Mark McKinnon NSF Mid-Project Review May 11-12, 2006 1 EVLA Advisory Committee Reports Mark McKinnon Project Manager.

Slides:



Advertisements
Similar presentations
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Advertisements

DECam Community Pipeline Review Closeout Presentation DES Council of Directors’ Review August 30-31, 2010 NCSA, Urbana IL.
Project What is a project A temporary endeavor undertaken to create a unique product, service or result.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, 2007 Progress on 2006 Committee Recommendations Mark McKinnon Project Manager.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, 2007 Project Management Mark McKinnon Project Manager.
Planning. SDLC Planning Analysis Design Implementation.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
S/W Project Management
Jim UlvestadEVLA Mid-Project Review May 11-12, EVLA Operations Jim Ulvestad Array Science Center Concept (Requirements) Staffing and Cost Plans.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
Z26 Project Management Introduction lecture 1 13 th January 2005
McMullinEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing: SSG (AIPS++/CASA) Development J. McMullin.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
Mark McKinnon NSF Mid-Project Review May 11-12, Budget, Schedule, Contingency Mark McKinnon Project Manager.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Post-processing Overview Bryan Butler, for Joe McMullin.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Bryan ButlerEAC meeting 2003-Sep-091 Computing Issues: Scientific Requirements Bryan Butler EVLA Project Scientist for Software (starting 2003-Oct-01)
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charges For Oct 31 ASAC Report to ALMA Board Al Wootten JAO Interim Project Scientist.
Mark McKinnon NSF Mid-Project Review May 11-12, EVLA Advisory Committee Reports Mark McKinnon Project Manager.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
S.T.MyersEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing Overview Steven T. Myers AIPS++ Project Scientist.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
Chapter 24: Architecture Competence
IEEE Std 1074: Standard for Software Lifecycle
BSA 376 Competitive Success/snaptutorial.com
BSA 376 Education for Service/snaptutorial.com
BSA 376 Teaching Effectively-- snaptutorial.com
EVLA Computing Software Overview.
Budget, Schedule, Contingency
Software Requirements
VLA to EVLA Transition Plan
EVLA Computing Reorganization
EVLA Advisory Committee Meeting
Software Requirements
Gustaaf van Moorsel September 9, 2003
Software Requirements
Mark McKinnon EVLA Project Manager
EVLA Advisory Committee Meeting, March 19-20, 2009
Observatory Science Operations
EVLA Operations Jim Ulvestad
Observatory Science Operations
EVLA Construction Status
Presentation transcript:

Mark McKinnon NSF Mid-Project Review May 11-12, EVLA Advisory Committee Reports Mark McKinnon Project Manager

Mark McKinnon NSF Mid-Project Review May 11-12, Outline Panel membership Meetings Responses/Actions on Recommendations

Mark McKinnon NSF Mid-Project Review May 11-12, Panel Membership Tony Beasley (ALMA) – management (chair) Sean Dougherty (NRC) – science John Dreher (SETI) – systems engineering Marco de Vos (NFRA) – software Glenn Miller (STScI) – software Gianni Raffi (ESO) – software Mark Reid (CfA) – science Luis Rodriguez (UNAM) – science Alan Rogers (Haystack) – electronics, systems engineering Stephen Scott (CalTech) – software Tom Soifer (CalTech) – management Steve Thorsett (UCSC) – science Jacqueline van Gorkom (Columbia) – science Sander Weinreb (JPL) – electronics, systems engineering

Mark McKinnon NSF Mid-Project Review May 11-12, EAC Meetings June 10-11, 2002 September 8-9, 2003 December 14-15, 2004 May 8-9, 2006

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2002 EAC Recommendations - 1 Use project contingency to build EVLA 2’s low frequency system or E-configuration –Not enough funds in contingency Submit EVLA 2 proposal as soon as possible. –Proposal submitted in April 2004 Consider RFI from complete systems point of view –Divided L-band amplifier into two gain blocks so that a filter can be inserted to suppress DME signals and avoid amplifier compression –Conducted intermodulation assessment to maintain high dynamic range –Developed post-correlation scheme for RFI subtraction (many EVLA memos)

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2002 EAC Recommendations - 2 Use of surface-mount and chip microwave integrated circuits (MMICs) is highly- recommended to reduce costs. –Surface-mount components and MMICS have been used as suggested. Costs reduced Project lacks overall M&C design and software engineering approach –Overall M&C design is underway –Engineering approach adopted to gather requirements, create a design, and proceed to implementation.

