November 07, 2006 Global Design Effort 1 Beam Delivery System / Machine Detector Interface BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Question from the GDE : Could local “doughnut” type muon spoilers like those in SLC be substituted for the 5 meter magnetized wall? 5m magnetized wall.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
January 11, 2007 Global Design Effort 1 Beam Delivery System / Machine Detector Interface BDS Area leaders Deepa Angal-Kalinin, Andrei Seryi, Hitoshi Yamamoto.
Global Design Effort Beam Delivery System & Machine Detector Interface Andrei Seryi, SLAC Annual DOE HEP Program Review June 11-14, 2007.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
8-Nov-06 GDE Valencia Global Design Effort 1 MDI Related Potential Design Changes Barry Barish Caltech / GDE 8-Nov-06.
11-Nov-06 ILCSC - Valencia Global Design Effort 1 GDE Report and Discussion of Costs Barry Barish Caltech / GDE 6-Nov-06.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
CF Constraints to the Strawman BDIR Configuration Tom Markiewicz SLAC 07 January 2005 IR Hall Muon Wall Beam Dump Detector Photon Dump 4m tunnel with “Y”
NLC - The Next Linear Collider Project Backgrounds Update Tom Markiewicz SLAC LCWS Cornell 15 July 2003.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
Beam Delivery, MDI related updates Andrei Seryi for BDS Area GDE/LCWS meeting at Bangalore March 10, 2006.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
ILC Beam Delivery System Layout and Lattice Design Deepa Angal-Kalinin ASTeC, Cockcroft Institute Cockcroft Institute SAC th November 2006.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
ILC MDI Andrei Seryi JAI with input from many colleagues working on MDI IWLC
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
September 20, 2006 Global Design Effort 1 Process of change of BDS baseline to 14/14 configuration BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto,
Thanks to Andrei for slides October 26, 一般報告 Hitoshi Yamamoto, Oct 26, 2006.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
Photon collider: ILC configuration and IR issues ( how to make 14mr compatible with gamma-gamma) Valery Telnov Budker INP IRENG07, Sept.18, 2007, SLAC.
Oct. 6, Summary of the Polarisation Session J. Clarke, G. Moortgat-Pick, S. Riemann 10 November 2006, ECFA Workshop, Valencia.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
Philip Burrows SiD Meeting, SLAC 27/10/06 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Status of GDE BDS Design Talk based on several talks presented by BDS area leaders Andrei Seryi, Hitoshi Yamamoto, Deepa Angal-Kalinin at and after Vancouver.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
CLIC Civil Engineering Update
Beam Delivery update Andrei Seryi December 12, 2005
CLIC-ILC BDS & MDI work.
AD & I : BDS Lattice Design Changes
Beam Delivery System Schedule at ILC2010
Extract from today’s talk given to DCB
Presentation transcript:

November 07, 2006 Global Design Effort 1 Beam Delivery System / Machine Detector Interface BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE meeting, November 6-10, 2006

November 07, 06 Global Design Effort BDS: 2 Vancouver to Valencia Configuration change control requests after Vancouver –Baseline configuration to 14/14, single collider hall –5m muon walls instead of 9+18m –On surface detector assembly Evaluations by WWS, MDI panels & CCB Further cost optimizations –Shorter BDS and shorter extraction lines –Single IR – evaluation of push-pull

November 07, 06 Global Design Effort BDS: 3 Vancouver baseline Two IRs with 20mrad and 2mrad crossing angle Two collider halls separated longitudinally by 138m 20mr IR 2mr IR FF E-collim.  -collim. Diagnostics BSY tune-up dump grid is 100m*5m

November 07, 06 Global Design Effort BDS: 4 Vancouver cost Cost drivers –CF&S –Magnet system –Vacuum system –Installation –Dumps & Collimators Total Cost Additional costs for IR20 and IR2

