ILIAS WG1 meeting Han/Ruthe Harald Lück ILIAS WG1 meeting, Sep. 2004, Hannover/Ruthe GEO Status (Update)

Slides:



Advertisements
Similar presentations
Stefan Hild for the GEO600 team October 2007 LSC-Virgo meeting Hannover Homodyne readout of an interferometer with Signal Recycling.
Advertisements

Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) HOMODYNE AND HETERODYNE READOUT OF A SIGNAL- RECYCLED GRAVITATIONAL WAVE DETECTOR.
Gravitational Wave Astronomy Dr. Giles Hammond Institute for Gravitational Research SUPA, University of Glasgow Universität Jena, August 2010.
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
The GEO 600 Detector Andreas Freise and the GEO 600 Team University of Hannover May 20, 2002.
Dual Recycling for GEO 600 Andreas Freise, Hartmut Grote Institut für Atom- und Molekülphysik Universität Hannover Max-Planck-Institut für Gravitationsphysik.
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
April 27th, 2006 Paola Puppo – INFN Roma ILIAS Cryogenic payloads and cooling systems (towards a third generation interferometer) part II: the Vibration.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
Optical simulation – March 04 1 Optical Simulation François BONDU VIRGO Tools Goals Example: tuning of modulation frequency A few questions.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Thermally Deformable Mirrors: a new Adaptive Optics scheme for Advanced Gravitational Wave Interferometers Marie Kasprzack Laboratoire de l’Accélérateur.
Stefan Hild For the GEO-team March 2008, ILIAS WG1, Pisa Projection of small angle scattering.
Towards dual recycling with the aid of time and frequency domain simulations M. Malec for the GEO 600 team Max-Planck-Institut für Gravitationsphysik Albert-Einstein-Institut.
GEO600 Harald Lück Ruthe, Worldwide Interferometer Network.
Stefan Hild 1ILIAS WG1 meeting, Cascina, November 2006 Comparison of tuned and detuned Signal-Recycling Stefan Hild for the GEO-team.
Stefan Hild 1Ilias WG1 meeting, Sep 2005, Perugia Title GEO 600 Commissioning progress Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut)
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
Interferometer Control Matt Evans …talk mostly taken from…
GEO‘s experience with Signal Recycling Harald Lück Perugia,
Advanced VIRGO WG1: Status VIRGO, Cascina Andreas Freise University of Birmingham.
1 Noise sources at high frequency in Virgo E. Tournefier (LAPP-CNRS) ILAS WG1 meeting, Hannover December 12 th,2005 Recycled ITF sensitivities Noise sources.
Gabriele Vajente ILIAS WG1 meeting - Perugia Couplings of angular noises into dark fringe Diffused light studies.
WG1, Hannover, Jan Commissioning progress at GEO600 Martin Hewitson for the GEO team.
GEO600 Detector Status Harald Lück Max-Planck Institut für Gravitationsphysik Institut für Atom- und Molekülphysik, Uni Hannover.
Electrostatic actuators: from the GEO experience to the 2 nd generation requirements Harald Lück Perugia,
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Harald Lückfor the GEO600 Comissioning team 1ILIAS Meeting, Palma, Oct Title GEO 600 Commissioning Status Based on a talk of Stefan Hild for the.
Pre-stabilized laser (PSL) for AdV Scope of the system Main tasks Requirements Reference solution and status of the design Plans towards completion Technical.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Status of GEO600 Benno Willke for the GEO600 team Aspen Meeting Aspen CO, January 2005 LIGO-G Z.
GEO600 Status Update Harald Lück Hannover, April 2005.
Preparing GEO600 for Gravitational Wave astronomy (A status report) Martin Hewitson, AEI Hannover for GEO600.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
Dual Recycling in GEO 600 H. Grote, A. Freise, M. Malec for the GEO600 team Institut für Atom- und Molekülphysik University of Hannover Max-Planck-Institut.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Stefan Hild 111th WG1 meeting, Hannover, January 2007 DC-Readout for GEO Stefan Hild for the GEO-team.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Joshua Smith July 2004 Identifying limiting noise sources of GEO600 ILIAS WG1 Meeting Joshua Smith for the GEO team.
Joshua Smith August Identifying and eliminating limiting noise sources of GEO600 LSC Meeting, Hanford WA, August `04 Joshua Smith for the GEO team.
GEO Status and Prospects Harald Lück ILIAS / ETmeeting Cascina November 2008.
Stefan Hild 1GWADW, Elba, May 2006 Experience with Signal- Recycling in GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
H1 Squeezing Experiment: the path to an Advanced Squeezer
Main Interferometer Subsystem
Demonstration of lock acquisition and optical response on
Outline ideas/status K.A. Strain
Progress toward squeeze injection in Enhanced LIGO
GW related research activities in Hannover UNI/AEI
Signal recycling R&D at LAL: Influence in Virgo
Thermal Compensation of the Radius of Curvature of GEO600 Mirrors
Homodyne readout of an interferometer with Signal Recycling
Installation of new MPR
Commissioning progress Stefan Hild Ilias WG1 meeting, Sep 2005
Measuring Gravitational Waves with GEO600
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
GEO HF Limits/Goals/Options…
Squeezed Light Techniques for Gravitational Wave Detection
Preparing GEO600 for Gravitational Wave astronomy (A status report)
Talk prepared by Stefan Hild AEI Hannover for the GEO-team
Homodyne detection: understanding the laser noise amplitude transfer function Jérôme Degallaix Ilias meeting – June 2007.
Presentation transcript:

ILIAS WG1 meeting Han/Ruthe Harald Lück ILIAS WG1 meeting, Sep. 2004, Hannover/Ruthe GEO Status (Update)

ILIAS WG1 meeting Han/Ruthe Installation Status 12W laser mode cleaner interferometer with dual recycling output mode cleaner detector attenuated to 2W MPR ~1% Transmissio n

ILIAS WG1 meeting Han/Ruthe Sensitivity changes between WG1 meetings

ILIAS WG1 meeting Han/Ruthe Changes since last meeting installation of suspended output optics HPD in separate vacuum vessel new sensor (HPD) for MI length control 2f local oscillator (optional) new gain distribution in MI length control

ILIAS WG1 meeting Han/Ruthe Output optics / vacuum tank high-power diode - TCOc Output MC not installed (yet?)

ILIAS WG1 meeting Han/Ruthe central building / control room W/O output optics Stomp in Ctrl. room

ILIAS WG1 meeting Han/Ruthe Noise Projections: the analytical way

ILIAS WG1 meeting Han/Ruthe Changing MID loop electronics

ILIAS WG1 meeting Han/Ruthe Changing SR loop – UG ~35Hz

ILIAS WG1 meeting Han/Ruthe ‘2f LO’ for MID Demodulation

ILIAS WG1 meeting Han/Ruthe Laser amplitude noise & stab. Red = Inner and outer loop running Blue = only inner loop running Green = both loops off

ILIAS WG1 meeting Han/Ruthe Variation of SR Modulation Index

ILIAS WG1 meeting Han/Ruthe Effect of changing the heater power

ILIAS WG1 meeting Han/Ruthe ROC- Correction of MFe 71W Optimal Compensation Contrast enhanced

ILIAS WG1 meeting Han/Ruthe Sensitivity for changing ROC of MFE

ILIAS WG1 meeting Han/Ruthe GEO600 next steps repairing leak in central building Set up new office container improve sensitivity towards S4 increase injected power increase power recycling factor lock acquisition might cause problems simulations and testing needed, maybe OMC required

ILIAS WG1 meeting Han/Ruthe construction work

ILIAS WG1 meeting Han/Ruthe Central Building new office container 6 desks, common area toillets

ILIAS WG1 meeting Han/Ruthe GEO600 next steps repairing leak in central building (almost done) Set up new office container improve sensitivity towards S4 increase injected power implement segmented heater increase power recycling factor (300 -> 2000) lock acquisition might cause problems simulations and testing needed, maybe OMC required