1 EIC Update R. D. McKeown Presentation to JSA Science Council January 7, 2011 (Thanks to R. Ent, A. Hutton, H. Montgomery, others)

Slides:



Advertisements
Similar presentations
Update from NSAC NuPECC Long Range Planning Meeting Susan J. Seestrom NSAC Chair U.S. Department of Energy Office of Science.
Advertisements

M. Sullivan Mini-workshop on the MEIC design Nov 2, 2012.
The Science of an EIC Nuclear Science Goals: How do we understand the visible matter in our universe in terms of the fundamental quarks and gluons of QCD?
The Electron Ion Collider Project: April 12, 2011 DIS2011, Newport News, VA Abhay Deshpande.
Working Group on e-p Physics A. Bruell, E. Sichtermann, W. Vogelsang, C. Weiss Antje Bruell, JLab EIC meeting, Hampton, May Goals of this parallel.
Output from this Series of Workshops: A science vision for the RHIC future 1.Provide a science case for the future RHIC program that makes clear its importance.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June JLAB Users Group Meeting.
Peter Paul 12/16/06e-A Collider concept1 Brief History of the e-A Collider Concept Peter Paul BNL/SBU.
Jefferson Lab Strategic Planning Divisional Town Meeting Mission Statement of your Division – What is or should be the mission statement of your division?
Charge for the MEIC Ion Complex Design Mini-Workshop Andrew Hutton Jan. 27 & 28, 2011.
1 January 10, 2011 Jefferson Lab Status Hugh Montgomery.
Future Opportunities at an Electron-Ion Collider Oleg Eyser Brookhaven National Laboratory.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
Thomas Jefferson National Accelerator Facility R.. McKeown Page 1 View from Lab Management R. McKeown DNP12 Satellite Meeting October 25, 2012.
Legend: 1 low-energy IP (s ~ 300) 2 medium-energy IPs (s < 3000) ELIC =high-energy (s = 20000?) (E p ~ 250 limited by JLab site) Use.
Ion Polarization Control in MEIC Rings Using Small Magnetic Fields Integrals. PSTP 13 V.S. Morozov et al., Ion Polarization Control in MEIC Rings Using.
Generic Detector R&D for an Electron Ion Collider RHIC & AGS Annual Users Meeting T. Ludlam, June 2011.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
BROOKHAVEN SCIENCE ASSOCIATES Peter Bond Deputy Director for Science and Technology October 29, 2005 New Frontiers at RHIC Workshop.
J EFFERSON L AB – A N I NTRODUCTION Hugh Montgomery; May 14, 2012.
POETIC 2012 Indiana University R. D. McKeown 12 GeV CEBAF.
Jefferson Lab Nuclear Science Program QCD Evolution May 26, 2015 R. D. McKeown.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
Jefferson Lab Status APEX Meeting April 22, 2014 R. D. McKeown Deputy Director For Science.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Thomas Jefferson National Accelerator Facility R. D. McKeown Slide 1 R. D. McKeown Jefferson Lab College of William and Mary The 12 GeV Science Program.
MEIC: A Medium Energy Electron Ion Collider at Jefferson Lab QCD and Hadron Physics, Lanzhou March 30, 2013 R. D. McKeown Jefferson Lab College of William.
1 EIC Update R. D. McKeown Presentation to EICAC April 10, 2011 (Thanks to R. Ent, A. Hutton, H. Montgomery, M. Farkhondeh, others)
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
MEIC: A Medium Energy Electron Ion Collider at Jefferson Lab Hadron Workshop, Huangshan July 2, 2013 R. D. McKeown Jefferson Lab College of William and.
General Discussion some general remarks some questions.
MEIC Detector Rolf Ent MEIC Accelerator Design Review September 15-16, 2010.
UMass Amherst Christine Aidala Jacksonville, FL Measuring the Gluon Helicity Distribution at a Polarized Electron-Proton Collider APS April Meeting 2007.
A feasibility study for measurements using electroweak probes at the proposed Electron-Ion Collider: Investigating nucleon structure and the fundamental.
Director’s Comments on the BNL Strategic Plan RHIC/AGS Users Meeting May 29, 2008 Steve Vigdor, filling in for Sam Aronson.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
Electron Ion Collider A. Accardi, R. Ent, V. Guzey, Tanja Horn, C. Hyde, A. Prokudin, P. Nadel-Turonski, C. Weiss, … + CASA/accelerator team LRP 2007 JLab.
Workshop on Women in Science and Engineering Latifa Elouadrhiri Jefferson Lab November 16, 2009.
EIC — Bring the Glue to Light. Gluons dominate QCD QCD is the fundamental theory that describes structure and interactions in nuclear matter. Without.
Nuclear Physics at Jefferson Lab Part III R. D. McKeown Jefferson Lab College of William and Mary Taiwan Summer School June 30, 2011.
Jefferson Lab Overview Bob McKeown April 20, 2015.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
R.G. Milner2nd EIC Workshop Summary and Outlook science case machine design EIC realization.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Anthony.
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
IR-Design 0.44 m Q5 D5 Q4 90 m 10 mrad m 3.67 mrad 60 m m 18.8 m 16.8 m 6.33 mrad 4 m Dipole © D.Trbojevic 30 GeV e GeV p.
JEFFERSON LAB CLOSE-OUT 6 GeV  Finish analysis on CLAS eg1-DVCS (SSAs + DSAs in   production with longitudinally polarized H and D targets) and.
Detector / Interaction Region Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski Joint CASA/Accelerator and Nuclear Physics MEIC/ELIC Meeting.
Relativistic Nuclear Collisions (RNC) Group Nuclear Science Division (NSD), Lawrence Berkeley National Lab Large Hadron Collider (LHC) Spin physics program.
Some thoughts to stimulate Discussion E.C. Stony Brook, January
Jefferson Lab Science Program R. D. McKeown Jefferson Lab Users Meeting June 3, 2014.
Transverse Spin Physics with an Electron Ion Collider Oleg Eyser 4 th International Workshop on Transverse Polarisation Phenomena in Hard Processes Chia,
Towards an Electron Ion Collider R. D. McKeown Jefferson Lab INT Workshop November 19, 2010.
EIC NAS review Charge-2 What are the capabilities of other facilities, existing and planned, domestic and abroad, to address the science opportunities.
Welcome Stuart Henderson May 22, 2017.
Explore the new QCD frontier: strong color fields in nuclei
Future lepton scattering facilities
EIC NAS review Charge-2 What are the capabilities of other facilities, existing and planned, domestic and abroad, to address the science opportunities.
Future upgrades of PHENIX
Introduction to Jefferson Lab
eRHIC with Self-Polarizing Electron Ring
Introduction and Workshop Charge
Workshops Overview/Goals
Accelerator and Interaction Region
SOLID Collaboration Meeting
JLEIC Collaboration meeting Spring 2016 Ion Polarization with Figure-8
Update on the JLEIC pCDR
Feedback from the Temple Town Meeting MEIC Accelerator R&D Meeting
Presentation transcript:

1 EIC Update R. D. McKeown Presentation to JSA Science Council January 7, 2011 (Thanks to R. Ent, A. Hutton, H. Montgomery, others)

Electron Ion Collider 2 NSAC 2007 Long-Range Plan: “An Electron-Ion Collider (EIC) with polarized beams has been embraced by the U.S. nuclear science community as embodying the vision for reaching the next QCD frontier. EIC would provide unique capabilities for the study of QCD well beyond those available at existing facilities worldwide and complementary to those planned for the next generation of accelerators in Europe and Asia.” EIC “collaboration” – Milner & Deshpande contact persons, involves BNL and Jlab communities JLAB and BNL are both developing “staged” designs EICAC advisory comm. → Mont & Vigdor(BNL AD)

EIC Physics Overview 3 12 GeV Hadrons in QCD are relativistic many-body systems, with a fluctuating number of elementary quark/gluon constituents and a very rich structure of the wave function. With 12 GeV we study mostly the valence quark component, which can be described with methods of nuclear physics (fixed number of particles). With an (M)EIC we enter the region where the many-body nature of hadrons, coupling to vacuum excitations, etc., become manifest and the theoretical methods are those of quantum field theory. An EIC aims to study the sea quarks, gluons, and scale (Q 2 ) dependence. mEIC EIC

