MSC latest weeks activities V. Dattilo, A. Gennai, D. Huet, E. Majorana, F. Paoletti, D. Passuello, P. Ruggi.

Slides:



Advertisements
Similar presentations
MSC recent activities virgoweek Cascina 4 Dec 2006.
Advertisements

Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
Max-Planck-Institut für Gravitationsphysik - Albert-Einstein-Institut DC Meeting Golm - Karsten Kötter1 Current status of DAQ System
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
Locking improvements after the end of VSR1 Gabriele Vajente for the Locking Group 14 th ILIAS WG1 meeting Cascina – March 6 th 2008.
1 ILIAS WG1 meeting, Hannover, Alignment electronics noise budget ● Sources of electronic noise ● C7 electronic noise ● Electronic noise for.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Designing a HEP Experiment Control System, Lessons to be Learned From 10 Years Evolution and Operation of the DELPHI Experiment. André Augustinus 8 February.
Thoughts on short term improvements for Mirror Suspension Control G.Losurdo - P.Ruggi.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
EM-MSC MSC Columbus’ eggs VW EM-MSC outline EQG  SFR Note Actuation Noise: still under study, a framework of actions is being.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
Extreme/Agile Programming Prabhaker Mateti. ACK These slides are collected from many authors along with a few of mine. Many thanks to all these authors.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
MSC recent activities Commissioning Cascina 2 Apr 2007.
31 May 2006Federico Paoletti Elba GWADW 1 Available traps (short sensors’ list) l Fast monitoring (50Hz < f sample < 20kHz)  vertical high frequency accelerometers.
Experimental tests of SA simulation Irene Fiori – Simulation Workshop – March 18, 2004 Virgo dataSiesta simulation 1. Inertial Damping simulation  test.
3 He Polarization Tests at UIUC Danielle Chandler David Howell UIUC.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
EM-MSC MSC staus & plans Commissioning meeting
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
1 Environmental Noise Studies (May-July’09) I.Fiori, Virgo Week, Commissioning Meeting, 20 July 2009 by The VIRGO Commissioning Team and EGO Vacuum, Electronics,
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
MSC - 18 Oct 071 LOW FREQUENCY SEISMIC NOISE: LOCKING AND SENSITIVITY ISSUE Paolo Ruggi noise meeting.
Cascina, June 19th, Brewster window noise ? Raffaele Flaminio EGO and CNRS/LAPP Summary - Original observations - Brewster window replacement - New.
Loïc Rolland LSC-Virgo, Orsay- June 11th Virgo ‘timing’ calibration Loïc Rolland Note: Timing calibration during VSR1 in the Virgo codifier (VIR-028A-08,
MOKE RESULTS JM micron square pads 50nm Ni/ C10-dithiol / 20nm Co Line scan across Pad
ILIAS Geneva 29 March 2007 Virgo suspension control progress E. Majorana INFN Mirror Suspension Control workgroup.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Test of the MAPS add-on board S. Amar-Youcef, M. Deveaux, D. Doering, C. Müntz, S. Seddiki, P. Scharrer, Ch. Schrader, J. Stroth, T. Tischler.
1 PAY Review Meeting 1 18/3/2009 Piero Rapagnani 18/03/2009.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Stefan Hild 111th WG1 meeting, Hannover, January 2007 DC-Readout for GEO Stefan Hild for the GEO-team.
1 Commissioning meeting, Cascina, LA electronics noise budget ● Sources of electronic noise ● C7 electronic noise ● Electronic noise for optimized.
MSC winter, short-term schedule Commissioning meeting Cascina 2 Oct 2006.
The control of the Virgo Superattenuator: present and future Giovanni Losurdo - INFN Firenze/Urbino on behalf of the Virgo Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
MSC, focus on: WI ghost noise. 1 “Recent” history and effect July 11 July 22 Aug 1 Jul 28 Aug 1 The disturbance, with us since Dec , had disappeared.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
TECHNICAL PAPER ON SIMULTANEOUS AC-DC POWER TRANSMISSION
1 ILIAS WG1 meeting, Hannover The 2 nd modulation frequency project.
30GHz system improvements Jan Kovermann RF meeting
LQS01a Test Results LARP Collaboration Meeting 14 Fermilab - April 26-28, 2010 Guram Chlachidze.
Laser System Status and Plans November 20 th, 2008 R.Febbraro / S. Viret LPC TileCal Operations 1. Diode 4 study 2. Stability preliminary results 3. Next.
20/09/2006 EM MSC September /09/2006 EM MSC “activities” (from the web page, by Giovanni) are: - Inertial damping - Local control - Tide control.
Plans for the next DAQ release
LKr status R. Fantechi.
Alignment status & plans
Tracking System at CERN 06 and 07 test beams
Homodyne readout of an interferometer with Signal Recycling
MSC report September weekly meeting EM-MSC
Thursday morning – optics correction
Weekly meeting Cascina 9 Jan 2007
5/10/2019 MSC briefing Cascina 11-Dec 2006 wwwwwww.
weekly meeting Cascina 28 Nov 2006
Presentation transcript:

MSC latest weeks activities V. Dattilo, A. Gennai, D. Huet, E. Majorana, F. Paoletti, D. Passuello, P. Ruggi

Latest week activities LC power supplies x-damping status Vertical damping DSP software

LC Power supplies (1/2) BeforeWI offNI offBS off Fastest solution : move away LC power supplies

LC Power supplies (2/2) WI, NI and BS LC power supplies moved closed to the ID rack WI, NI and BS light halogen bulbs replaced It would be better to do it also on NE, WE, and PR (even if no effect on the ITF was observed, expectedly the magnets are properly orientated)

x-damping status (1/2) LCoils: previous tests (30/01/07) were not conclusive because of the poor quality of the x position signal, hence: ErrSignal: calibration of a cleaner signal (as already done for BS in fall 2006) Same test performed on NE (12/03/07) with improved x position signal Goal : to have a more direct and efficient way to damp x oscillation: using lateral coils and a cleaner signal

x-damping status (2/2) Tower Improved x position Lateral coils test Status NE OKDone Not functioning, likely due to magnets WE OKTo redo ? NI To doTo redo ? WI To doTo redo ? BS OKTo do 1 coil broken PR To doTo confirm Likely OK

Vertical damping Problem : frequent aperture of vertical damping on WE and PR, by the guardians, due to the saturation of vertical accelerometers (see entry for details) Actions : performed last Friday on WE removal the DC offset on accelerometers note: systematic monitoring and readjustment campaign of of the offsets should be performed ? amplification reduction by a factor 3 Some days of observations to check the benefits before applying these modifications to vertical accelerometers of PR

DSP Software Tests of the new DSP SW were performed but there are still some spikes that confirm the previously seen problems note: however, the new DSP SW is currently in use for compiling ID cards in order to avoid numerical noise. Diego is preparing a new version with reduced numerical noise, protection against corrupted data, but DOL readout as before.

GIPC !! Paolo has implemented in-line the GIPC, tested again, successfully (entry 15713). Next actions: check of other components coupled to the  seism (short tower ID optimization suggested)