FIMS Validation Status 46 Sites to be validated 34 Validated Buildings and Trailers –28 Green/Green OSF’s –16 Green/Green LPSO is lead on multi-program sites –One scorecard per site Go’in for Green!

5

6

7

8 Quality Assurance Visits ~ Eight per year Try to get to each site every 4 to5 years Sites that score red visit more frequently –To provide assistance OECM/HQ Program Office do not run validation –Observe process –Provide QA –Provide assistance Answer questions We’re from Washington and we're here to help! FIMS

9 FY 2010 FIMS Validation Plan Validate buildings, trailers and OSF’s –One data pull –One Scorecard Validate Sustainable Building Data (buildings and trailers) –Existing Buildings Not Assessed Exempted from Assessment Not Worth Assessing Building Assessed –LEED Points –Guiding Principle Points - % Achieved –LEED Certification Level Attained

10 Validate Sustainable Building Data (buildings and trailers) –New Construction Certification Pending Certification Waived Failed to be Certified –Guiding Principle Points - % Achieved Certification Received –LEED Certification Received –Guiding Principle Points - % Achieved FY 2010 FIMS Validation Plan

11 Outgrant Indicator –Source documentation should list all properties and identify whether they are outgranted Yes or No –Real Estate should be the Subject Matter Expert (SME) for this data Excess Indicator –Source documentation from OECM indicating the asset has been screened and declared excess by DOE Estimated Disposition Year –Source documentation from site’s SME on dispositions indicating when asset is scheduled to be disposed FY 2010 FIMS Validation Plan

12 FY 2010 Validation Forms FIMS Data Validation Forms –Redesigned to include Sustainability data elements The combined random pull of Bldgs/Trailers and OSF's Thank you Mark, Gayle and Mike!

13 Lessons Learned Complete Source Documentation Worksheet –Streamlines process –Provides contact information to subject matter experts (SME) Develop source documentation notebook –Tab for each data element –Signed Memo, dated, clarifying process for obtaining source data by SME –Be prepared to go into detail on how you arrived at the values for the source data Develop Local Data Base For Source Data –Best Practice FIMS

14 Reminders DM Inspection Dates no more than 5 years old Source Data Updated Annually –Usage Code, Status, Outgrant Indicator, Excess Indicator, Using Organization, Utilization, RPV, DM, Mission Dependency, Annual Operating Costs, Annual Actual Maintenance and Sustainability Data

15 No source documentation for a data element, and it can’t be generated –Develop a table from data currently in FIMS Site’s Subject Matter Expert (SME) review the data Make needed corrections Sign and date the table indicating he/she certifies the data is accurate –One data element per table –Certified by only the SME, personally reviewed and certified the data as correct –This procedure can not be used for the following FRPC data elements: Size (Gross Sqft, Primary Qty, Secondary Qty), Net Usable Square Feet, Utilization, Replacement Plant Value, Deferred Maintenance, Annual Operating Costs and Annual Actual Maintenance –FIMS Coordinator should not be SME –Source documents must be signed prior to validation Reminders

16 We use the FIMS User Guide to crosswalk Usage Code and RPV Model to validate FIMS generated RPVs Don’t need to regenerate Source data each year for data elements that don’t change –Add yearly updates (DM, AM, AOC) –Only update process memos if process changes Reminders

17 Questions? Phil Dalby PE, LEED AP Department of Energy Office of Engineering and Construction Management (OECM) - MA-50 Phone: (202) Cell: (202) Fax: (202)