Unit-Specific Bid Limits based on Modified Generic Cost.

Slides:



Advertisements
Similar presentations
Retail Market Subcommittee Update to TAC February 5, 2004.
Advertisements

1 Generation Adequacy Task Force Report to TAC April 7, 2005.
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
April 15, TAC Report to the ERCOT Board April 15, 2003.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Recommendation for Board approval of updated nodal fee filing Steve Byone Overview –Historical summary –Highlights from approved interim Nodal Surcharge.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
CMSC Rules Changes under Consideration Market Operations Standing Committee December 3, 2003 PUBLIC.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
Current Issues in CEDI TF on Market Solution Dispatch based on bid, payment based on OOME generic cost No “non-bid” mechanism (bidding high premium to.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.
RMR Task Force Decision Points for ERCOT Technical Advisory Committee April 3, 2003.
1 TAC Report to the ERCOT Board February 21, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
1 TAC Report to the ERCOT Board February 16, 2005.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management August 18, 2011.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2004.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
1 New MO Projects June COMS Extract, Report & Web Services Monitoring & Usage Statistics Jackie Ashbaugh.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
EILS Discussion February WMS. Charge to WMS from PRS The benefit. The cost based on the EILS PRRs. Changes in Market since April 17, 2006.
Market Working Group Update Presentation to CAWG March 29, 2011 Jim Sanderson, KCC.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
1 TAC Report to the ERCOT Board November 14, 2006.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
2009 ERCOT CSCs and Congestion Zones (10/8/08) C. Richard Ross American Electric Power Service Corporation.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Protocol Revision Subcommittee Tom Burke November 29, 2012.
Unit-Specific Deployment based on Modified Generic Cost Presented at WMS December 15, 2003.
Exceptional Fuel Costs in LMP
TAC Report to the ERCOT Board
Verifiable Cost Working Group (VCWG) Update
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
TAC Report to the ERCOT Board
Resource Cost Working Group
Presentation transcript:

Unit-Specific Bid Limits based on Modified Generic Cost

Market Solution Payments $56,837,671 Historical Market Solution Costs Initial cost for June and July was approximately $60 MM

Request to Remove Market Solution

PUC comments on removal of market solution The staff of the Public Utility Commission of Texas (PUCT staff) recommends approval of PRR 440. The Market Solution concept is currently not working properly, and is producing excessive local balancing energy service payments. PUCT staff also supports suspension, rather than elimination, of the use of Market Solution. As the Commission stated in approving Market Solution in the initial Protocols, “Competitive pricing should be used where feasible, so long as the price is the result of sufficient, active competition.” Docket No , Order on Rehearing, pages PUCT staff also supports a specific suspension period, rather than an indefinite suspension, in order to provide an incentive to correct the functioning of Market Solution and reinstitute it on a prompt basis. PUCT staff is somewhat concerned that the length of the suspension period, five months, may be excessive. However, PUCT staff is not objecting to this suspension period, with the understanding that ERCOT staff and stakeholders will work diligently with PUCT staff to develop and implement a corrected Market Solution on a prompt basis, before December of this year, if possible.

Board Approved PRR 440 In order to avoid the continued possibility of such high costs for resolving Local Congestion, PRR 440 is needed to change the payment structure to only use the formula proxy price for providing this service. A “sunset” date for this change is included (December 31, 2003) to make it clear that ERCOT and the Market Participants must develop a better alternative to this process and payment structure in a reasonable timeframe. Conclusion: Removal of the Market Solution payment option for Local Congestion is appropriate and should be implemented on an expedited basis. A sunset date of December 31, 2003, has been included under the assumption that an alternative Market Solution approach can be developed and implemented prior to that date. Recommendation: PRS and TAC have approved PRR 440 as urgent and recommend that the Board immediately approve the PRR in the form approved by TAC, as indicated in the attached TAC Recommendation Report. ERCOT Staff concurs in these recommendations.

Extension of No Market Solution 466PRR This revision extends the current expiration date for the suspension of Market Solution from December 31, 2003 to Feb.1, 2005.

Goal of Market Solution Replacement Develop a new market solution mechanism that manages the cost of solving local congestion upon the expiration of PRR 466, while allowing Market Participants to bid below an acceptable bid cap when multiple Market Participants are able to solve the same local constraint. NOTE: If PRR 466 is allowed to expire, the present Market Solution mechanism allows a $1000 premium limit.

