RiskyProject Enterprise Project Portfolio Risk Management Software Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1 (403)

Slides:



Advertisements
Similar presentations
RiskyProject Project Risk Management Software
Advertisements

Access 2007 ® Use Databases How can Microsoft Access 2007 help you structure your database?
Database management system (DBMS)  a DBMS allows users and other software to store and retrieve data in a structured way  controls the organization,
Intaver Institute Inc. Comparison of RiskyProject Professional vs Lite versions Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada.
Adaptive Management Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1(403) Fax: +1(403)
Intaver Institute Inc. 303, 6707, Elbow Drive S.W., Calgary AB Canada T2V 0E5 Quantitative Risk Analysis for Aerospace Industry.
Full Monte Cost and Schedule Risk Analysis
Project Perfect Pty Ltd Project Administrator Overview of Software.
هوش تجاری فرشاد آقابزرگی
Decision-Making In Project Management Introduction to project decision analysis Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada.
Unit 6 University of Sunderland COMM80 Risk Assessment of Systems Change Risk Assessment: the Generic Concept COMM80: Risk Assessment of Systems Change.
Project Risk Management
Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada
Monte Carlo Schedule Analysis The Concept, Benefits and Limitations Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1(403)
1 Chapter Overview Creating a User Database Setting Database Options Managing User Database Size Placing Database Files on Multiple Disks.
Decision-Making In Project Management Decision Framing Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1(403) Fax:
RISK MANAGEMENT PRESENTATION ASQ- GREATER HOUSTON SECTION 1405 Lila Carden, Ph.D., MBA, PMP University of Houston Instructional Associate Professor
1 Project Software. 2 Small Projects: Less than 50 Activities 1.POM-QM for Windows – Version 3 (Project Management Module) Pearson Publishing, (215) ,
Estimations In Project Management Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1(403) Fax: +1(403)
The AIE Monte Carlo Tool The AIE Monte Carlo tool is an Excel spreadsheet and a set of supporting macros. It is the main tool used in AIE analysis of a.
U-SAFE Insurance Company–Sale and Recordkeeping of Insurance Policies.
Plenary meeting 2015 – Chania - Crete CASCADE Data Services Yusuf Yigini, Panos Panagos, Martha B. Dunbar Joint Research Centre - European Commission.
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
“Convergence, Communication and Interactive Data” December 3-6, 2007 Vancouver, British Columbia, Canada.
What’s New in SEER-H 7.3 The Galorath Team. New Features Currency and Exchange Rate (with Multi-Currency option) Addin Enhancement Local Quantity, Schedule.
Software. Records Fields Each record is made up of fields – categories of information. The fields here are Name, Surname, Address, Telephone and Date.
Sampling Distributions. What is a sampling distribution? Grab a sample of size N Compute a statistic (mean, variance, etc.) Record it Do it again (until.
Monte Vista High School Science Survey JEOPARDY JEOPARDY click here to PLAY Created by Lynne M. Bailey. For educational use only. Credit appreciated.
AMERICA’S ARMY: THE STRENGTH OF THE NATION Mort Anvari 1 Cost Risk and Uncertainty Analysis MORS Special Meeting | September.
How to Perform Project Risk Management for Oil and Gas Projects
Risk Event Modeling Risk event modeling in part of Intaver Institute’s presentations on project risk management and risk analysis Intaver Institute Inc.
Outline of Chapter 9: Using Simulation to Solve Decision Problems Real world decisions are often too complex to be analyzed effectively using influence.
Calculating Project Schedule Risk Using Monte Carlo Simulation Curt Blair, PMP.
Lecture # 17 PRM 702 Project Risk Management Ghazala Amin
Access 2007 ® Use Databases How can Microsoft Access 2007 help you structure your database?
Question Four: Project Risk Management PMBOK definition of Project Risk Project risk management is the art and science of identifying, analyzing, and responding.
Quantitative Project Risk Analysis 1 Intaver Institute Inc. 303, 6707, Elbow Drive S.W., Calgary AB Canada T2V 0E5
Intaver Institute Inc. Project and Portfolio Risk Management with RiskyProject Enterprise Project and Portfolio Risk Management with RiskyProject Enterprise.
Engineering Systems Analysis for Design Richard de Neufville  Massachusetts Institute of Technology Use of Simulation Slide 1 of 17 Use of Simulation.
PROJECT in a box version 3.4 Project and Programme support as it should be.
© 2010 Megabyte Systems, Inc. All rights reserved. Setting up a new Document Type for Image Indexing Create a new directory Create a new directory.
Roll the Dice with Confidence: Play to Win By Bill Carswell Adjunct Professor Embry Riddle Aeronautical University.
Why Good Project Managers Make Bad Choices: An Introduction to Project Decision-Making Lev Virine, Ph.D. Intaver Institute Inc.
Use Cases & User Mocks Customer Call – Users and Objects.
Take Your Data Analysis and Reporting to the Next Level by Combining SAS Office Analytics, SAS Visual Analytics, and SAS Studio David Bailey Tim Beese.
Application Extension 10a
ECM based solution for Loan Origination / Micro Finance / Small Banks
Information Submitting System for City Members
Use Cases & User Mocks Customer Call –
Use Cases & User Mocks Customer Call –
RiskyProject Enterprise Project Portfolio Risk Management Software
Monte Carlo Schedule Analysis
Quantitative Risk Analysis for Aerospace Industry
Event Chain Methodology
What’s New in SEER-H The Galorath Team.
Quantitative Project Risk Analysis
RiskyProject 7 Project Risk Management Software Suite
Webinar: Risk Management for Oil and Gas Projects
Webinar: Risk Management for Oil and Gas Projects
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
ابزار مدیریت ریسک : Risky Project
RiskyProject New Features and Benefits
Risk Basics Definitions & Terms Industry Info Risk Mgt. Processes
Risk Event Modeling Intaver Institute Inc.
Risk Adjusted Project Schedules
Bibliography and reference manager programs, Endnote 2018 Attila Skulteti
Risk Analysis of Linear Project
Agile Project Management and Quantitative Risk Analysis
New Features RiskyProject 5 Intaver Institute Inc.
Program & Project Risks and Reporting with Oracle Primavera Cloud
Presentation transcript:

