2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue.

Slides:



Advertisements
Similar presentations
Project Manager P. Paolucci deputy/deputy Run Coordinator G. Pugliese deputy Run Coordinator G. Pugliese deputy DPG D. Piccolo K. Bunkowski DPG D. Piccolo.
Advertisements

Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
RPC M&OB status Pigi Paolucci. Summary 2010 Cash Contributions foreseen CHF 2010 Expenditures (2009 carry over) CHF Present Income Balance.
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
CSC Online and Offline DQA Status Ken Johns, Venkat Kaushik, Xiaowen Lei (U. Arizona)
RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli.
OHT 14.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software quality infrastructure components The need for procedures and.
Data Quality Monitoring for CMS RPC A. Cimmino, D. Lomidze P. Noli, M. Maggi, P. Paolucci.
MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Introduction & News SCT Weekly during ID Week Dave Robinson Cambridge University.
MuonDPG/RPC M. Maggi INFN Bari. DQM tool for the DCS data Control Analysis Tool (CAT) by Cimmino, Lomidze, Paolucci, Polese To 1.Make custom DCS data.
A. Cimmino - P. Paolucci - G. Polese / DCS meeting DQM tool for the DCS data What the RPC community needs: 1.Make online/offline DCS data.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
RPC Readiness for Data-taking RPC Collaboration 1.
Offline Tracker DQM Shift Tutorial. 29/19/20152 Tracker Shifts Overview Online Shifts at P5 (3/day for 24 hours coverage) – One Pixel shifter and one.
RPC project status report RPC IB meeting 29 march 2011 Pigi Paolucci.
1 Status Report RPC Diagnostic with DT Segment Extrapolation Camilo Carrillo CERN Departamento de Física UNIVERSIDAD DE LOS ANDES Bogotá, Colombia.
CAF shifts and procedures Marcello, Raffaello, Alberto, Pigi, Sungeun, David, Silvia, Anna & all the 2009 shifters.
1 st RPC General Meeting 29 March 2011 Pigi Paolucci RPC project status.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
DQM status report Y. Foka (GSI) Offline week from pp to PbPb.
Trigger Offline Expert Report Simon George (RHUL), Ricardo Gonçalo (RHUL) Trigger General Meeting – 25 th November 2009.
Analysis trains – Status & experience from operation Mihaela Gheata.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
Muon Shift Organization Outline Class 1 Atlas Control Room Shifts Booking Present Status + Experience+ Feedback Class 2 reminder A. Polini & Z. Yan May.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
February 07, 2002 Online Monitoring Meeting Detector Examines Should aid in: 1.Diagnosing problems early and getting it fixed 2.Making decisions on the.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
4 st RPC General Meeting 28 June 2011 Pigi Paolucci RPC project status.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
HI July Exercise and Muon DQM preparation Mihee Jo Mihee Jo / Lab meeting.
CSC Shifter Training Course – Global Running Fred Borcherding Reach from CSCOperations Twiki page or directly:
Commissioning and run coordination CMS week Commissioning plenary 28-February 2007 DQM and monitoring workshop MandateGoals.
ID Week 13 th of October 2014 Per Johansson Sheffield University.
1 Outline First look at the 2007 data with the offline reconstruction (~1000evts) : –Clusters. –Reconstructed Space points. FastOffline plots: –2 differents.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
Silvia Costantini RPC General Meeting CMS week 15 June 2010.
Central DQM Shift Tutorial Online/Offline
P. Paolucci G. Pugliese M.Tytgat
RPC Data Certification
DPG Activities DPG Session, ALICE Monthly Mini Week
Calibration Status of the art – the first tTrig calculated from data
Offline shifter training tutorial
Pixel DQM Status & Plans
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
Data Quality Monitoring of the CMS Silicon Strip Tracker Detector
Central DQM Shift Tutorial Online/Offline
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
CMS Pixel Data Quality Monitoring
DQM for the RPC subdetector
CMS Pixel Data Quality Monitoring
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Presentation transcript:

2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue – Mandate: run “quality/validation” by hands and fast feedback to P5 made by shifters+shift leader using “instructions” PA, DQM online/offline and Noise DCS offline ? Configuration ? Masked strips ? “basic” analysis to produce plots and result – Good results but: tools and instructions were still under development, too many tools to use and not many experts in shift 1Pigi Paolucci2/3/10

2009 RPC CAF organization For the 2010 manpower I would like to simplify the present schema and maximize the CAF efficiency and results CAF DQM Anna DQM Anna PA ? PA ? Noise Silvia Noise Silvia WBM Raffaello WBM Raffaello Reco Camilo Reco Camilo Shifter Analysis Salvatore Orso Haiyun Georgi Go ………… Analysis Salvatore Orso Haiyun Georgi Go ………… 2Pigi Paolucci2/3/10

2010 CAF proposal Mandate: run “quality/validation” and fast feedback to P5 Improve Run Quality certification: – Merging tools (DQM and PA) and include more from Reco if we need – Stable procedure for the noise and DCS info ! Have more expert at CAF (training) Do we need shifter ? In the more wide sense 3Pigi Paolucci2/3/10

2010 CAF organization Merging Phase: – Prompt Analysis in DQM (David was supposed to include the output list) – DCS/XDAQ (ORCOF data) in DQM (Anna + ?) – ORCOF data production (?) – WBM: Raffaello 4Pigi Paolucci2/3/10 Run quality (Anna, Camillo, David, Silvia) CAF DQM PA ? PA ? Noise Silvia Noise Silvia WBM Raffaello WBM Raffaello Reco Expert Analysis DPG Analysis DPG