Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Project Manager P. Paolucci deputy/deputy Run Coordinator G. Pugliese deputy Run Coordinator G. Pugliese deputy DPG D. Piccolo K. Bunkowski DPG D. Piccolo.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
RPC tasks and manpower P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.
RPC project chart Pigi Paolucci. RPC structure Project Manager1 0 level Deputies - Resource Manager2 0 level Istitution – Editorial – Conference2 0 level.
Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
RPC M&OB status Pigi Paolucci. Summary 2010 Cash Contributions foreseen CHF 2010 Expenditures (2009 carry over) CHF Present Income Balance.
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Data Quality Monitoring for CMS RPC A. Cimmino, D. Lomidze P. Noli, M. Maggi, P. Paolucci.
MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
A. Cimmino - P. Paolucci - G. Polese / DCS meeting DQM tool for the DCS data What the RPC community needs: 1.Make online/offline DCS data.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
Run Coordination Report 4th RPC General Meeting (CMS week) Luigi BENUSSI, Hassan SHAHZAD, Nicolas ZAGANIDIS.
RPC Endcap Maintenance and RE4 Upscope Anton Dimitrov on behalf of RPC TC CMS Week Dec 2012 CERN, Geneva.
RPC project status report RPC IB meeting 29 march 2011 Pigi Paolucci.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
CAF shifts and procedures Marcello, Raffaello, Alberto, Pigi, Sungeun, David, Silvia, Anna & all the 2009 shifters.
1 st RPC General Meeting 29 March 2011 Pigi Paolucci RPC project status.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Pierluigi Paolucci - INFN of Napoli 1 Official Muon talks at 2006 Conferences 1.10th Topical Seminar on Innovative Particle and Radiation Detectors – 1-5.
1 RPC project Upgrade Anna Colaleo (INFN-Bari) on behalf of Bari (Resp.D.Creanza), LNF (Resp.S. Bianco), Naples (Resp.L. Lista), Pavia (Resp.P. Vitulo)
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
4 st RPC General Meeting 28 June 2011 Pigi Paolucci RPC project status.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
CMS Muon detector from LHC to HL-LHC Pigi Paolucci INFN Napoli 1P. Paolucci (CMS group of Napoli) - Jan 2015.
Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
P. Paolucci G. Pugliese M.Tytgat
RPC Data Certification
Production ad Quality control of RPCs for the CMS muon barrel system
Analysis and paper on chamber and telescope performance
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
CMS RPC Endcap RE1 Status Report
RPC Detector Control System
DQM for the RPC subdetector
RPC Detector Control System
Presentation transcript:

Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status

29/03/11 1th RPC General Meeting - Pigi Paolucci 2 Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis DPG D. Piccolo K. Bunkowski C. Carillo DPG D. Piccolo K. Bunkowski C. Carillo Upgrade G. Iaselli A.Sharma S. Buontempo Upgrade G. Iaselli A.Sharma S. Buontempo Institution Board L. Litov Resource manager P. Paolucci ad interim Steering committee W. Van Doninck, M. Maggi H. Hoorani, A. Colaleo, A. Sharma (PM+DPM+RC+TC+DPG) Conference Committee S. Park, B. Pavlov Conference Committee S. Park, B. Pavlov Editorial board S. Qian, M. Abbrescia S. Bianco Editorial board S. Qian, M. Abbrescia S. Bianco Tech. Coordination S. Buontempo A. Dimitrov Tech. Coordination S. Buontempo A. Dimitrov RPC organization chart

DPG D. Piccolo K. Bunkowsk C. Carillo DPG D. Piccolo K. Bunkowsk C. Carillo Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis SoftwareValidation/ Data Certification J. Gho SoftwareValidation/ Data Certification J. Gho Detector perfomance C. Calabria Detector perfomance C. Calabria Online K. Bunkowski Online K. Bunkowski Offline D. Piccolo Offline D. Piccolo Detector & trigger analysis C. Carillo Detector & trigger analysis C. Carillo Phys Valid Tool S. Costantini Phys Valid Tool S. Costantini Detector impact on trigger Resp. Detector impact on trigger Resp. Calibration Streams M. Maggi Calibration Streams M. Maggi WBM U. Berzano WBM U. Berzano Run Quality Tae Jeong Run Quality Tae Jeong Noise tools S. Costantini Noise tools S. Costantini DQM A. Cimmino DQM A. Cimmino Skims S. Tupputi Skims S. Tupputi Simulation B. Pavlov Simulation B. Pavlov Local Reco C. Carrillo Local Reco C. Carrillo DataBase M. Maggi DataBase M. Maggi Trigger DB M Szlepper Trigger DB M Szlepper Configuration K. Bunkowski DCS Detector DB Manpower needed Not covered Covered 8/02/ RPC organization chart Non event data P. Petkov Non event data P. Petkov DPG-POG Min Suk Kim DPG-POG Min Suk Kim Upgrade Resp. Upgrade Resp.

