Www.eu-etics.org INFSOM-RI-026753 WP5: Dissemination, Training, Certification Study and Web Interface Status Report ETICS All-Hands – 21 November 2007.

Slides:



Advertisements
Similar presentations
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Advertisements

SC7 WG6 Rome Engineering Ingegneria Informatica S.p.A. INFSO-RI Isabel Matranga ETICS Automated Building,Testing and Quality Assurance.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Enabling, facilitating and delivering quality training in the UK and Internationally The challenge of grid training and education David Fergusson, Deputy.
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
INFSOM-RI Performing tests using several machines: Coscheduling ETICS Project, CERN.
08/11/908 WP2 e-NMR Grid deployment and operations Technical Review in Brussels, 8 th of December 2008 Marco Verlato.
ALICE Electronic Logbook MEST-CT Vasco Barroso PH/AID.
EMI INFSO-RI EMI SA2 Report Quality Assurance Alberto Aimar (CERN) SA2 WP Leader.
SCI-BS is supported by the FP7 Capacities Programme under contract nr RI Build and Test Portal SCI-BUS - agINFRA OSD Eva Takacs 4D Soft Kft. Budapest,
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
INFSO-RI Module 01 ETICS Overview Alberto Di Meglio.
INFSO-RI NA2 Status Update ETICS2 second AHM Isabel Matranga Engineering Ingegneria Informatica SpA Darmstadt, February 2009.
Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium.
LCG Generator, October 16 th 2003 Introduction to the October LCG Generator meeting Paolo Bartalini CERN.
EGEE-II INFSO-RI Enabling Grids for E-sciencE 3 rd All-Activity Meeting Introduction and NA1 status Bob Jones – Project Director,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE – paving the way for a sustainable infrastructure.
INFSOM-RI Testing and the OMII-Europe Project ETICS All Hands Meeting – may 2007 Carlos Aguado Sánchez Tomasz Kokoszka CERN.
INFSOM-RI WP 5 – Dissemination, training, certification and web tools Marc-Elian Bégin WP5 Leader, CERN ETICS 2 nd EU Review (CERN)
INFSOM-RI Alberto Di Meglio CERN ETICS 2 nd EC Review (CERN) 15 February 2008 WP1 Administrative and Technical Management.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America EELA Infrastructure (WP2) Roberto Barbera.
BalticGrid-II Project The Second BalticGrid-II All-Hands Meeting, Riga, May, Joint Research Activity Enhanced Application Services on Sustainable.
INFSO-RI Module 05 The ETICS Plugins and Compliance Analysis Alberto Di Meglio.
Conference name Company name INFSOM-RI Speaker name The ETICS Job management architecture EGEE ‘08 Istanbul, September 25 th 2008 Valerio Venturi.
INFSOM-RI Elisabetta Ronchieri INFN CNAF ETICS 2 nd EU Review (CERN) 15 February 2008 WP3 - Software Configuration Tools and Methodologies.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
INFSOM-RI WP NA2 Dissemination, Training and Certification Isabel Matranga Engineering Ingegneria Informatica S.p.A. ETICS 2 Kick.
INFSOM-RI ETICS: E-infrastructure for Testing, Integration and Configuration of Software Alberto Di Meglio Project Manager.
INFSOM-RI WP 5 – Dissemination, training, certification and web tools Marc-Elian Bégin WP5 Leader, CERN ETICS 2 nd EU Review (CERN)
EMI INFSO-RI EMI Roadmap to Standardization and DCI Collaborations Alberto Di Meglio (CERN) Project Director.
