GLAST LAT ProjectMonthly Review, May 24, 2005 4.1.7 DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S 4.1.7.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
GLAST LAT ProjectSIU MRR DAQ & FSWV1 1 GLAST Large Area Telescope: G. Haller SLAC (650) Gamma-ray Large Area Space.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S September Status
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectOct DAQ & FSWV3 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Analysis of cPCI Backplane.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 2, Version 4 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, DAQ & FSWV8 1 GLAST Large Area Telescope: Gunther Haller SLAC LAT Chief Electronics.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST Large Area Telescope:
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project4.1.7 G. Haller V11 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectApril 2005 Project Status Overview May 24, April, 2005 Lowell Klaisner LAT Project Manager Rev. - LAT Project Status Overview Gamma-ray.
GLAST LAT Project Technical/Cost/Schedule Review 04/26/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V31 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
EPU load – same as SIU load except…
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S May Monthly Review Gunther Haller (650) Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 2 TEM/TPS Status & Schedule Status –Qual unit used for FM CAL testing was sent back to SLAC (to be discussed what do with it) –A & B at I&T on tower A and B –#1 & #2 delivered to I&T –#3: unit with bad Tem connector (is currently in TV) –#4: currently in TV, coming out Wednesday –#5: was delivered to SLAC last week, needs vib/TV/EMI –#6: expected to be delivered at SLAC today, needs vibTV/EMI –Next 2 sets expected in 2 weeks (cause is TPS pipe-line) –Rest of module: 2/week thereafter –Did find fix for low-level oscillations, exchange of one resistor, but not clear whether it is worth at this time to incorporate mods.

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 3 PDU Status and Schedule Schedule for 2 units –Proto-flight, pre-coat, arrived at SLAC 5/10 –Was schedule to go back 5/24, but is delayed a few days Power-outage (mainly software access and un-stable power) Box needed some machining to prevent a short of a node to ground –Testing at room-temperature ok, still needs testing over T before shipping it back to assembler for conformal coating –Deliver proto-flight to I&T 8/1 in present assembler schedule –2 nd unit lags by 6 weeks

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 4 GASU Status and Schedule Status –Surface-mount assembly complete –Is in flying-probe testing Schedule for 2 units (from assembler) –6/21: proto-flight unit assembled, pre-coat, ready for test at SLAC –6/28: ship to SLAC for environmental testing –9/3: deliver proto-flight unit to I&T –2 nd unit lags first by 6 weeks

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 5 SIU/EPU Status and Schedule Status –Backplane solder testing sample of new flight board (with reduced copper) was analyzed at GSFC Minor issues which are being addressed –Solder Sample of SIB was delivered to GSFC last Friday, is being analyzed –SIB/LCB/CPS/CBP board parts kits shipped Discovered that one part (UTMC LVDS receiver) was ordered short No impact to schedule since we are able to buy parts (assuming Po is placed in the next 2 days) Cost impact since those were not budgeted and have also higher screening level –Sib parts audited at assembler, engineering masters received, scheduled to go to surface mount assembly this week –Issue with SIB Austin EEPROM of the lot we are assembly this week No helium-tracer gas was put into re-sealed parts (not clear yet how many of our parts are affected) Chlorine traces detected in capacitor die attach (might only be for extended bake-out parts, under investigation) New lot to get additional parts beyond parts being loaded above )for different lot which was rejected) passed source-inspection, expected 3 rd week of June –Part kits of other parts are at assembler audit stage –All blank PC boards are a t assembler with exception of CPS (was received and is in coupon testing) Schedule –Boards for integration of first 5 crates should be at SLAC Aug 28 according to assembler schedule –1 week per crate for vib/TV/EMI thereafter

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 6 Harness & heater Contol Box Harness in assembly Received several types of cable assemblies, more coming in Heater Control box PCB’s received (are in coupon testing) Assembly contract requisition is in purchasing

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 7 EGSE

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 8 Thermo-testing support Status –Power protection unit for regulated and unregulated feeds in assembly (done by end of this week) –PDU/GASU/SIU ready to be mounted in rack –AC power distribution unit to be delivered to SLAC this week –Flight software changed code to provide hooks for LATTE4 Still needs to be more debugged –LATTE4/FSW code in progress (lost 3 days last week)

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 9 VSC Science Interface GPS receiver systran board (removed) SBC 1553 interface (removed) to GASU First VSC done –In use by FSW and I&T (Ric) Other 3 stations being put together (next 3 weeks)

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 10 Tech Issues Larger TPS ripple issue resolved, potentially have small ripple at certain loads/voltage settings (could also be removed with resistor change, to be decided) AUSTIN EEPROM DPA problems –New lot delivery date 6/16 (just passed CSI) these parts are needed to replace a rejected lot –New issue (GIDEP alert) on lot in hand, is being addressed Qualification of cCPI press-fit connector assembly using solder process –Looks promising Need to work on closing open FPGA review items

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 11 Level 3 Milestone Count

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 12 Level 3 Milestone List

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 13 Level 3 Milestone List

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 14 Level 3 Milestone List

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 15 Level 3 Milestone List

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 16 Milestone Variance Explanation PDU/GASU/SIU modules later than planned, assembly vendor started late Change plans to use proto-flight unit for I&T unless assembler can speed up work

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 17 Cost Report

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 18 Cost Variance Explanation In process of examining schedule/cost variances. Looks like schedule variance can be mitigated some, but needs more works

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 19 FTE Report (DOE/NASA-funded only)

GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 20 FTE Variance Explanation Ramped down some, but not fast enough. Need more (paid) labor than planned to watch thermal-vacuum chamber