November 07, 06 Global Design Effort BDS: 5 CCR to 14/14 from 2/20 (1) After the first cost estimates and performance evaluations, it was decided to cut the Gordian knot of the cost, technical and non-technical issues and propose to change the baseline to two IR with 14/14 configuration. CCR submitted on 28 th July. Reasons to change –To reduce the cost Large cost saving from 2 mrad extraction line magnets Common collider hall –To improve the performance Improved radiation conditions in the extraction lines Better performance of downstream diagnostics Easier design and operation of extraction optics and magnets Reduced back scattering from extraction line elements and possibly better overall background Impact on physics reach minor

November 07, 06 Global Design Effort BDS: 6 CCR to 14/14 from 2/20(2) Design & cost of 14/14 with common collider hall & z=0 –Design of 14mr beamline is almost the same as for 20mrad –In the 14/14 cost estimation, the following adjustments were estimated and taken into account: removed stretches in optics shorter (~11mr/14mr) tapered tunnels remove one surface building savings due to common hall (but volume still twice the single volume) add cost of 42% more gradient bends (for 14mrad bend), their PS, BPMs, movers, etc The cost reduction in this configuration is ~16% The CCR was discussed in MDI meeting on August 15 th. Conclusions send to WWS and CCB. WWS commented on the CCR. CCB considered the CCR for 14/14, and on September 8 th issued a recommendation for EC to adopt the CCR. The EC approved it on 21 st September.

November 07, 06 Global Design Effort BDS: 7 From minutes of MDI panel (abridged quote) The (physics) mode most affected by crossing angle is the slepton pair production where the slepton-LSP  m is small. The main background is 2-  processes and an efficient low-angle electron tag by BEAMCAL is needed to veto them. For a large crossing angle (14 or 20mrad), anti-DID is needed to collimate the pair background along the outgoing beam. For 14mrad crossing with anti-DID, the … background is expected to be comparable to the 2mrad case while the signal efficiency reduces by about 30% to 40%. This is mainly due to the 2nd hole of BEAMCAL that is needed for the large crossing angle which will force additional cuts to remove the 2-photon and other backgrounds. This is not based on a complete analysis but on a study of the pair background distribution on the BEAMCAL: that for 20mrad crossing with anti-DID was found to be essentially the same as the 2mrad case. A complete analysis is needed for 14mrad with anti-DID, also covering different values of the mass difference (namely, for different SUSY parameter space). Backgrounds considered here is mainly the pair background and a lesser extent Bhabha events. More studies are sorely needed in this area. With this limited information, the MDI panel thinks that the 14mrad is acceptable as the baseline at this time. However, we would like to stress that the 2mrad crossing angle is clearly desirable than larger crossing angles for the slepton search, and R&Ds related to 2mrad should be encouraged.

November 07, 06 Global Design Effort BDS: 8 Muon walls Baseline configuration: 18m and 9m walls in each beamline Scheme of a muon wall installed in a tunnel widening which provides passage around the wall Purpose: –Personnel Protection: Limit dose rates in one IR when beam sent to other IR or to the tune-up beam dump –Physics: Reduce the muon background in the detectors

November 07, 06 Global Design Effort BDS: 9 Muon walls CCR Reduction of 18m muon spoilers to 5m and elimination of 9m muon spoilers – CCR submitted 8 th September Considered that –The estimation of 0.1% beam halo population is conservative and such high amount is not supported by any simulations –The minimum muon wall required for personnel protection is 5m –Detector can tolerate higher muon flux –Cost of long muon spoilers is substantial, dominated by material cost and thus approximately proportional to the muon wall length The caverns will be built for full length walls, allowing upgrade if higher muons flux would be measured MDI panel accepted this change CCB approved this request on 23 rd September; contingent upon continuation of detailed detector studies to ensure that the occupancy due to muons does not affect the high precision physics measurements

November 07, 06 Global Design Effort BDS: 10 Alternatives for Muon walls L. Keller, N. Mokhov, N. Nakao, S.Striganov Could local “doughnut” type muon spoilers like those in SLC be substituted for the 5 m magnetized wall? Compared to a 5m magnetized wall, a series of eleven, four meter long, 1.4 m diameter magnetic spoilers will reduce the number of muons/bunch in a 6.5 m radius detector but will increase the number of muons/bunch in a 2.0m radius TPC. Other approach - to replace copper collimators and absorbers to carbon ones. Muons background reduces about 23 times –magnetized wall or doughnuts may not be required! Detector tolerances and cost implications need to be studied in details.