VO DCA WP5 EuroVO-DCA Review, 10 January 2007 Giuliano Taffoni & Fabio Pasian - INAF EuroVO DCA WP5 Coordination with Computational Grid Projects G. Taffoni.
INFSOM-RI SA1 Planning Alberto Aimar CERN – ETICS2 SA1 2.
INFSOM-RI Project Status Update for All-Hands Meeting Alberto Di Meglio Project Manager.
G.Govi CERN/IT-DB 1 September 26, 2003 POOL Integration, Testing and Release Procedure Integration  Packages structure  External dependencies  Configuration.
INFSOM-RI Project Overview Alberto Di Meglio Project Manager 2.
CERN Alberto Di Meglio Darmstadt, February 2009 Project Status Update ETICS 2 All-Hands Meeting.
INFSOM-RI Alberto Di Meglio, Project Director, CERN ETICS Final EU Review CERN, Geneva - 15 February 2008 Project Report.
EMI is partially funded by the European Commission under Grant Agreement RI NA2 : Outreach and Training Emidio Giorgio, INFN NA2 Leader 2 nd EMI.
European Middleware Initiative (EMI) Alberto Di Meglio (CERN) Project Director.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
INFSOM-RI WP1: Administrative and Technical Management Alberto Di Meglio Project Manager.
INFSO-RI NA2 ETICS2 first Review Isabel Matranga Engineering Ingegneria Informatica SpA Bruxelles, 3 April 2009 Dissemination, Training and Certification.
INFSOM-RI WP3 Software Configuration Tools and Methodologies Elisabetta Ronchieri (INFN CNAF) ETICS Final Review (CERN) 15 February.
INFSOM-RI ETICS: E-infrastructure for Testing, Integration and Configuration of Software Alberto Di Meglio Project Manager.
Enabling Grids for E-sciencE EGEE-III-INFSO-RI EGEE and gLite are registered trademarks Francesco Giacomini JRA1 Activity Leader.
INFSOM-RI ETICS and EGEE Testing Alberto Di Meglio.
INFSOM-RI WP2: Infrastructure and Service Management Status Report ETICS All-Hands – 29 May 2006 Peter F. Couvares ETICS WP2 Leader.
Pedro Andrade > IT-GD > D4Science Pedro Andrade CERN European Organization for Nuclear Research GD Group Meeting 27 October 2007 CERN (Switzerland)
INFSOM-RI The ETICS Service Configuration, Building and Testing Elisabetta Ronchieri, ETICS Project, INFN CNAF.
Promoting and Standardizing Grid Computing Grid and Distributed Software Certification and Quality Assurance GGF17 Certification BoF Marc-Elian Bégin CERN.
WP5 – Infrastructure Operations Test and Production Infrastructures StratusLab kick-off meeting June 2010, Orsay, France GRNET.
INFSOM-RI Project Status Update Alberto Di Meglio Project Manager.
ETICS, EU-OMII and the Software Repository Andrea Caltroni, INFN Padova ETICS 1 st All-Hands Meeting, Budapest - May 29-31, 2006.
INFSOM-RI Elisabetta Ronchieri INFN CNAF ETICS 2 nd EU Review (CERN) 15 February 2008 WP3 - Software Configuration Tools and Methodologies.
INFSOM-RI WP3: WP3: Software configuration tools and methodologies Status Report ETICS All-Hands – 23 May 2007 E. Ronchieri.
NA2 Status Update ETICS2 first AHM Isabel Matranga
EO Applications Parallel Session
E-Infrastructure for Testing, Integration and Configuration of Software Alberto Di Meglio CERN, INFN, Engineering, 4D Soft, University of Wisconsin.
Marc-Elian Bégin ETICS Project, CERN
Release BETA Integration Tool Status Geneva – 1 March 2007
ETICS Pool for IPv6 tests
ETICS 2 All-Hands Meeting
StratusLab Project Status
Elisabetta Ronchieri WP3
WP5: Dissemination, studies, web portal and tools
ETICS Services Management
WP5 Dissemination, training, certification and web tools
Presentation transcript:

INFSOM-RI WP5: Dissemination, Training, Certification Study and Web Interface Status Report ETICS All-Hands – 21 November 2007 Marc-Elian Bégin

INFSOM-RI ETICS 4th All-Hands Meeting - CERN, Switzerland /11/2007 Staffing and Resources CERN:CERN: –Lorenzo Dini –Tomasz Kokoszka (OMII-Europe) –Me Engineering:Engineering: –Paolo Fabriani –Adriano Rippa –Alberto Conte 2

INFSOM-RI ETICS 4th All-Hands Meeting - CERN, Switzerland /11/2007 Deliverables Status 3 deliverables are due this month and next3 deliverables are due this month and next D5.7 - Quality Certification Feasibility Study and Sustainability Strategy: end of October (PM22) – under PMB reviewD5.7 - Quality Certification Feasibility Study and Sustainability Strategy: end of October (PM22) – under PMB review D5.8: end of October (PM22) – expected to be submitted to the PMB this weekD5.8: end of October (PM22) – expected to be submitted to the PMB this week D5.9: end of November (PM23) – under developmentD5.9: end of November (PM23) – under development 3

INFSOM-RI ETICS 4th All-Hands Meeting - CERN, Switzerland /11/2007 Major Tasks Performed ETICS release 2.0 will contain a number of major addition and upgrades from WP5ETICS release 2.0 will contain a number of major addition and upgrades from WP5 –Portal: brings together all web clients under the same hood to harmonise the user’s experience – See Tomek’s presentation –MyETICS: new default panel bringing a localised view to ETICS – See Tomek’s presentation –Repository: N-tier architecture repository laying the foundations for artefact (packages, built and test reports and metrics) management – using high density technological pack!! – See Lorenzo’s presentation –Build and Test Web Application: completely new layout, taking into account numerous feedback from current users –Metrics Trend Analysis Disseminator Maintenance of already deployed applications, including limited developmentMaintenance of already deployed applications, including limited development –Build and Test Web Application –Administration 4

INFSOM-RI ETICS 4th All-Hands Meeting - CERN, Switzerland /11/2007 Major Tasks Performed (2) Certification Study:Certification Study: –Definition of the Grid Quality Certification Model (GQCM) –See dedicated presentation from Adriano –Presentation of model at EGEE’07, and OGF21 as part of the Build, Test and Certification Community Group 5

INFSOM-RI ETICS 4th All-Hands Meeting - CERN, Switzerland /11/2007 Major Tasks Performed (3) Dissemination events (see details on web site)Dissemination events (see details on web site) –BELIEF-EELA e-Infrastructures Conference, Rio de Janeiro, Brazil (thanks Guillermo and Adriano) – June 2007 –First ETICS User Workshop, CERN – 28 June 2007 –5 th International Summer School on Grid Computing, Mariefred, Sweden (thanks Alberto Di Meglio) – 8-20 July 2007 –CHEP: Victoria (thanks Elisabetta) – 2-7 September 2007 –EGEE’07: Budapest – 1-5 October 2007 –Booth –Quality Assurance Workshop (in collaboration with EGEE) –OGF21: Seattle – October 2007 Training eventsTraining events –OMII-Europe: CERN (thanks Tomasz) – September 2007 –ETICS workshop (for EGEE SA3/JRA1): CERN – October

INFSOM-RI ETICS 4th All-Hands Meeting - CERN, Switzerland /11/2007 TODO? Co-schedulingCo-scheduling –How do we expose what features to the user via B & T web clients –How do we handle multi-node test results in the repository –See dedicated session

INFSOM-RI ETICS 4th All-Hands Meeting - CERN, Switzerland /11/2007 Issues GQCM: do we demo it? If yes, how? Do we have the plugins? What are the candidates?GQCM: do we demo it? If yes, how? Do we have the plugins? What are the candidates? D5.9: Plan for using and disseminating KnowledgeD5.9: Plan for using and disseminating Knowledge – –Is our current plan good enough? – –What are the expectations for the final version? 8

INFSOM-RI ETICS 4th All-Hands Meeting - CERN, Switzerland /11/2007 Workplan for the next quarter Support release of ETICS 1.3Support release of ETICS 1.3 Complete D5.9Complete D5.9 Support demoSupport demo Gather usage and dissemination metricsGather usage and dissemination metrics Contribute to D1.3Contribute to D1.3 Support final reviewSupport final review Any further development?Any further development? 9

INFSOM-RI ETICS 4th All-Hands Meeting - CERN, Switzerland /11/2007 Conclusion ETICS continued to have a strong presence in Grid and EGEE related arenas (CHEP 2007, EGEE’07, OGF21)ETICS continued to have a strong presence in Grid and EGEE related arenas (CHEP 2007, EGEE’07, OGF21) Able to deliver training with more efficiency and less preparationAble to deliver training with more efficiency and less preparation Good reception of GQCM at a number of events (what’s next?  EGEE (Dec) and QUALIPSO (Jan) )Good reception of GQCM at a number of events (what’s next?  EGEE (Dec) and QUALIPSO (Jan) ) Integrated all Web Applications under a unique portal, a major milestone!Integrated all Web Applications under a unique portal, a major milestone! Delivered first version of the Repository system, another major milestone!Delivered first version of the Repository system, another major milestone! 10