MEIC : Medium Energy EIC Three compact rings: 3 to 11 GeV electron Up to 12 GeV/c proton (warm) Up to 60 GeV/c proton (cold) low-energy IP polarimetry medium-energy IPs Note: conservative assumptions 6T dipole fields Synch. Power < 20 kW/m  max < 2.5 km

Facilities embarking on long-term planning exercise, MEIC/ELIC is part of this. EIC Site Plan

6 BNL Design (2010) STAR ePHENIX 6 6 pass 2.5 GeV ERL Coherent e-cooler Beam-dump Polarized e-gun eRHIC detector RHIC: 325 GeV p or 130 GeV/u Au

Recent Events EICAC Report (Nov. 2009): - develop “unimpeachable” science case - Jlab concept less mature Jlab increases accelerator design effort to develop conservative “costable” MEIC design (2010) Jlab users organize workshops in spring 2010 EIC collaboration meeting at Catholic U. (July 2010) DOE-ONP awards accelerator R&D Accelerator division internal review of Jlab design 10 week program at Institute for Nuclear Theory – fall 2010 Vigdor proposes detector R&D (Next EICAC – April 2011)

8 JLAB EIC Workshops Nucleon spin and quark-gluon correlations: Transverse spin, quark and gluon orbital motion, semi-inclusive processes (Duke U., March 12-13, 2010 ) 3D mapping of the glue and sea quarks in the nucleon ( Rutgers U., March 14-15, 2010 ) 3D tomography of nuclei, quark/gluon propagation and the gluon/sea quark EMC effect (Argonne National Lab, April 7-9, 2010) Electroweak structure of the nucleon and tests of the Standard Model (College of W&M, May 17-18, 2010) EIC Detectors/Instrumentation (JLab, June 04-05, 2010) 4/5 will produce white paper for publication

9 General Emergent Theme Experimental study of multidimensional distribution functions that map out the quark/gluon properties of the nucleon, including: (quark) flavor spin and orbital angular momentum longitudinal momentum transverse momentum and position (Challenge to accelerator physics!)

MEIC & ELIC: Luminosity Vs. CM Energy e + p facilities e + A facilities For 1 km MEIC ring

solenoid electron FFQs 50 mrad 0 mrad ion dipole w/ detectors ions electrons IP ion FFQs 2+3 m 2 m Detect particles with angles below 0.5 o beyond ion FFQs and in arcs. detectors Detect particles with angles down to 0.5 o before ion FFQs. Need 1-2 Tm dipole. 4-5m Central detector EM Calorimeter Hadron Calorimeter Muon Detector EM Calorimeter Solenoid yoke + Muon Detector TOF HTCC RICH RICH or DIRC/LTCC Tracking 2m 3m 2m Solenoid yoke + Hadronic Calorimeter Very-forward detector Large dipole 20 meter from IP (to correct the 50 mr ion horizontal crossing angle) allows for very-small angle detection (<0.3 o ) Full Full Acceptance Detector 7 meters

Internal MEIC Review (hosted by Andrew Hutton) MEIC design review on 09/15 & 09/16 by two excellent (friendly) reviewers: Georg Hoffstaetter (Cornell) & Alex Chao (SLAC) 1)Very good that manpower involved in EIC has been increased, that outside experts from ANL and SLAC have been attracted for consultation, and that CASA has focused on this accelerator during recent months. 2)Hardly any technical R&D topics have been shown on the first day. The RF for BNL’s coherent electron cooling was the only R&D topic mentioned. 3)The figure 8 ion ring design appears very flexible and a strong feature of the JLAB EIC. 4)The amount of effort appropriate to compete in a down selection with BNL in 2013 is on the order of at least 10 FTE per year. This is already apparent from the fact that the design and R&D has to compete with significantly more than 10 FTE preparing the BNL EIC design. 5)The collaborations with BNL on the RF of a coherent electron cooler, with ANL on low energy ion acceleration, and with Novosibirsk on ion polarization are very useful. Additional collaborations for spin manipulation, e.g. with the COSY accelerator, could be quite effective, particularly if the figure 8 design could be tested experimentally in the long run.

