1 The Manager, the Project Organisation Structure, and the Team.
Chapter 4 Project Organization1 Ch 4 Project Organization “Organize - to form into an association for a common purpose or arrange systematically”
Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, 2007 Project Management.
Project Management: A Managerial Approach
The Manager, the Organization, and the Team
Project Management: A Managerial Approach
Projects in organizations organization Structures.
IS 371 Week 3 Agenda: • Administrative things • Homework #1 due now
Ch 4 Project Organization
Project Management: A Managerial Approach
Chapter3 Project Manager1 Ch 3 The Project Manager “Project Managers are special people who will ensure project success”
Project Management in Practice Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
Organization Structure & Culture
GROUP DYNAMICS AND TEAM DEVELOPMENT Radu RĂDUCAN.
Chapter 13 Types of Project Organizations. 222 Learning Objectives The characteristics of the three types of organization structures: - functional - project.
The Project in the Organizational Structure
Organization: Structure and Culture CHAPTER THREE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Transforming Lives. Inventing the Future. IEL L IN O I S TU IN S T I T OFTECHNOLOGY 8/31/04 Lecture 3 - Organizational Structure and Culture1.
2-1 The Manager, the Organization, and the Team. Outline: 2-2  Selecting the project manager  Roles / responsibilities of a project manager  Project.
Four Drivers of Project Management Growth Speed to market Complexity and uniqueness of new inventions Disturbances/expansions of the enterprise Accountability.
Chapter 4 Organizing Projects.
The Manager, the Organizer and the Team  Selecting the project manager  Roles / responsibilities of a project manager  Project management.
Project Organization.
Management organization
The Effective Project Manager Chapter 2 Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Pesewa Presentations. Why do we need to organise international marketing activities? The way in which an organisation is structured helps determine: –
Project Management Part 2 Project Managers
THE MANAGERIAL PROCESS PowerPoint Presentation by Charlie Cook The University of West Alabama Clifford F. Gray Eric W. Larson Organization: Structure and.
Copyright 2012 John Wiley & Sons, Inc. Chapter 5 The Project in the Organizational Structure.
INDE 6332 ENGINEERING PROJECT MANAGEMENT CHAPTER 3 Part 2 University of Houston Dept. of Industrial Engineering Houston, TX (713)
1 © The Delos Partnership 2004 Project Management Organisation and Structure.
Building an information organization/staff - 6 Barbie E. Keiser University of Vilnius May 2007.
SECTION 1 THE PROJECT MANAGEMENT FRAMEWORK
1 CHAPTER 14 ORGANIZATIONAL STRUCTURE. 2 LEARNING OBJECTIVES Define organizational structure and explain how it corresponds to division of labour. Discuss.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 3 – The Project Manager.
Chapter 3 The Project Manager © 2012 John Wiley & Sons Inc.
4-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e C HAPTER 4 Project Organisational.
Copyright 2012 John Wiley & Sons, Inc. Chapter 5 The Project in the Organizational Structure.
Management organization/ organization structure Three basic organizational structures Functional Project Matrix.
The Manager, the Organization, and the Team
Copyright 2007 John Wiley & Sons, Inc.2-1 Chapter 2 The Manager, the Organization, and the Team.
Copyright 2012 John Wiley & Sons, Inc. Chapter 3 The Project Manager.
Fundamentals of Organization Structure
Copyright 2009 John Wiley & Sons, Inc. Chapter 3 The Project Manager.
Organizational Design, Diagnosis, and Development Session 8 Team-Based Designs.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.2-1.
Chapter 2: The Manager, the Organization, and the Team 1 Project Management in Practice Prepared by Scott M. Shafer Wake Forest University Mantel, Meredith,
Copyright 2012 John Wiley & Sons, Inc. Chapter 3 The Project Manager.
MultiMedia by Stephen M. Peters© 2002 South-Western Organizational Design.
Lim Sei cK.  Team ◦ A group whose members work intensely with each other to achieve a specific, common goal or objective. ◦ All teams are groups.
Systems Analyst (Module V) Ashima Wadhwa. The Systems Analyst - A Key Resource Many organizations consider information systems and computer applications.
Project Management “Project Organization” Lecture 6 Resource Person: M. Adeel Anjum.
Chapter Two Project Organization.
Negotiation and Conflict Resolution (Part II) Chapter 6.
The Human Side of Project Management
Chapter 4 Organizing Projects.
Project Management BBA & MBA
Where We Are Now. Where We Are Now Project Management Structures Challenges to Organizing Projects The uniqueness and short duration of projects relative.
Project Management -- Organization
The Project in the Organizational Structure
Project Managers and Organization
Chapter 3 The Project Manager © 2012 John Wiley & Sons Inc.
Project Management Structures
Chapter 3 The Project Manager © 2012 John Wiley & Sons Inc.
The Project in the Organizational Structure
Project Managers and Organization
Where We Are Now. Where We Are Now Project Management Structures Challenges to Organizing Projects The uniqueness and short duration of projects relative.
The Project in the Organizational Structure
Presentation transcript:

