LIU-SPS ZS Electrostatic Septum Upgrade Review held on 20.02.2013 M.J. Barnes & T. Kramer.

Slides:



Advertisements
Similar presentations
Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Advertisements

Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
Vacuum, Surfaces & Coatings Group Technology Department 04/12/2014 R. Salemme – COLDEX results during SPS Scrubbing Run I Electron Cloud Meeting #18,
Potential improvements of the PS 10 MHz cavities driving amplifier G. Favia Acknowledgments: V. Desquiens, F. Di Lorenzo S. Energico, M. Morvillo, C.
Experience of High Voltage Conditioning of Kicker Magnets M.J. Barnes Acknowledgements: G. Bellotto, P. Burkel, H. Day, L. Ducimetière, T. Kramer, V. Gomes.
BE-ABP-HSC Electron cloud simulations in the LHC MKI Electron Cloud meeting A. Romano, G. Iadarola, G. Rumolo Many thanks to: M. Barnes, M. Taborelli.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
Engineering Department ENEN Choice of the material for TCTP ferrite supports Collimation Working Group F. Carra, G. Cattenoz, A. Bertarelli,
MKI Magnet Design, PT100 Sensor Locations & Heating Observations in 2011 M.J. Barnes Acknowledgements: H. Day, L. Ducimetiere, N. Garrel 23 November 20111M.J.
Progress with Multipactor Testing of Carbon Coatings LIU-SPS-e-cloud meeting July,3 rd Michael Holz.
Carbon for SPS, state or the art and scrubbing runs, P.Chiggiato, P.Costa Pinto, P.Cruikshank, J.Ferreira Somoza, H.Neupert, A.Sapountzis, M.Taborelli,
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 19 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits With.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
INVESTIGATING THE FEASIBILITY OF A TRAVELLING-WAVE CHOPPER FOR THE CLEAN SEPARATION OF 10 MHZ BUNCHES - AT HIE-ISOLDE Abhisek Mukhopadhyay.
Acknowledgements F. Caspers, H. Damerau, M. Hourican, S.Gilardoni, M. Giovannozzi, E. Métral, M. Migliorati, B. Salvant Dummy septum impedance measurements.
Update of achievable beam characteristics at injection in LHC H.Bartosik, C.Bracco, O.Brüning, C.Carli, K.Cornelis, H.Damerau, R.Garoby, S.Gilardoni, B.Goddard,
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
MAXIMUM POWER TRANSFER THEOREM
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
CERN, LIU-SPS ZS Review, 20/02/ Brief review on electron cloud simulations for the SPS electrostatic septum (ZS) G. Rumolo and G. Iadarola in LIU-SPS.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Vacuum Devices for accelerator studies Bernard HENRIST CERN TE dept. – Technology Department VSC group – Vacuum Surfaces and Coatings OLAV III Oak Ridge.
News and hot topics Impedance meeting 14/04/2014.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC workshop 2015 EXTRACTION KICKER STRIPLINE MEASUREMENTS C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M.J. Barnes.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
Feasibility of, and options for, the new MKE kicker concept M.J. Barnes, T. Kramer Acknowledgements: L. Ducimetière, B. Goddard, B. Salvant, J. Uythoven,
Technology Department. ZS Ion Trap Development G. Raffaele and R.A. Barlow Acknowledgements: B. Balhan, M.J. Barnes and B. Pinget 21/04/2015 TCM: ZS Ion.
SPS coating studies 28 February, 2016TE-VSC1 Present situation of the development of e-cloud mitigation methods -MD 2011 results -Carbon coating of dipoles.
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
1)For existing systems, where the ferrite yoke needs to be shielded from the circulating beam, it is not generally possible to include ceramic tubes to.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
200 MHz option for HL-LHC: e-cloud considerations (heat load aspects) G. Iadarola and G. Rumolo HLLHC WP2 meeting 03/05/2016 Many thanks to: K. Li, J.
LER workshop 2014 Update on the Extraction Kicker for CLIC DRs: Calibration Tests C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral.
LIU-SPS planning – provisional LS1 / LS2 BLM, BPM MKE/MKDV/H aC 1 sextant aC 5 sextants RF 200 MHz LSS3 RF 200 MHz preparation RF 200 MHZ building.
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
LIU-SPS Beam Dynamics WG E. Shaposhnikova LIU-SPS coordination meeting
Heating and Outgassing from MKP- L Magnet M.J. Barnes & L. Sermeus Acknowledgements: M. Beck, H. Bartosik, G. Bregliozzi, C. Pasquino, G. Rumolo, L. Vega.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
Introduction High Voltage!!.
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Longitudinal impedance of the SPS
Sparking of SPS electrostatic septa in presence of e-cloud
LIU–PLI report LIU SPS meeting.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
10 MHz amplifier status G. Favia
Possible causes for SPS ZS2 misalignment
FCC hh dump kicker - switch topologies and impact on beam
Acknowledgments: LIU-PT members and deputies, H. Bartosik
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
Impedance working group update
TCTP the CST side F. Caspers, H. Day, A. Grudiev, E. Metral, B. Salvant Acknowledgments: R. Assmann, A. Dallocchio, L. Gentini, C. Zannini Impedance Meeting.
Review of ferrites used at CERN to damp HOMs: TE/ABT equipment
PSB magnetic cycle 160 MeV to 2 GeV
Current impedance issues
eSPS Impedance Considerations Aaron Farricker Acknowledgements: T
Presentation transcript:

LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer

Contributions and acknowledgements - Thanks to the speakers for clear, complete and concise presentations. - Thanks to all who attended and participated in the lively discussions. - Thanks also to Julia and Cecile for the excellent organisation

Present limitations  The ZS has sparked since introducing LHC type beam. During 2009 ZS outgassing was an important limiting factor. Outgassing depends strongly on beam parameters, in particular the bunch length.  In 2011 sparking problems with bright beams: –100kV on cathode was set to avoid sparking (due to long-time constants full voltage modulations, cycle to cycle, are not possible).  Maximum intensity seen by ZS, during operation to date, is with 25ns beam 1.2x10 11 (i.e. OK for nominal LHC but is about half the intensity required for the HL-LHC).  Worst pressure rise is in ZS5 – the reason for this is not understood: maybe ecloud occurs in nearby equipment?  Pressure rise occurs when beam is extracted from SPS (but not in ZSTF) – the reason for beam induced sparking is not understood.  ZS is not presently an important factor in the overall SPS impedance – but could become so in the future.

Conclusions and recommendations Bench measurements of beam coupling impedance of a ZS, with and without electrical circuit, to understand effect of circuit. Compare measurements with suitable predictions to validate impedance model. Damping, e.g. lossy material such as cable with ferrite loaded rubber, to be studied for electrical circuit in tank. Bench measurements to understand if wire versus foil make a difference to beam coupling impedance (bench measurements on a short model?). Determine contribution of pumping ports, in ZS interconnects, to SPS impedance. Carry out a feasibility study for moving of pumps from interconnects to ZS tanks. Ecloud simulations with electrical field map (considering effect of A-K field leakage between the wires) – with and without ion trap voltages. Cost benefit analysis of having an individual power supply for each ZS. The ZS test facility (ZSTF), although not totally representative of the installation, is invaluable for testing ideas (e.g. connection box modifications) and thus MUST be retained. All potential “solutions” must be tested in ZSTF before being deployed.

Actions Investigations shall be made re improving of the powering and measurement circuits – TE-ABT E-cloud simulations with improved model (anode wires/ main field) – field map needed – BE-ABP Investigate if measurements concerning beam induced voltage in the ZSTF are feasible – TE-ABT Follow up meeting concerning damping of high a Q impedance resonance at 44MHz – TE-ABT & BE-ABP Investigate construction of a short model to understand if wire vs. foil make a difference to beam coupling impedance – TE-ABT Define bench measurement campaign – TE-ABT & BE-ABP Determine contribution of pumping ports, in ZS interconnects, to SPS impedance – TE-ABT & BE-ABP Check if NEG coating keeps low SEY during cathode installation – TE-ABT. Done: NEG coating will only keep its low SEY under special atmosphere when not exposed to oxygen. Exposure to oxygen (air) will lead to a loss of the advantageous SEY. Improve understanding of dynamic behaviour of the ion trap – beam induced effects maybe modulating voltage and therefore possibly reducing efficiency (ABT +impedance team) – TE-ABT & BE-ABP Explore possibilities to reduce e-cloud in ZS anode on ion traps (longitudinal grooves, coating?) – TE-ABT, BE-ABP & TE-VSC Study the possibility to make improvements to the ion trap box, in particular reduce resistance – TE-ABT Investigate improvements on ZS pumping and individual tank sectorisation including failure analysis – TE- ABT & TE-VSC Assess the need for the Anode current measurement. If not needed, put the anodes directly to ground (RF screen?) – TE-ABT