MEIC Accelerator R&D Funded by DOE NP Program: DOE Financial Assistance Funding Opportunity Announcement LAB Research & Development for Next Generation Nuclear Physics Accelerator Facilities CASA proposal (submitted July 2010): Advanced Electron Ion Collider Design (PI: Geoffrey Krafft)(Funding request: $4,480k over three years) Award: total $900k for one year – $500k from FY2010 fund, available immediately (received Nov., 2010) – $400k from FY2011 fund, subjected to federal budget appropriation process Revised tasks that are consistent with the recommended funding level – Project 1. Collider Ring Designs – Project 2: Development of a Spin Manipulation and Stabilization System CASA plan for using this grant – Support three new postdoctoral fellows in CASA for MEIC studies ($100k x 3) – Support collaborations ($150k first year, $100k second year) (IR design: M. Sullivan, SLAC; Polarized beam: D. Barber, DESY, A. Kondratenko, Russia; RF system, B. Rimmer, JLab) – Support graduate students (TBD) Other awards for MEIC Accelerator R&D – Argonne National Lab, $270k, for MEIC ion linac & small booster design (PI: P. Ostroumov) – Northern Illinois Univ., $75k, for MEIC electron cooling studies (PI: B. Erdelyi)

14 weekdatestopics 113–17 Sept Workshop on "Perturbative and Non-Perturbative Aspects of QCD at Collider Energies" 220–24 Sept open conceptual issues: factorization and universality, spin and flavor structure, distributions and correlations 3–527 Sept –15 Oct small x, saturation, diffraction, nuclear effects; connections to p+A and A+A physics; fragmentation/hadronization in vacuum and in medium 6–718–29 Oct parton densities (unpolarized and polarized), fragmentation functions, electroweak physics 8–91–12 Nov longitudinal and transverse nucleon structure; spin and orbital effects (GPDs, TMDs, and all that) 1015–19 Nov Workshop on "The Science Case for an EIC" 2010 INT Workshop Organizers: Daniel Boer KVI, University of Groningen Markus Diehl DESY Richard Milner MIT Raju Venugopalan Brookhaven National Laboratory Werner Vogelsang University of Tübingen

EIC Realization Imagined Activity Name Gev Upgrade FRIB EIC Physics Case NSAC LRP EIC CD0 EIC Machine Design/R&D EIC CD1/Downsel EIC CD2/CD3 EIC Construction Note: 12 GeV LRP recommendation in 2002 – CD3 in 2008

Some Impressions from INT “Golden Topics” (my term) - Discover the collective effects of gluons in nuclei - Map the spin and spatial structure of quarks and gluons in nucleons possible golden expt.: low x g 1 (x) →  g(x) “Silver Topic” Understand the emergence of hadronic matter from quarks and gluons Electroweak topic still embryonic Much HW to do

A Final Word We are on a good path to put the EIC forward at the next NSAC Long Range Plan We still need additional work, building on the discussions at the INT program, to produce a much more compelling physics justification We need to sharpen the arguments for a more general audience How could we expand the community of interested physicists? We need to continue to work together to advance the physics case for this exciting new facility

Producing an EIC Science White Paper to Make the Case for Mission Need Defining Down-Select Criteria and Mechanism for Facility Design  Use INT Program, writeup as launching pad for White Paper putting flesh on above bones for non-expert audience  Aim for 1 st draft in Fall 2011, in anticipation of possible LRP Town Meetings in Fall 2012  Suggest JLab, BNL, EICC appoint ~6-member balanced Steering Committee to establish milestones and (calculation/ simulation/writing) assignments, oversee White Paper preparation, focus and editing  Define criteria and review mechanism (common reviewers for both designs) well in advance of LRP – ONP must be involved  Need “apples-to-apples” comparisons of performance vs. cost vs. timeline for both 1 st stages and (roughly) later upgrades  Both designs need to include defensible estimates of technical risk and risk mitigation strategies/costs for achieving goals  IR designs, detector integration, background environments need to be included in evaluations S. Vigdor (BNL) INT workshop

S. Vigdor (BNL)

20 Meet in conjunction with DIS2011 in April Increase accelerator physics membership? Possible charge: “Provide guidance on focusing the scientific case and priorities for the EIC.” EICAC

Jlab Position Jlab accelerator team is working effectively to develop a novel design. They have increased effort over the last year and are on track to deliver a costed design in fall Jlab users are interested and engaged but are conflicted with 12 GeV commitments. Jlab scientific effort is small relative to BNL (also 12 GeV commitments) BNL has invested LDRD…