November 07, 06 Global Design Effort BDS: 11 Beam Delivery System layout for new baseline IP2 IP1 10m 1km beam dump service hall alcoves 9m shaft for BDS access polarimeter laser borehole muon wall tunnel widening

November 07, 06 Global Design Effort BDS: 12 CFS designs for two IRs Valencia Vancouver

November 07, 06 Global Design Effort BDS: 13 beam dump service hall alcoves 9m shaft for BDS access & service hall beam dump and its shield muon wall tunnel widening Beam Delivery System tunnels

November 07, 06 Global Design Effort BDS: 14 CMS assembly approach Assembled on the surface in parallel with underground work Allows pre-commissioning before lowering Lowering using dedicated heavy lifting equipment Potential for big time saving Reduces size of required underground hall On-surface assembly : CMS approach

November 07, 06 Global Design Effort BDS: 15 On-surface assembly CCR(1) Change request to specify on-surface detector assembly procedure for ILC detectors submitted on 21 st September –The present BCD does not explicitly specify the method of underground assembly. It is implicitly assumed that the detectors are assembled underground. –Vancouver WBS considered the underground halls sized at 32m (W) x 72m (L) each to allow underground assembly of the largest considered detector. According to tentative CF&S schedule worked out by M. Gastal, CERN, the detector hall is ready for detector assembly after 4y11m after project start –If so, cannot fit into the goal of “7years until first beam” and “8years until physics run”

November 07, 06 Global Design Effort BDS: 16 On-surface assembly CCR(2) Surface assembly allows to save years and allows to fit into this goal –The collider hall size may be smaller (~40-50%) in this case –A building on surface is needed, but savings may be still substantial Discussing possible variations : –pure CMS assembly (config B) –modified CMS assembly (config A) Assemble smaller (than CMS) pieces on surface, lower down and perform final assembly underground May affect schedule (?), but preliminary looks by a small bit less expensive than “B” The change request not intended to specify all the details for the schedule, hall sizes, capacity of cranes etc. –Such optimisation is being done in details by BDS, CF&S and Detector concept groups. CCB approved this CCR on 2 nd November.

November 07, 06 Global Design Effort BDS: 17 Table of IR assumptions continued at next page=>

November 07, 06 Global Design Effort BDS: 18

November 07, 06 Global Design Effort BDS: 19 CERN LHC-ILC engineering forum Participation by MDI members (Oct. 12,13) Tour of ATLAS, CMS and ALICE Presentations on: –Radiation protection issues –CMS services –ATLAS installation –CMS installation + infrastructure –ILC MDI :present status and understanding – H. Yamamoto and A. Seryi –Assembly and installation of an ILC detector – N. Meyners Extremely useful information from CERN colleagues based on real experience.

November 07, 06 Global Design Effort BDS: 20 Cost of new baseline Cost of 14/14 mrad configuration is being updated after all these changes The costs will be updated for two IR case (14/14) and single IR case with push-pull

November 07, 06 Global Design Effort BDS: 21 Further work baseline cost Optimizing the IR hall requirement and detector assembly procedure –considering pure-CMS and modified CMS approach Optimizing CF&S design Working on installation model and refining the cost Reviewing systems for possible cost reductions Discussing other possible cost saving strategies

November 07, 06 Global Design Effort BDS: 22 Single IR questions (1) GDE suggested evaluation of push-pull at the end of September. Questions to be evaluated –Organisational and historical questions –Accelerator design questions –Detector design questions –Engineering integration questions Detailed list of questions to be studied developed: Technical evaluation of push-pull option started by an extended task force, which include detector and accelerator experts in ILC community and beyond.

