L.Jirden + J.P. Vanuxem TB 15.11.051 VME crates in ALICE (reviewed) u Most detectors (16) need VME crates: u Total 62 crates; 52 for UX, 8 for CR, 2 for.

Slides:



Advertisements
Similar presentations
Futures Seller guarantees delivery of something at a set price for a fixed period of time (usually
Advertisements

CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Electronic Systems Support LV PS Procurement - Status February 28, 2005.
An introduction to ViXEN Remote Requisitions. Click to advance each slide.
C. Fernández Bedoya, A. Navarro, I. Redondo. C. Fernández Bedoya November 29th, Goal: Replace SC crate with simple CuOF electronics and place TSC.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
Niels Tuning (1/9) LV status. Outline 1)Preventive maintenance  Fan replacement 2)Power supplies:  Clogged cooling water circuit  Water damage 3)Next.
Connecting To A Remote Computer Via ‘Remote Desktop Web Connection’ Compatible With ‘Most Any’ Computer.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Recall: u target devices & possible solutions u Outstanding actions.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
Markus Joos, EP-ESS 1 “DAQ” at the El. Pool Aim and preconditions Hardware Operating system support Low level software Middle level software High level.
1 LV Power Supplies L.Jirden* u Detector solutions u Contracts u Tests u Outstanding issues *Presented by André Augustinus.
1 Low Voltage Power Supplies for ALICE ALICE week June 04 L.Jirden u Detector requirements u Target Devices u Procurement u Actions.
Electronic Systems Support CAN Branch PSU Designed: Bjorn Halgren PH-ESS Responsible:Paul Harwood.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
André Augustinus 13 June 2005 Control through serial links RS232 etc.
W-Ie-Ne-R Visit to Wiener 10 th February 2003 –Primary aim: to finalise acceptance of VME64x prototypes. –Additionally: To establish whether Wiener is.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Sophie BARON, PH-ESSLEADE - 07 Nov  TTC system status reminder  Upgrade principle  [Some] details about the infrastructure  Practical implementation.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Status of NA62 straw electronics Webs Covers Services Readout.
LEAF 03 March Optical Fibre Services for Experiments Luit Koert de Jonge/TS-EL-OF.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Target devices (reminder) u Market Survey and Tender u Actions.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
Electronic Systems Support EPTAB 7 Electronics Pool Status Report 6 December 2004 Chris Parkman Catherine Moine.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
1 Infrastructure and DCS Presentation of the Infrastructure Controls aspect in the ALICE DCS Based on U ser R equirements D ocument …you should still know.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
News on FTK rack infrastructure A. Lanza – INFN Pavia FTK Italy meeting –
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
16/05/03Climatic Chamber & Testbench - Sophie Baron 1 Climatic Chamber & Testbench.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
XBIS 219 Week 2 Checkpoint What type of information systems does CarMax use  Resource: CarMax Web site ( ​  What type of.
Cluster Status & Plans —— Gang Qin
Cabling for LHCb Upgrade
FTK infrastructure in USA15 Status and plans for 2015 A
T1 Electronic status Conclusions Electronics Cards:
TTC System Status May 2007 System overview Production Status
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Strategy for long-term support of the TTC system
SCT/Pixel Draft Rack Layout rcj
ATLAS USA15 - Rack 52U with 9U crates, remote PS
Track Finder Crate, Backplane and Parts
TileCal ROD Commissioning Counting Room Installation
إدارة التسويق.
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Testbeam status report

A Beam telescope for the EMC testbeam
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Presentation transcript:

L.Jirden + J.P. Vanuxem TB VME crates in ALICE (reviewed) u Most detectors (16) need VME crates: u Total 62 crates; 52 for UX, 8 for CR, 2 for lab u Most (34) still to be purchased, some (28) already exist u Purchase u Preferably via CERN service (PH/ESS), CERN contract with Wiener u Preferential price, on-site support, maintenance, standards u Order procedure and form on ESS web site: u u Orders collected and issued at fixed times (2 -3 times/year) u Deadline for deliveries in Feb. 2006:

L.Jirden + J.P. Vanuxem TB u ALICE standards u For UX u Type: 6U or 9U; local, water-cooled PS, no fan tray u Remote control connection: directly on PS u For CR u Type: 6U or 9U; local, air-cooled PS, with fan tray u Remote control connection: via fan-tray u For Lab u Type: 6U; local, air-cooled PS, with fan tray u Remote control connection: via fan-tray u Back-plane u If VME standard: VME64X u If custom: mechanical standards to be respected VME crates in ALICE (reviewed)

L.Jirden + J.P. Vanuxem TB