December 30, 2004HYPERION ERAU 1 Meeting Agenda February XX, 2004.

Slides:



Advertisements
Similar presentations
Module 10 Submit.
Advertisements

Configuration management
Software for Engineers EG1003: Introduction to Engineering and Design.
ProcessIt Document Library 8.0 Controlled Documents Suite.
FDA’s Proposed Rule under FSMA for Preventive Controls
DOCUMENT RETENTION/ DOCUMENT ARCHIVE PROCESS South Texas College.
GMP Document and Record Retention
Valerie O’Dell March 2012 Concur Expense Training Spac e for client logo (remove this box with or without logo)
February 1, 2005HYPERION ERAU 1 Thermal Analysis of a Radiation Shield for Antimatter Rocketry Concepts Jon Webb Embry Riddle Aeronautical University.
Reginald Lawrence Office of Systems Development
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
Production Planning Processes Theories & Concepts
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
TV Bands Database Administrators Meeting Implementation Update November 3, 2011 FCC Office of Engineering and Technology.
Environmental Satellite Product and Distribution System (ESPDS) GOES-R Access Subsystem (GAS) John Linn ESPDS System Engineering 7 October 2009.
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
Department of Comparative Literature The Honors Thesis Project.
STORET and the Water Quality Exchange Status Update Dwane Young OWOW/AWPD/MB April 26, 2007.
GLAST Large Area Telescope:
DEVELOPING WEB TRANSACTIONAL CAPABILITIES IN ATF ATF’s E Filing Strategies.
DMS Systems Design Review 3
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
Introduction to Transaction Processing and Documentation Techniques COPYRIGHT © 2007 Thomson South-Western, a part of The Thomson Corporation. Thomson,
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Spring, 2014.
World Wide Web Resources What Do the Experts Say About Web Pages? February, 2001.
© SAP AG Production Planning and Execution (PP) SAP University Alliances Version 2.1 Authors Bret Wagner Stefan Weidner Product SAP ERP 6.0 EhP4 Global.
Databases E. Leonardi, P. Valente. Conditions DB Conditions=Dynamic parameters non-event time-varying Conditions database (CondDB) General definition:
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
PearsonAccess April 14, PearsonAccess – Agenda Order Tracking Additional Orders Student Data Upload (SDU) files New Student Wizard Online Testing.
TRANSPORTATION POOLED FUND PROGRAM A Progress Report Lisa Williams, TPF Program Manager AASHTO RAC Meeting - 89 th TRB Annual Meeting January 10, 2010.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
How to update an abstract file And how to upload your final publication ready paper.
The CS Data Management and Tutor Monitoring system Xebiso Tshuma & Hope Mutete Supervisor: Mike Linck Date: 21 July.
U.S. Department of Agriculture eGovernment Program February 10, 2004 USDA Presidential Initiatives Working Group Meeting.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Configuration Management- Basic Concepts. Agenda  Configuration Management process Overview  Process Stages  Planning & Setup  Control  Audit  Case.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
THE IMPORTANCE OF SANITARY SURVEYS by Mary L. Howell, Backflow Management Inc.
The National Grants Partnership March 11, 2008 Michael Pellegrino
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
#WEEK 3: RELIABILITY-TEST DOCUMENTATION AND OTHER ITEMS NEEDED FOR RELIABILITY TESTING 2 August 2006.
1 Taking Notes. 2 STOP! Have I checked all your Source cards yet? Do they have a yellow highlighter mark on them? If not, you need to finish your Source.
October 12, 2012 RPG Planning Guide 5.3.2(2) Developer obligation to keep RARF data updated Cathey Carter Resource Integration.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Page ADP PearsonAccess Proctor Training. Page Agenda Test Overview Testing Components Proctor Roles and Responsibilities Overview Administering the Test.
CLIC activity of S. Iija Feb 20121S. Iija, BE-RF-PM EDMS MTF Administrative work.
Submit Module Objectives 2  In this module you will learn how to:  Assess readiness and determine who can submit proposals  Submit a proposal.
Training for School Test Coordinators (STC) Spring 2016 Tia Burnett, Supervisor of Testing February 8, 2016.
1 Our goals for today’s meeting  Confirm FNAL role –a complete review of all cryogenics and gas handling –  We would like an above ground review only.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Electronic – Statutory Financial Return (E-SFR) Timae Flood Bermuda Monetary Authority.
Before you begin The activities documented in this file should cover the previous 12 months. The Committee on Student Members reviews Applications three.
Laboratory 1: Software for Engineers
Software and Systems Integration
Data Management and Database Framework for the MICE Experiment
Introduction to Transaction Processing
IRPS 2018 Manuscript & Platform Presentation Submission Process
March 2018 Facility Planners Meeting
Software for Engineers
Software for Engineers
Beamed Core Antimatter Propulsion Experiment (BCAP)
Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear
E-Invoicing for Network Access Customers
Exchange of information with the WP.29 secretariat
Viernes, catorce de noviembre
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
MANUFACTURING DISASTER RECOVERY PLAN
Presentation transcript:

December 30, 2004HYPERION ERAU 1 Meeting Agenda February XX, 2004

December 30, 2004HYPERION ERAU 2 AGENDA White Paper Production System Test System Test Plan Systems Engineering Cost Analysis Questions and Additions

December 30, 2004HYPERION ERAU 3 THERMAL PAPER Were the evaporative cooling calculations I sent correct? Can evaporative cooling be included in the paper? What is the status of the paper? Will a copy be ready for submittal on Feb. 15 th ? Is a copy ready now?

December 30, 2004HYPERION ERAU 4 PERFORMANCE PAPER An abstract was not submitted in time for 05 JPC What was the status before work was stopped? Can we ready a version for 06 JPC?

December 30, 2004HYPERION ERAU 5 MONTE CARLO SIM. Do we have a 1, 10, 100, 1000, track run completed, realistic beams, inside/outside shield? Is there any graphical data to be documented yet? What were the effects to Isp, thrust, ect… Consider writing a short white paper for 06 JPC on Sim. (authors should only include those involved, i.e. Smith, Cox, Tiradoni) $Cost$

December 30, 2004HYPERION ERAU 6 TEST LOCATION Where will test occur? (ERAU PR, Lawrence Livermore, Las Alamos) When will the test occur? (rough date) These questions may be answered on a component level later in the meeting. $Cost$

December 30, 2004HYPERION ERAU 7 TEST STAND Is the Cavendish Balance Complete? Is the stand calibrated? Do we know how we are going to calibrate the stand? Document test stand and calibration technique Have we considered how we are going to interface the thruster/sphere to the stand? $Cost$

December 30, 2004HYPERION ERAU 8 VACUUM CHAMBER What pressure are we going to test at? Consider effects such as out-gassing, convection currents, ect… Will we use our own chamber or use another facility? Consider size of penning trap, test stand to fit inside, and power interface requirements $Cost$

December 30, 2004HYPERION ERAU 9 POSITRON STORAGE Will we use the Positronics LLC Penning Trap? Exactly how many e+’s does the trap store? Do we know the method of ejecting the e+’s from the trap? Does the discharge follow a linear or gaussian distribution? What are the power requirements? $Cost$

December 30, 2004HYPERION ERAU 10 DATA REDUCTION EQUIPMENT Has the methods of data reduction been considered? How much if any EMI shielding is needed for the electronics? $Cost$

December 30, 2004HYPERION ERAU 11 SYSTEM TEST PLAN We must start looking at integration of subsystems (power, data reduction equipment, test stand, thruster, ect…) We must get ready to start writing test procedures

December 30, 2004HYPERION ERAU 12 SYSTEMS ENGINEERING Start documenting all research and white papers. Document design and performance of test equipment (i.e. test stand) Update Master Schedule (ASAP) Update Contact Sheet (ASAP) Completion of web site

December 30, 2004HYPERION ERAU 13 COST ANALYSIS Compile receipts of past expenditures and organize into a running list Finish analysis of future costs for proposals $Cost$

December 30, 2004HYPERION ERAU 14 QUESTIONS or ADDITIONS ???