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2002 EAC Recommendations - 3 e2e program is too general, lacks presence of active radio astronomers, and doesn’t require deliverables on a regular basis. –AIPS++ and e2e reorganized to give projects (EVLA and ALMA) more direct control of the work –e2e and AIPS++ project scientists appointed –Scientific and software requirements documents written. Milestones derived from requirements. –Active users group (NAUG) meets regularly to set programmer priorities

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2003 EAC Recommendations - 1 Study options that will lead to completion of the low frequency upgrade –Technical solution not sufficiently well developed to warrant a proposal for funding –Low frequency upgrade removed from EVLA 2 proposal Submit the EVLA 2 proposal as soon as possible –Submitted April 2004 Investigate lowering receiver noise temperature by installing polarization-forming hybrid after the LNAs. –Investigated. Difficult to meet polarization requirements

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2003 EAC Recommendations - 2 Interferometry Software Division has responsibilities to many projects. Ensure that EVLA project needs are met. –Majority of post-processing software is common to ALMA and EVLA. Coordinated effort makes sense. –EVLA has representation in all areas of post-processing development. –Plan developed to define deliverables, acceptance criteria, and schedule for testing and reviews Improve interferometer algorithm development, with attention to RFI issues. –Ongoing effort of Project Scientist tests concepts of post- correlation RFI excision –Foster communication between groups at other observatories

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2003 EAC Recommendations - 3 Develop contingency plan to mitigate correlator risk –Test and verification plan implemented for pre-production behavioral simulation of correlator chip –Additional computer tools used to ensure that digital implementation of the chip is the same as the behavioral simulation. Better define the interface between M&C and the correlator –M&C requirements and functional specifications for the correlator backend developed –Ongoing meetings conducted with Canadian partners to specify and develop the M&C/correlator interface

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2004 EAC Recommendations - 1 Overrun in contributed effort from the operations budget to the EVLA project –$2.1M charged to the project Inadequate resources for EVLA e2e effort –10 FTE years ($1M ) provided by the project. –e2e Operations Division created for entire Observatory –Redirection of Observatory resources to e2e –Additional resources from AUI under consideration Complete refinement of L-band OMT design –Ongoing. Test results presented at recent FE CDR

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2004 EAC Recommendations - 2 Conduct a careful scientific trade-off study of descope options –Scientific study of descope options will be undertaken in FY07, if necessary. Bring younger NRAO staff into debugging and commissioning activities. –Additional, younger staff actively engaged. –Additional staff to be hired in FY07.

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2004 EAC Recommendations - 3 For system tests, two sets of antenna electronics need to operate simultaneously in the electronics lab –Excellent suggestion. Can currently simulate 2 central reference sources and 2 LO fiber links in the lab. Scope of the M&C system, its science requirements, and interfaces are not clearly defined –M&C design document is nearing completion. Includes internal interface definition. –Software development plan completed (identifies task description, developers, and timeline). –Completed report characterizing information distributed in M&C system.

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2004 EAC Recommendations - 4 No standards for M&C design and coding. –Biweekly code reviews. –CVS used for source and version control. –Maven for build environment. Standard nightly code builds. No M&C test and integration (T&I) plan –In transition from VLA to EVLA, EVLA antennas work must work with existing M&C system –Longstanding T&I procedure in place and being used –Will develop formal T&I plan for correlator in the final M&C system.

Mark McKinnon NSF Mid-Project Review May 11-12, Actions on 2004 EAC Recommendations - 5 Adequate design of the e2e system is lacking. –e2e high level design is complete. –More resources assigned to e2e, and High Level Architecture (HLA) team has started the detailed subsystem design. Identify and prioritize EVLA-specific requirements for post-processing so that required resources can be identified –Post-processing requirements common and unique to ALMA and EVLA have been identified (e.g. wide-field imaging and calibration).

Mark McKinnon NSF Mid-Project Review May 11-12, EAC Recommendations - 1 Develop more quantitative metrics for project performance for review by NRAO and external stakeholders. Perform a more detailed analysis of contingency and risk Develop more formal testing, verification, and integration plans Better define the role and responsibilities of a science advisory group

Mark McKinnon NSF Mid-Project Review May 11-12, EAC Recommendations - 2 Clarify the priority of software development items. Closely monitor the correlator delivery schedule. Make contingency plans for a longer transition period if correlator is delayed. More clearly define the role of correlator on-the- sky testing Review and simulate data handling and throughput between correlator and M&C

Mark McKinnon NSF Mid-Project Review May 11-12, EAC Recommendations - 3 Complete the refinement of the L-band OMT design as a high priority Develop a plan to objectively evaluate competing designs for the 3-bit, 4Gsps digitizers Explore collaborations with the ALMA computing group to reuse ALMA scientific support systems (SSS) software Set a realistic schedule for defining the role and structure of the new e2e Operations Division

Mark McKinnon NSF Mid-Project Review May 11-12, EAC Recommendations - 4 Reserve project contingency for project/hardware issues. Additional resources for SSS should be provided by the e2e Operations Division. Completely document the M&C design and its interfaces Raise the visibility of RFI within the project Involve more user input and external testing of CASA.

Mark McKinnon NSF Mid-Project Review May 11-12, EAC Recommendations - 5 Closely review operations plans within NRAO Hire a postdoc for antenna performance checkout Develop a hiring plan for EVLA commissioning staff Consider developing a commissioning postdoc program in NM Aggressively engage the user community in test observations