2-1 The Manager, the Organization, and the Team

2-2 THE PM’S ROLES

2-3 Facilitator 4 Manager-As-Supervisor Versus Manager- As-Facilitator 4 Systems Approach Versus Analytical Approach –suboptimization 4 Must ensure project team members have appropriate knowledge and resources 4 Micromanagement

2-4 Communicator Figure 2-1 Communication Paths Between a Project’s Parties-At-Interest

2-5 Virtual Project Manager 4 Geographically Dispersed Projects 4 Communication Via – –Web –telephone –video conferencing 4 “Never let the boss be surprised!”

2-6 THE PM’S RESPONSIBILITIES TO THE PROJECT

2-7 Three Overriding Responsibilities 4 Acquiring Resources –getting necessary quantity and quality can be key challenge –“irrational optimism” 4 Fighting Fires and Obstacles 4 Leadership and Making Trade-Offs

2-8 Negotiation, Conflict Resolution, and Persuasion 4 Necessary to meet three overriding responsibilities

2-9 SELECTION OF A PROJECT MANAGER

2-10 Key Criteria 4 Credibility - The PM is believable –technical credibility –administrative credibility 4 Sensitivity - Politically Astute and Aware of Interpersonal Conflict 4 Leadership, Style, Ethics - Ability to Direct Project in Ethical Manner

2-11 FITTING PROJECTS IN THE PARENT ORGANIZATION

2-12 More on “Why Projects?” 4 Emphasis on Time-to-Market 4 Need for Specialized Knowledge from a Variety of Areas 4 Explosive Rate of Technological Change 4 Accountability and Control

2-13 Project Organization Continuum Functional Org. Functional Matrix Balanced Project Matrix Project Org. Functional Mgrs. have most if not all authority Project Mgrs. have most if not all authority

2-14 Figure 2-2 The Pure Project Organization

2-15 The Pure Project Organization 4 Advantages –Effective and efficient for large projects –Resources available as needed –Broad range of specialists –short lines of communication 4 Drawbacks –Expensive for small projects –Specialists may have limited technological depth –May require high levels of duplication for certain specialties

2-16 Figure 2-3 Functional Project Organization

2-17 Functional Project Organization 4 Advantages –technological depth –Fractional resource issue is minimized 4 Drawbacks –lines of communication outside functional department slow –technological breadth –project rarely given high priority

2-18 Figure 2-4 Matrix Project Organization

2-19 Matrix Project Organization 4 Advantages –flexibility in way it can interface with parent organization –strong focus on the project itself –contact with functional groups minimizes projectitis –ability to manage fundamental trade-offs across several projects 4 Drawbacks –violation of the Unity of Command principle –complexity of managing full set of projects –conflict

2-20 Figure 2-5 Mixed Project Organization

2-21 THE PROJECT TEAM

2-22 Characteristics of Effective Project Team Members 4 Technically Competent 4 Politically Sensitive 4 Problem Orientation 4 Goal Orientation 4 High Self-Esteem