Working Group’s Approach In order to prevent high congestion costs as experienced in June and July of 2003, the stakeholders agreed to trade-off removing the market solution mechanism in return for incorporating a premium bid limit that is closer to the present generic costs plus a reasonable margin. Remove the “after-the-fact” determination of Market Solution process by developing a mechanism which allows ERCOT to deploy specific units based on actual payment expected to be paid to Market Participant.

Market Solution Compensation for Gas-Steam = $1000 Market Solution Compensation for Combined Cycle = $ Compensation from ERCOT $1000 Compensation from ERCOT $1000 Unit-Specific Payment based on original Market Solution ($ revenue)($ revenue) Combine CycleGas - Steam Marginal Cost (7.2 HR * $4.50) +$4.00VOM= $36.40 Marginal Cost (10.8 HR * $4.50) +$4.00VOM= $52.60

Present Generic Compensation for Gas-Steam = 14.5 HR Present Generic Compensation for Combined Cycle = 9.0 HR Compensation from ERCOT 9.0 HR* $4.50 gas = $40.50 Compensation from ERCOT 14.5 HR * $4.50 gas = $65.25 Unit-Specific Payment based on Current Generic Cost Method ($4.10 net revenue)($12.65 net revenue) Creates incentive to operate inefficient units Combine CycleGas - Steam Marginal Cost (7.2 HR * $4.50) +$4.00VOM= $36.40 Marginal Cost (10.8 HR * $4.50) +$4.00VOM= $52.60

9.5 HR + (Inc. HR inefficiency >7.2) = (9.5 + (10.8 – 7.2)) = 13.1 HR 9.0 Generic HR = 9.5 HR Modified Compensation by ERCOT 9.5 HR* $4.50 gas = $42.75 Previously ($40.50) Modified Compensation by ERCOT 13.1 HR * $4.50 gas = $58.95 Previously ($65.25) ($6.35 net revenue) Develop a method that compensates for increased costs, but does not reward for being inefficient Unit-Specific Payment based on Modified Generic Cost Equalizes compensation to all Market Participants Combine Cycle Gas - Steam Marginal Cost (7.2 HR * $4.50) +$4.00VOM= $36.40 Marginal Cost (10.8 HR * $4.50) +$4.00VOM= $52.60

Up Deployments As part of the submittal of the Resource Plan, QSEs will specify bid premiums by Resource using the following formula: Gas = Daily FIP * [9.5 HR + ( Documented HeatRate – 7.2 HR)] QSEs requesting compensation above the 9.5 HR level, must provide documentation once a year, with ERCOT and the PUCT, attesting to the unit specific HR that will be used to calculate the bid premium. For Nuclear, Hydro, Coal and Lignite, Diesel, Block Load Transfer, and Renewable, the Modified Generic Price will remain the same as the present Generic Price as follows: Nuclear = $15.00/MWH Hydro = $10.00/MWh Coal and Lignite = $18.00/MWh Diesel = FIP * 16 MMBtu/MWh Block Load Transfer = FIP * MMBtu/MWh Renewable = $0/MWh

Down Deployments As part of the submittal of the Resource Plan, QSEs will specify bid premiums by Resource using the following formula: Gas = Daily FIP * [5 HR + ( Documented HeatRate – 7.2 HR)] (Presently 5 to 12 HR * FIP) For Nuclear, Diesel, Hydro, Coal and Lignite, Block Load Transfer, and Renewable, the Modified Generic Price will remain the same as the present Generic Price as follows: Nuclear = $0.00/MWH Diesel = FIP * 12 HR Hydro = $0.00/MWh Coal and Lignite = $3.00/MWh Block Load Transfer = Not Applicable Renewable = $0/MWh

Conclusions Modified Generic Cost Method equalizes net compensation for all Market Participants Equalizing revenues among all units, removes the incentive to freeze efficient units below their maximum capabilities and forcing ERCOT to deploy other inefficient units in the area that provide higher revenues Modified Generic Cost Method compensates for increase costs, but does not reward inefficiency Premiums based on settlement compensation assures deployment in the most efficient manner