November 07, 06 Global Design Effort BDS: 23 Single IR questions (2) Detector task force phone meetings –Oct 24: –Nov 2 : Accelerator design meetings –Several : So far discussed mostly the accelerator design and detector integration questions Preliminary conclusions from detector concept groups; detailed studies and engineering design are needed. BDIR/GDE/WWS/MDI session – Wed, 8 th Sep –Report from the Push-Pull Study Group – A. Seryi on behalf of extended task force. –Followed by discussion on Push/Pull issues 8 th Nov GDE, Main MDI issues – B. Barish, General issues

November 07, 06 Global Design Effort BDS: 24 M. Woodley IR 14 mrad 14 mrad ILC FF9 hybrid (x 2) 14 mrad (L* = 5.5 m) dump lines e-e+ hybrid “BSY” (x 2) 2226 m ΔZ ~ -650 m w.r.t. ILC2006c Upgrade to 1 TeV CM involves adding magnets only … no geometry changes Total BDS Z-length is 4452 m (2 IRs:5100m) Removed dedicated energy error dianostics (MPS) and replaced with polarimeter chicane (some issues) Single IR BDS Hybrid configuration

November 07, 06 Global Design Effort BDS: 25 QFSM1 moves ~0.5 m polarimeter chicane septa fast kickers “Type B” (×4) M. Woodley Single IR BDS Hybrid configuration

November 07, 06 Global Design Effort BDS: 26 Detector design and radiation safety properties If the detector electronics or services, or the off- beamline detector need to be accessed during run, the detector need to be self-shielded, or a shielding wall should be used Preliminary study indicates that some of detectors considered for ILC can be made self-shielded even for pessimistic assumption of full beam loss (18MW) There is significant concern that safety rules may become tighter in time, and that larger gaps (for cables, etc.) would be needed in detector Assume the design with shielding wall, while considering self-shielding as possible improvement

November 07, 06 Global Design Effort BDS: 27 Shielding wall Recent studies show that if detector does not provide any shielding, a 3m concrete wall is needed If partial shielding is provided by detector, the wall may be thinner The wall does not have to be full height A curtain wall (movable on crane rails) may or may not be needed to block the gap above the wall

November 07, 06 Global Design Effort BDS: 28 If detector does not provide any radiation protection: For 36MW maximum credible incident, the concrete wall at 10m from beamline should be ~3.1m Wall 18MW loss on Cu target 9r.l \at s=-8m. No Pacman, no detector. Concrete wall at 10m. Dose rate in mrem/hr. 25 rem/hr 10m Alberto Fasso et al

November 07, 06 Global Design Effort BDS: 29 IR hall with shielding wall No shield around beam With shield around beam May need additional curtain wall on top of main wall. May need shaft cover. Do not need full height wall. The height could be decrease from what shown.

November 07, 06 Global Design Effort BDS: 30 BDS Test facilities : update Moving ESA program to the SABER is being investigated –It is essential to have a high energy test facility continuing past 2008, with similar capabilities as ESA ATF2 and ESA (to possibly be replaced by SABER) facilities complement each other and cover most of the needs of BDS Other test facilities being discussed : –tests of crab cavities at the new facility at Fermilab –integrated IR probably to be developed at BNL

November 07, 06 Global Design Effort BDS: 31 Crab cavity tests (FNAL, CI and BDS area leaders) Location of take- off beamline is being finalized FNAL Tests of crab cavities at the new facility at Fermilab

November 07, 06 Global Design Effort BDS: 32 Summary Several configuration changes since Vancouver –3 Change requests to Vancouver baseline, all approved by CCB and accepted by WWS and MDI panel Cost reduction strategies continuing Detailed evaluation of on-surface assembly for each detector concept Evaluation of single IR, push-pull detectors, parameter space –Detailed discussion sessions with GDE, MDI and WWS at this workshop Final configuration for the RDR to be finalised at this workshop