Public Involvement Meeting December 10, 2014.  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.

Slides:



Advertisements
Similar presentations
September 18, 2008 I-35 South Environmental Assessment North End of I-35 SH 9W Interchange Ramps North to ½ Mile North of Main Street in Norman Public.
Advertisements

Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Environmental Impact Statement and Preliminary Engineering Public Scoping Meeting Tuesday, November 15, 2011,
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
Highway 1/169 Improvements Six Mile Lake Road to Bradach Road “Eagles Nest” October 10, 2014 Project Update Meeting Eagles Nest Town Hall.
U.S. 33 Northern Connector Alternative
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Environmental Assessment Public Meeting
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
Joe Olson SW Region Director December 8,  History/Background  Next Steps (Planning & Environmental Linkages (PEL)  PEL Process  Schedule  Questions.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
San Joaquin River NWR Proposed Expansion Planning Process Summer 2011 Fall 2011 Spring 2012 Summer 2012 Public Input Public Input Prepare Draft Environmental.
U.S. 231 Intersection Improvement in North Spencer County Heritage Hills High School Thursday, April 30, 2015.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Public Involvement Meeting June 11,  Introduce the project  Provide history and current status of the project  Explain the benefits of the project.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Illinois state line to Madison Dane and Rock County
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
US 101 Corridor Plan Prepared by: Oregon Department of Transportation May 2013.
The purpose is to explore methods to improve the safety, capacity, and mobility of Falling Springs Boulevard, US 60, and adjoining roads.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
Welcome Opportunity to Learn – Public, Groups, Agencies and FS Patience Respect Ask.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
STA Safety Project PID #76439 December 12, 2006.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
Public Open House - July 10, 2007 WELCOME. Objective of Tonight’s Open House Provide background information on the project Introduce primary work elements.
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
All information presented is preliminary and subject to revision I-515 Alternatives Development Study Public Information Meeting March 31, 2016 Welcome.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
View display boards and speak one-on-one with staff
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Technical and Public Advisory Committee Meeting #3
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Lower Makefield Township Community Meeting
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
S.R. 26 Road Rehabilitation in Clinton County
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Public Involvement Meeting December 10, 2014

 Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public meeting  Show updated traffic volumes  Review service road alternatives  Present the upcoming project schedule  Discuss opportunities for public input 2

 WIS 29 is a primary route in Wisconsin with statewide and national importance.  The purpose of the proposed project is to improve highway safety and geometric deficiencies associated with two access points to WIS 29 west of WIS E. 13 th Ln Big Rib River E. 15 th St Weisenberger Rd Krautkramer Rd NORTH

 Removal of access on WIS 29, near the WIS 107 interchange ramps, will help reduce an emerging safety concern. 4 1,800 feet 900 feet NORTH E. 13 th Lane Access

 Completed additional agency coordination.  Performed additional traffic studies.  Modified alternatives to minimize impacts to wetlands.  Added alternative E-14.  Assessed alternatives and selected three for further evaluation. 5

6  Counts completed by local citizens summer 2014 and WisDOT fall  Number of vehicles entering and leaving the plant and the quarry ranged from approximately 350 to 850 vehicles per day.  Traffic projections are being determined based on these updated values.

7

8 NORTH 13th Ln 15th St Big Rib River

9 NORTH 13th Ln 15th St Big Rib River

10 NORTH 13th Ln 15th St Big Rib River

 Obtain public input  Review the displays  Ask questions  Provide comments  Continue evaluation process  Review public and agency comments  Prepare draft environmental document  Select preferred alternative  More public involvement  Public hearing - early 2015  Right of way acquisition and 2016  Construction

12 Any Questions?

Jed Peters, P.E.Brian Andreas, P.E. WisDOT Project ManagerStrand Associates, Inc