International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.

Slides:



Advertisements
Similar presentations
1 NuPECC/ERA-NET, Paris; 27 May 2005 NuPECC LRP & Nuclear Physics ERA-NET Muhsin N. Harakeh NuPECC & KVI.
Advertisements

FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
Site report GSI Darmstadt FAIR project Overview IT at GSI
The Facility for Antiproton and Ion Research Günther RosnerNuPECC, FZ Jülich, 15/3/131.
September 19, 2006I. Augustin, GSI at PHIBADE 2006 Status of the FAIR Project I. Augustin FAIR Coordination Group GSI.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
The Physics of Dense Nuclear Matter
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project TRD workshop, Romania, September 24-28, 2005.
J. Marton, ÖPG-FAKT, Weyer, September 27, FAIR at GSI and the Future of Hadron Physics J. Marton Institute for Medium Energy Physics Austrian Academy.
GSI and FAIR - EPICS status report - Peter Zumbruch Experiment control systems group GSI (KS/EE)
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
1 Antiprotons at FAIR FLAIR SIS 100 / 300 pbar production Capture and accumulation deceleration High Energy Storage Ring for Antitprotons (HESR): 0.8–15.
Demands and Requirements for the New Control System for GSI Future Accelerators An Overview U. Krause, S. Richter, P. Schütt.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
BINP for FAIR Yu.Shatunov Moscow May Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
Claudia Höhne GSI Darmstadt
Working Group 5 Summary David Christian Fermilab.
The FAIR Chance for Nuclear Astrophysics Elemental Abundances Core-collapse Supernovae The neutrino process The r-process nuclei in -Wind Neutron Stars.
Polarized Antiprotons at GSI
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
The Active Target for R 3 FAIR Peter Egelhof GSI Darmstadt, Germany ACTAR Workshop Bordeaux, France June 16 – June 18, 2008 FAIR.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
GSI Future Facility Walter F. Henning March 2003, LEAP03 Introduction Facility Layout and Characteristics Scientific Areas and Goals Research with Antiprotons.
1 Development of models of intrabeam scattering for charged beams in storage rings E. Mikhaylova Joint Institute for Nuclear Research Dubna, Russia The.
NUSTAR Nuclear Structure, Astrophysics, Reactions NUSTAR is the biggest collaboration in FAIR The collaboration unites 450 scientists from 98 institutions.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
Valery Dormenev Institute for Nuclear Problems, Minsk
Status of the FAIR pbar Source K. Knie May 3, 2011.
International FAIR Boris Sharkov FAIR / MEPhI Scientific Managing Director, Lomonosov MSU 2015 Sweden FranceIndia Finland GermanyPoland UK Romania Russia.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke,
NuPECC Mapping Studies FINUPHY/EURONS I3 EURONSFINUPHY/FP5 EURONS/FINUPHY Meeting, Funchal (Portugal), 7-9 February 2005 NuPECC Report 2002 “Impact, Applications,
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain.
M. Steck, RUPAC 2006, Novosibirsk Cooling of Rare Isotope Beams in the ESR Cooling by: Stochastic cooling (pre-cooling) Electron cooling (final cooling)
Facility for Antiproton and Ion Research – Research Program and a Status Report Walter F. Henning – GSI Darmstadt & University of Frankfurt Hadronic Physics,
UK Research in Nuclear Physics P J Nolan University of Liverpool.
GSI, Si microstrip detectors for R3B – general concept and prototypes O. Kiselev Gesellschaft für Schwerionenforschung, Darmstadt Institut für.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
Exploring QCD with Antiprotons PANDA at FAIR M. Hoek on behalf of the PANDA Collaboration IOP Nuclear and Particle Physics Divisional Conference 4-7 April.
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
1 FAIR Project – status and research program Zbigniew Majka – FAIR Joint Core Team, Head of Research Facility for Antiproton and Ions Research Helmholtz.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
The Active Target for R 3 FAIR Peter Egelhof GSI Darmstadt, Germany ACTAR Workshop Bordeaux, France June 16 – June 18, 2008 FAIR.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt The Facility for Antiproton and Ion Research Peter Malzacher, GSI EGEE'09,
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
Precision Tests of Fundamental Interactions with Ion Trap Experiments
ESR Slow highly charged ions and antiprotons
Perspectives for Heavy-Ion Collisions at Future Facilities
Status of HESR 18th March Gießen Dieter Prasuhn.
The FAIR Project Physics Programme of FAIR CBM PANDA NUSTAR
Ladies and Gentlemen, Let me give you a short outlook to the operating of the new facility at this point. My colleague has just shown you, how we operate.
Project "Nuclotron M" / NICA
FAIR – the Universe in the labororatory
Some Thoughts on the JLEIC Ion Injector
Presentation transcript:

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction of the FAIR Phase-1 J. Eschke, GSI 1.New Layout of the FAIR Facility 2.Staged construction plan 3.Phase-1

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Primary Beams /s; GeV/u; 238 U 28+ Factor over present intensity 2(4)x10 13 /s 30 GeV protons /s 238 U 92+ up to 35 GeV/u up to 90 GeV protons Secondary Beams Broad range of radioactive beams up to GeV/u; up to factor in intensity over present Antiprotons GeV Cooled beams Rapidly cycling superconducting magnets Key Technical Features Storage and Cooler Rings Radioactive beams e - – A (or Antiproton-A) collider stored and cooled GeV antiprotons Polarized antiprotons(?) UNILAC SIS FRS ESR SIS 100/300 HESR Super FRS NESR CR RESR FLAIR International FAIR Project: Facility Characteristics

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Technical Reports FAIR Layout January SIS18 upgrade 2.SIS100 3.SIS300 4.Super-FSR 5.CR 6.RESR 7.NESR 8.Proton LINAC 9.HESR 10.Beam lines 11.Cryogenics 12.Controls 13.Civil Engineering 14.Radiation Safety

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Cost Optimization Civil Construction B1 B3 B2 B7/7a B14

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Change of p_bar operation Repositioning of HESR Repositioning of FLAIR Cave Repositioning of PP, AP, CBM caves Cost Optimization Accelerators

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Preliminary

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Three stages according to fields of science: Three stages according to fields of science: Stage 1: Radioactive beam physics Nuclear structure and nuclear astrophysics Atomic physics studies with highly charged/radioactive ions & plasma physics Stage 2: Proton-antiproton physics QCD studies with protons and antiprotons Precision studies with antiproton beams addressing fundamental symmetries and interactions Stage 3 Full facility capability & all research programs Full parallel operation of up to four research programs Full energy and luminosity for nuclear collisions program at CBM Precision QCD Studies at PANDA up to 15 GeV/c Plasma research (full gain factor in power density: ~400) Atomic reaction studies with fast beams

Stage 1 ( ) Civil Construction Activity Radioactive beam physics Nuclear structure and nuclear astrophysics Atomic physics studies with highly charged/radioactive ions & plasma physics

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Stage 2 ( ) Civil Construction Activity Proton-antiproton physics QCD studies with protons and antiprotons Precision studies with antiproton beams addressing fundamental symmetries and interactions upgraded HADES (up to 10 GeV/N) CBM prototype detector tests

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Stage 3 ( ) No Civil Construction Activity anymore Full facility capability & all research programs Full parallel operation of up to four research programs Full energy and luminosity for nuclear collisions program at CBM Precision QCD Studies at PANDA up to 15 GeV/c Plasma research (full gain factor in power density: ~400) Atomic reaction studies with fast beams

Stage 1 ( ) Civil Construction Activity Radioactive beam physics Nuclear structure and nuclear astrophysics Atomic physics studies with highly charged/radioactive ions & plasma physics