RiskyProject Enterprise Project Portfolio Risk Management Software Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1 (403) Fax: +1 (403)

What Is RiskyProject Enterprise? Project Scheduling Enterprise Risk Register Quantitative risk analysis using Monte Carlo simulations 2 RiskyProject Enterprise is Windows-based project risk management software. RiskyProject gives you a simple answer to a common question: What will happen to your project portfolio if certain risks occur?

RiskyProject Enterprise Database 2014 Intaver Institute 3 RiskyProject Enterprise saves the schedule and cost risk analysis data for all of your projects in database.

User Management 2014 Intaver Institute 4 RiskyProject has a complete user management system: Users Roles Project Permissions Logon History

Portfolio Gantt RiskyProject Enterprise allows you to create a Portfolio of your cost and schedule risk analysis 2014 Intaver Institute 5

Enterprise Risk Register 2014 Intaver Institute 6 Risk Register is shared with an organization

Risk Histrory Information 2014 Intaver Institute 7 Risk Histrory shows any changes in Risk Properties

Risk Reviews Version Intaver Institute 8 Risks can be regularly reviewed. Risk view information will be recorded. Schedule next risk review View all risk reviews

Documents Associated with Risk 2014 Intaver Institute 9 Any documents can be associated with a risk within a risk register.

Import existing Projects You can import: RiskyProject files Microsoft Project files (with built in Add-in) Primavera, Safran Other scheduling software 2014 Intaver Institute 10

Risked Projects View Risked Project views shows relative risk of projects Project risk is based on results of cost and schedule risk analysis 2014 Intaver Institute 11

Project Portfolio View Table of all results of Monte Carlo simulations for all projects in your Portfolio Data columns can be added or modified 2014 Intaver Institute 12

Main Project Information Simulation results for each project can be viewed instantly Detailed histograms and cumulative probability for all parameters 2014 Intaver Institute 13

Project Risk Scores and Rankings RiskyProject calculates three risk scores separately: Duration Cost Non-schedule risk categories 2014 Intaver Institute 14 Project risk scores are shown here

Risk Approval Process Risks can be restricted to at any level of the portfolio, including programs or single projects Only users with permissions to projects can see these risks Version Intaver Institute 15

Future Reading Lev Virine and Michael Trumper Project Decisions: The Art and Science Management Concepts, Vienna, VA, 2007 Lev Virine and Michael Trumper Project Think: Why Good Managers Make Poor Project Choices Gower, 2013