CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group1 CLIC-ILC Collaboration - #2 Cost and Schedule working group John Carwardine, Katy Foraz,

Slides:



Advertisements
Similar presentations
CLIC CDR Schedules & Value Estimates Philippe Lebrun on behalf of the CLIC Cost & Schedule WG LCWS 12 University of Texas at Arlington, USA 22 – 26 October.
Advertisements

1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
What is Business Analysis Planning & Monitoring?
Report from ILC GlobalGroup 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara · GDE December 8, 2005.
SS28: Cooperative Systems II: Bits, Bytes, and Brakes Mike Schagrin US Department of Transportation ITS Joint Program Office International Harmonization.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 1 ILC Cost Management J. Carwardine, T. Himel, F. Lehner,T. Shidara, L. Hagge, P. Garbincius,
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
CLIC-ILC Cost & Schedule Working Group Meeting TILC09 – Sunday, April 19, 2009 reported by Peter H. Garbincius CLIC_ILC_phg_21april09.ppt.
CLIC-ILC Cost & Schedule Agenda – 8feb08 John Carwardine = secretary & rapporteur this file: & Schedule Sub-Group.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
Agenda : CLIC Civil Engineering and Services (CES) WG.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
TOF Preliminary Design and Safety Review Project Management Controls R. L. Brown.
CLIC Cost at 3 TeV and 500 GeV CDC meeting, Hans-H. Braun for CLIC cost & Schedule WG Mick Draper, Katy Foraz, Claude Hauviller, Bernard Jeanneret,John.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
1 Global Design Effort John Carwardine: [date] Cost Estimate data management John Carwardine Feb 8, 2008.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #13.
Update on cost-related issues Philippe Lebrun Joint CLIC-ILC meeting on costs CERN, 12 June 2009.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
CLIC08 workshop Cost requirements for CLIC H. Braun, G. Riddone
Resources, Schedule and Risk Management Pierre Bonnal CERN DG-DI Projects Support Office 1 st HiLumi LHC Collaboration Meeting 16 th to 18 th November.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Introdcution to Workpackage/Activity Reflection D. Schulte.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
IDR Costing Exercise My presentation today  Some general remarks  What needs to be done for the IDR costing?  What we can realistically expect for the.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Installation and Commisioning SE view point Romuald Duperrier ESS SE manager.
MENG 446 : Management of Engineering Projects
Camera PDR/CD1 Planning 19 September 2008
Installation Global System
CLIC-ILC Cooperation ILC “PAC Review” – Vancouver May 9, 2009 Conventional Facilities Cost & Schedule Working Groups reported by Peter H. Garbincius.
ITS Strategic Planning Guidelines
EIN 6133 Enterprise Engineering
Concept Idea Title Summary of the effort to include:
CLIC/ILC Collaboration Meeting: Objectives & Organization
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT– WEEK 4 Mumtaz Ali Rajput +92 – 301-
Electron Beam Systems ETC and Methodology
WECC 2019 Scenarios – Scoping
Conventional Facilities
Enterprise Content Management (ECM) Project
Presentation transcript:

CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group1 CLIC-ILC Collaboration - #2 Cost and Schedule working group John Carwardine, Katy Foraz, Peter Garbincius, Tetsuo Shidara, Sylvain Weisz

Members and Objective Members: –John Carwardine, Katy Foraz, Peter Garbincius, Tetsuo Shidara, Sylvain Weisz Objective: The general objective of the CLIC- ILC Cost and Schedule working group is to: –Join resources in matter of cost and schedule, in order to optimize resources and avoid unnecessary duplication of effort. –Make Cost and Schedule analyses of both projects comparable CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group2

Draft mandate Compare the assumptions and methodology adopted by both projects in matter of cost. Establish functionalities for cost data analysis: Parametric cost models to define variation of costs as a function of the main parameters Risk/uncertainty assessment. Compare costs for certain items (to be defined with the agreement of management) to better understand the difference subsystem by subsystem between the two technologies Approaches to traceability: requirements; cost estimates; and the bases of estimates. Compare the basic assumptions and baseline units for schedule. CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group3

Workplan - Some ideas (1/3) CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group4 Compare the assumptions and methodology in matter of cost.  Compare PBS and WBS of both studies for easy cost comparison in the future  Define a (as common as possible) composition of the project phases covered by the cost (R&D, technical design, industrialization studies, fabrication, installation, HW & Soft tests, commissioning, Operation?)  Agree on a (as common as possible) method to establish cost and what it should include (material, labor, laboratory man-power, etc…) Establish functionalities for cost data analysis  Define elements for parameterization (beam energy, power cost, etc…)  Define common strategy for risk assessment : from individual risk to global risk

Workplan - Some ideas (2/3) Compare costs for certain items  Define a (as common as possible) basic scenario for future cost comparison (beam energy, additional components for upgrade scenario in BDS, in tunnel, etc…)  Agree on (as common as possible) cost evaluation of basic components (raw material, civil engineering/meter of tunnel, labor, KWh, Water, safety, etc…)  Compare the major cost drivers Approaches to traceability: requirements; cost estimates; and the bases of estimates.  Tools used: from excel to a « Professional » tool CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group5

Workplan - Some ideas (3/3) Compare the basic assumptions and baseline units for schedule.  Define common strategy for scheduling study  Define common strategy for risk assessment  Agree on an overall procedure & schedule including intermediate milestones aiming at a comparison by end 2009 (?) before public presentation in CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group6

CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group7 So far…Tools Both groups have so far used Excel as primary costing tool. Both groups are looking for tools for integrating cost estimate data and to do parametric analyses, eg –Raw material costs, inflation rates, effort costs, etc –Changes in scope or requirements. –Consensus that Project Management cost/scheduling tools are not inherently the right tools for managing and analyzing the cost estimates. ILC is planning to migrate to enterprise project management tools during ED phase (Primavera)

CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group8 Next steps…from Feb Establish a certain functionality for cost data analysis, eg parametric studies, risk assessment –Aim to develop and share tools together –Start small, migrate towards enterprise tools. See benefit in comparing costs for certain items, eg –Modulator costs. –(confidentiality means we will need management approval) Compare high level methodologies & assumptions –Understand each others’ methodology. –Understand how to compare cost estimates in a straight forward way.