Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Nick Walker KEK-DESY meeting 7 th March 2005.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Global Design Effort 22 March 2007 Tor Raubenheimer1 ILC Machine Overview and Critical R&D ALCPG Meeting Tor Raubenheimer.
Operations, Test facilities, CF&S Tom Himel SLAC.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
FALC Technology Benefits study P. Grannis Beijing GDE meeting Feb. 7, 2007 FALC = Funding Agencies for Large Colliders is composed of representatives from.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
11 June 07 Fermilab Steering Group 1 ILC Baseline Schedule, Milestones, and Decision points Tom Himel.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
ILC-GDE ILC-Americas 9/21/05ILC-Americas Regional Efforts1 G. Dugan ILC/GDE and Cornell University International Linear Collider Industrial Forums Fermilab.
W. ChouLC School, Sokendai, Japan1 Linear Collider needs you  Linear Collider is HEP’s future (~ 2020)  If we want to have a future, we must train a.
J.P.Delahaye GDE Meeting OXFORD CERN participation to ILC ILC- MoU: Support to GDE Contribution to GDE: J.L.Baldy: Civil Engineering & Conventional.
International Linear Collider Technology: Status and Challenges Steve Holmes Fermilab Wine & Cheese Seminar September 24, 2004.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
CHARGES TO THE ESAC The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
The Evolving ILC Project
Status and plans for the 3.9 GHz section of XFEL
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
J. Alexander + Cornell accelerator group Cornell University
Chris Adolphsen Sergei Nagaitsev
ILC Global Design Effort
Junji Urakawa (KEK) for ATF International Collaboration
Electron Source Configuration
Nick Walker (DESY) EU GDE Meeting Oxford
INFN and the ILC S. Bertolucci, INFN.
CLIC damping rings working plan towards the CDR
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006

EGDE Meeting DESY, 10 May 2006 Carlo Pagani 2 Past with TTF/TESLA Cryomodules –Design, construction and assembling from Cry 1 to Cry 3 (BCD Reference) –Cost Optimization and Industrial Studies Cavities and Ancillaries –Cavity Fabrication, Cost Optimization and Industrial Studies –Coaxial Blade-Tuner developpment for superstructures (BCD Reference) –R&D on alternative fabrication techniques (spinning at LNL) Damping Rings –Layout and Engineering Design –Ultra-fast Multi-frequency RF Kickers –Cost Optimization and Industrial Studies Beam Diagnostics –OTR, DF, Bunch Length Photocathode development and production for: TTF, PITZ & A0 TTF Remote Control

EGDE Meeting DESY, 10 May 2006 Carlo Pagani 3 Present and Future with ILC From S. Bertolucci conclusions (EGDE Oxford Meeting) INFN believes that the ILC is a historical opportunity to make the next step in the field, based on a truly global project. INFN will be investing resources to support a brisk R&D program on the accelerator and detectors. INFN will have a key role in the promotion of the scientific and financial case with the Italian Government. INFN will actively pursue collaboration agreements with all the major actors of the ILC enterprise ILC funding and human resources under discussion, BUT Approval of a strategic program expected by 2006 Finalization of activities on ILC and group coordination Other INFN Groups (Pisa) are being integrated

EGDE Meeting DESY, 10 May 2006 Carlo Pagani 4 INFN Ongoing R&D Activities - 1 Electron Sources (Milano) R&D on non polarized photocathodes for RF Guns. –INFN is pursuing the photocathode activity improving production and handling. –The alkali telluride photocathodes developed by INFN are being used in the Module Test Facilities (DESY and Fermilab) and can be used for non polarized auxiliary electron sources. Positron Source (LNF) Preliminary R&D on the Compton based scheme: –Collaboration to electron ring design, –study of multi-turn storage in the positron damping ring, –preparation of a proposal for test of a laser cavity on the beam at LNF (SPARC or DAFNE).

EGDE Meeting DESY, 10 May 2006 Carlo Pagani 5 INFN Ongoing R&D Activities - 2 Damping Rings (LNF) Fast Kickers: April Build and test of a prototype of fast strip line kicker with the performance required for a 6 km Damping Ring (DR) (rise/fall time ≤ 6ns, angle 5 December Install a kicker system (2 kickers at π phase advance) on the DAFNE ring at INFN-LNF and test with beam e-cloud studies: Benchmarking of e-cloud codes with measurements at DAFNE, Optimization of wiggler design: Study effect of wigglers on beam dynamics. Optimization of wiggler design and its validation at DAFNE. Collaboration to the design of the DR feedback systems: Study of possible effects of the vertical feedback on the low vertical emittance, design of the longitudinal feedback kicker cavity (DAFNE type). RF separators: In 2007, based on the results obtained with the fast kickers, study the possibility of pushing the bunch distance to smaller values by using RF separators. Participation and coordination of EUROTeV work package dedicated to Damping Rings (INFN-LNF)

EGDE Meeting DESY, 10 May 2006 Carlo Pagani 6 INFN Ongoing R&D Activities - 3 Main Linacs (Milano and Pisa + LNL) BCD Cryomodule design, based on the INFN-CRY3 experience. This is performed by INFN in collaboration with FNAL, KEK and DESY. –Cry3 documentation and specs (2 modules in construction at ZANON) –Construction of the first INFN-ILC Prototype ? Cryomodule special components –Composite support posts –Wire Position Monitors (WPM): cold diagnostics for alignment and vibrations Cavity ancillaries: INFN Blade-Tuner (some EU support on piezo R&D) –Extensive tests of the two already built piezo-assisted coaxial tuners, that are at present the most advanced and quoted candidate for ILC. –Design reviewing for cost reduction and ILC quotation –Realization of 8 blade-tuners for the INFN-ILC Prototype ? R&D on SC cavities: –HPR qualification (Milano), –Fabrication optimization (Milano) and spinning (LNL) (mainly supported by EU ) –EP and EB parameter optimization, surface analysis of treated cavities, etc. (LNL) (mainly supported by EU )

EGDE Meeting DESY, 10 May 2006 Carlo Pagani 7 INFN Ongoing R&D Activities - 4 Instrumentation & Controls (Pisa, Milano, LNF & Roma2) LLRF electronics in collaboration with Fermilab and DESY. –INFN will concentrate its activity on the control of the cryomodule component designed and built by INFN as the piezo assisted tuners and the Wire Position Monitors. –New concept electronics for WPMs, possibly to apply to BPMs too Alternative signal distribution inside and from the Cryomodule –to improve reliability and reduce cost. –work is inspired by the INFN experience on large detector electronics. Beam instrumentation based on TTF experience: DR and OTR –Measurements at TTF are continued –Diffraction radiation monitors at the DR exit ? –OTR in the injectors ? Participation to GAN (Global Accelerator Network), work package of EUROTeV, dedicated to remote control of accelerators.

EGDE Meeting DESY, 10 May 2006 Carlo Pagani 8 INFN ILC Resources (Personal extrapolation) Adiabatic growing of resources for ILC is expected ILC Provisional funding in k€ + 10 FTE Additional funding expected end of June k€ Expected ILC resources from –1,000 k€/y FTE The EU SRF Infrastructure could add 500 k€/y and some TFE The possible use of DAFNE for ILC tests could be a plus