The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.

Slides:



Advertisements
Similar presentations
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Advertisements

1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
Mechanical and fluidic integration of scintillating microfluidic channels into detector system 1 Davy Brouzet 10 th September 2014.
Vacuum, Surfaces & Coatings Group Technology Department Glassy Carbon Tests at HiRadMat 14 March 2014 C. Garion2 Outline: Introduction Context: Transparent.
ISIS Second Target Station
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
RAL/BENE meeting, April Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg.
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
26/3/03J.E Campagne LAL Horn R&D J.E Campagne, A. Caze (Ph. D), CNGS Horn: G. Macé, S. Wallon New persons: J. Bonis, M. Omesh,… Other IN2P3 members: J.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
FP6 Design study "DIRAC secondary beams" Project "NUSTAR":Experiments with stored radioactive beams Super-FRS high-power production target has to cover.
CERN-SLAC meeting June, The LHC Collimator Project LHC Collimators for Phase 1 CERN-SLAC meeting – June, Palo Alto, Ca Alessandro Bertarelli.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Investigation of a “Pencil Shaped” Solid Target Peter Loveridge, Mike Fitton, Ottone Caretta High Power Targets Group Rutherford Appleton Laboratory, UK.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
J-PARC neutrino experiment Target Specification Graphite or Carbon-Carbon composite cylindrical bar : length 900mm, diameter 25~30mm The bar may be divided.
Parameters of the NF Target Proton Beam pulsed10-50 Hz pulse length1-2  s energy 2-30 GeV average power ~4 MW Target (not a stopping target) mean power.
6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
GRAN SASSO’S HADRON STOP Temperature’s behaviour under specified beam conditions Barbara Calcagno.
3 MeV H - chopper beam dump Presentation by L.Bruno 1 3 MeV H - Chopper Beam Dump Pre-design study By L.Bruno AB/ATB M.Magistris AB/OP M.Silari TIS/RP.
CNGS target operation and modified design 8 th International Workshop on neutrino beams & instrumentation (NBI2012) 6 th -10 th November 2012 M. Calviani.
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
ESSnuSB Target Chris Densham, Tristan Davenne STFC Rutherford Appleton Laboratory 26 th May 2014.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Engineering studies for CN2PY secondary beam. LAGUNA-LBNO General Helsinki, 26/08/20141 F. Sanchez Galan (CERN) on behalf of the CERN Secondary.
Paul Scherrer Institut 5232 Villigen PSI EURISOL Town Meeting Pisa, March 30-April 2, 2009 / W. Wagner PAUL SCHERRER INSTITUT EURISOL Spallation Neutron.
Thanks to all members of organisation committee for the preparation of this event Thanks to all participants for their interest R.Schmidt Introduction.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of Task#2 European.
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
Irradiated T2K Ti alloy materials test plans
New nTOF target: Design Issues
Heating and radiological
Emergency dumping of proton and ion beams in SIS100 F
of secondary light ion beams
of secondary light ion beams
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Pierre-Alexandre Thonet
Accelerator R&D for Future Neutrino Projects
Beam Dump outline work plan (UK perspective)
Parameters of the NF Target
HIE-LINAC status report
Use of Beam Loss Monitor type detectors in CNGS muon station
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
CNGS Project Overview Konrad Elsener.
Physics Design on Injector I
ANALYSIS OF THE HORN UNDER THERMAL SHOCK – FIRST RESULTS
Presentation transcript:

The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section

The CNGS Target Station OUTLINE 1. Driving parameters 2. Conceptual & Engineering Design 3. Status in Feb “Risk Analysis” 5. Summary

Driving Parameters The CNGS Target has to … … reliably intercept a 400 GeV proton beam every 6 s in a double fast extraction with 10 µs long spills at 50 ms distance. The nominal beam intensity is 4.8x10 13 protons per cycle, but an ultimate intensity of 7x10 13 protons must be considered in view of a possible beam upgrade. The beam has a normalised emittance of 12  mm mrad and a  to be optimised (starting value is 0.27 mm).

Conceptual & Engineering Design Main Issues  Material choice  Target Dimensions & Configuration  Efficiency & Structural Behaviour  Optimisation & Ancillaries

A Glossary related to Targets…

CNGS Target Issues

Progress to date We are here Done

Material Choice 1/2 A wide range of graphites was investigated. Based on material data available in literature, the best candidates have been identified. The table shows a selection of grades considered.

Material Choice 2/2 The change of properties with temperature was considered in the comparison between the different materials.

Optimisation (P.Sala) A thorough and lengthy study was performed to optimise the Physics and Engineering of the target unit. A huge variety of alternatives for geometry, configuration and beam size was investigated before the most promising solution was singled out. (P.Sala) WARNING: beam size is critical !!! Optimised value

Target Configuration Proton Beam 100 mm 90 mm 480 mm  4 mm  5 mm The amount and quality of the design work can be estimated from the details of the selected target configuration. (P.Sala) (Not to scale) R [cm] Z [cm]

Target Heat Load Nominal Ultimate Beam intensity p p Total Power~ 900 W ~1400 W The heat load in each of the target elements is comparable to that of light bulbs. This is low enough to simplify the cooling system and use gas convection and thermal radiation.

Target Unit - Concept 1/2

Target elements (Graphite) « Cards » (C-C composite) Sleeve (C-C composite) Tube (Titanium) Support Frame (C-C composite) Window (Titanium) Beam Target Unit - Concept 2/2

Target Element

Target Unit

Temperature increase in a Ti target tube The target heat load is limited mainly to the target elements. The surrounding tube is not significantly heated.

Fault tolerance 1/3 The physics of the CNGS target is robust enough to tolerate significant alignment errors without a decrease in particle production. Energy-weighted pion production as a function of beam  and target diameter for a 0.2 mm displacement of the beam (P.Sala)

Fault tolerance 2/3 The engineering of the CNGS target is robust enough to tolerate significant alignment errors without exceeding the allowable stress in graphite Quasi-static thermal deflection and Max Stassi stress as a function of beam misalignment in the first target rod.

Fault tolerance 3/3 Dynamic Max Stassi stress for the worst misalignment case in the first target rod compared to the case of centred beam. In the worst misalignment case the dynamic stress is within the allowed range.

Further validation of the Design Further design studies by numerical modelling of the overall heat exchange, geometrical stability, structural resistance and asymmetries; Experimental validation of the material choice (mechanical & thermal fatigue tests); Study of the thermal equilibrium by a full-size mock-up of a Target Unit with electrical heaters (d.c. and pulsed); Address open issues in the ancillary equipment: windows, in- situ spares, remote handling, shielding… There is still work to be done !

Schedule WARNING: Shielding fabrication is lengthy Shielding Cooling system Target Box Control WARNING: The schedule for the technical study and tests is tight

Summary The design of the CNGS Target fulfils the specification. In view of a possible beam upgrade, it allows an increase of beam intensity up to 7x10 13 protons. A wide range of design alternatives for target material, geometry, configuration and beam size was investigated to single out the most promising solution. The heat load in the Target Unit is limited enough to simplify the cooling system. The physics and engineering of the Target are robust enough to tolerate significant alignment errors. Presently, the technical study of the Target Unit is being performed. The activity is on budget and on schedule.

Rationale for Schedule and Budget The budget and planning for the CNGS Target Station are based on the past experience in building the T1 Target Station and the West Area Neutrino Facility (T9). T1 T9

Budget 1/2

Budget - 2/2 Shielding Design Cooling Target Control Other