29/03/11 4 RPC IB meeting - Pigi Paolucci Technical Coordination S. Buontempo A. Dimitrov Technical Coordination S. Buontempo A. Dimitrov Mainten. & repair. (RE,RE) Dimitrov & Shahzad Mainten. & repair. (RE,RE) Dimitrov & Shahzad Upgrade G. Iaselli A. Sharma S. Buontempo Upgrade G. Iaselli A. Sharma S. Buontempo Bakelite HPL CERN test stand CERN CERN test stand CERN Gap production Chamber mechanics Chamber mechanics Ghent site M. Tytgat Ghent site M. Tytgat India site L. Pant India site L. Pant CERN site CERN CERN site CERN Chamber QC at CERN Chamber design Off-detector electronic Off-detector electronic Cooling J. Crotty Cooling J. Crotty Gas Benussi Gas Benussi Trigger Warsaw Trigger Warsaw Documentation Dimitrov Documentation Dimitrov Equipment DB D. Uzunova Equipment DB D. Uzunova Electronics F. Loddo Electronics F. Loddo DCS hardware Resp. DCS hardware Resp. Test beam Nicolas Test beam Nicolas R&D N. Zaganidis R&D N. Zaganidis GIF activity Power system Power cable Signal cable Chamber production High eta Chamber instal. Cable instal. Commissioning at P5 Commissioning at P5 RE1/1 at P5 Run coordination & Upgrade Manpower needed Not covered Covered

Organization chart 29/03/11 1th RPC General Meeting - Pigi Paolucci 5 All the positions are now covered but not for the upgrade I’m glad to have many phd student and post-doc in the LV3 Most of them are in the DPG and are participating to the data analysis of the RPC and Trigger performances Bari, Ghent, Korea, Sofia, Uniandes……. Let me underline the perfect integration of the 6 Korean Phd and post-doc. 3 of them are already in the DPG chart.

Main goals – /03/11 1th RPC General Meeting - Pigi Paolucci 6 Main scientific goals are: In priority order 1. High efficiency of the RPC data takingTC/RC 2. Assure an high quality of the dataDPG/RC 3. Clear set of results (performance and studies)DPG 4. Build the RE4 upgrade systemTC/Up 5. Enlarge the collaborationMB/IB 6. Manpower balance & budget consolidationMB/IB

Scientific results to underline 29/03/11 1th RPC General Meeting - Pigi Paolucci results: many already approved in March Noise studies: linear dependence rate.vs. luminosity FEB configuration: great improvements (Anton, Karol, Philip) HV scan: great success of the RPC collaboration See next presentations

Steering Committee 29/03/11 1th RPC General Meeting - Pigi Paolucci 8 Chairman: Hafeez Hoorani Members: A. Colaleo, M. Maggi, A. Sharma, W. Van Doninck The RPC management board will consult the SC to get help on very urgent and crucial tasks and to solve delicate scientific issues. The experience of the 5 senior physicists members is a guarantee for the RPC project and will help us a lot in the future.

HV scan – sociological exercise 29/03/11 1th RPC General Meeting - Pigi Paolucci 9 Steering Committee was consulted to give us guidelines about the “calculation” of the high voltage working point of every single chamber. The answer was fast, very professional and clear. Let me thanks a lot the committee. Run and Technical coordination did a great job in organizing the data taking and in following it hour by hour (pressure correction, threshold setting….) DPG team was able to provide results in real time (weekend) Info and results circulated in the best way A first exercise of cross-coordination and coherent work in the RPC project

HV scan results 29/03/11 1th RPC General Meeting - Pigi Paolucci 10 Marcello, Cesare and Juan Pablo are now working and the data analysis in the DPG team. Many chambers were already working in plateau during the 2010 data taking but not all (see Marcello talk) comparison Working points Cluster size check

Noise studies 29/03/11 1th RPC General Meeting - Pigi Paolucci 11 Noise group (Silvia, Mihee and Mircho) is doing a great job and it was not so easy to clean the data in order to spot the linear increase

FEB configuration 29/03/11 1th RPC General Meeting - Pigi Paolucci 12 There was a big effort to improve the FEB configuration in few weeks !! Now parameters are automatically loaded by the database The procedure is 5-6 times faster thanks to a firmware review A WEB GUI allow us to write/read the configuration parameters (different views) HERE THE TEAM Filip - main developer of the C++ part, Karol - main developer of the Java part, also responsible for configurationDB Anton - main tester of the product, main provider of ideas Krzysztof - main developer of the Trigger Supervisor Sajjad Asghar - coordinator of the DB activities. Imran and Atif - developers of the GUI. Let me thanks Hafeez and the Pakistan database experts to join the group.

2010 results 29/03/11 1th RPC General Meeting - Pigi Paolucci 13 Many results obtained by the DPG group have been approved by the RPC collaboration (efficiency, cluster size, spatial resolution, muography…)

2011 Agenda 29/03/11 1th RPC General Meeting - Pigi Paolucci 14 General Meeting:Thursday at 9:30(1 per month) DPG/RC:Thursday at 9:30(3 per month) Tech coordination:Monday at 9:00(weekly) Upgrade: Tuesday at 9:00(weekly) Management:Wed at 10:00(weekly) restricted ISR meeting:Monday 14:00(weekly) technical 904 meeting:Wed 10:00(weekly) technical GEM meeting: Tuesday 14:00(weekly) technical Upgrade RE4 Workshopto be decided Upgrade High Eta Workshopto be decided Let me ask the 4 coordinators and deputies to actively participate to the 3 weekly meetings. Unique project

Conclusions 29/03/11 1th RPC General Meeting - Pigi Paolucci 15 RPC project is in good shape Two years of data taking + upgrade is not an easy job for a small collaboration. We are 80 people Let me stress again that we have to improve and stabilize the present project and then eventually move manpower to the upgrade Right now is still not the case !! It is important to work in a coherent way as we did for the HV scan and FEB configuration