Session#52-Closing_Plenary_Notes.ppt IEEE Session #52 Indian Wells, CA Closing Plenary Subir Das, Chair WG Subir Das sdas at appcomsci dot com
Session#52-Closing_Plenary_Notes.ppt Meeting Updates Task Groups Update Liaison Reports Teleconference Future Locations Subir Das, Chair, IEEE Slide 2 Sept 2012
Session#52-Closing_Plenary_Notes.ppt TG Reports c Single Radio Handovers Task Group – 01-srho-sept-agenda-and-report.pptxhttps://mentor.ieee.org/802.21/dcn/12/ srho-sept-agenda-and-report.pptx d Multicast Management Task Group – 00-MuGM-tgd-closing-note.ppthttps://mentor.ieee.org/802.21/dcn/12/ MuGM-tgd-closing-note.ppt Subir Das, Chair, IEEE Slide 3 Sept 2012
Session#52-Closing_Plenary_Notes.ppt Liaison Reports Report – liaison-report-for ppthttps://mentor.ieee.org/802.21/dcn/12/ liaison-report-for ppt IETF Report – ietf-liaison-report.ppthttps://mentor.ieee.org/802.21/dcn/12/ ietf-liaison-report.ppt Subir Das, Chair, IEEE Slide 4 Sept 2012
Session#52-Closing_Plenary_Notes.ppt Teleconferences c Teleconferences: –Sept 27, 2012, 6 pm US EST –Oct 03, 2012, 6 pm US EST d Teleconferences: –None Subir Das, Chair, IEEE Slide 5 Sept 2012
Session#52-Closing_Plenary_Notes.ppt To carry out a Working Group 30 days Letter Ballot on the question “Should P802.21c D01 be forwarded to Sponsor Ballot?” Move: H Anthony Chan Second: Charles Perkins Yes - 07 No -00 Abstain - 01 Motion passes WG Motion Sept 2012 Slide 6
Session#52-Closing_Plenary_Notes.ppt WG Motion To authorize the IEEE WG Chair to submit the m (Revision) PAR to 802EC for consideration in the November 2012 Plenary Session Move: Anthony Chan Second: Charles E. Perkins For: 09 Against: 00 Abstain: 00 Motion passes Subir Das, Chair, IEEE Sept 2012 Slide 7
Session#52-Closing_Plenary_Notes.ppt WG Motion To authorize the IEEE WG Chair to submit the PAR and 5C to 802EC for consideration in the November 2012 Plenary Session Move: Anthony Chan Second: Charles E. Perkins For: 09 Against: 00 Abstain: 00 Motion Passes Subir Das, Chair, IEEE Sept 2012 Slide 8
Session#52-Closing_Plenary_Notes.ppt Future Sessions Subir Das, Chair, IEEE Sept 2012 Slide 9
Session#52-Closing_Plenary_Notes.ppt Future Sessions – 2012 Plenary: Nov 2012, Grand Hyatt, San Antonio, TX –Co-located with all 802 groups Subir Das, Chair WG Sept 2012 Slide 10
Session#52-Closing_Plenary_Notes.ppt November, 2012 Sessions Details Plenary: Nov 2012, Grand Hyatt, San Antonio, TX Registration Fees & Deadlines: –Early: Before 6pm Pacific Time, Friday, October 5, 2012 $400 US for attendees staying at the Grand Hyatt San Antonio $700 US for all others (including local attendees not staying at the group hotel) –Standard: After Early Registration and before 6pm Pacific Time, November 2, 2012 $500 US for attendees staying at the Grand Hyatt San Antonio $800 US for all others (including local attendees not staying at the group hotel) –Late/On-site: After 6pm Pacific Time November 2, 2012 $600 US for attendees staying at the Grand Hyatt San Antonio $900 US for all others (including local attendees not staying at the group hotel) Registration Website: IEEE 802 Plenary Session Group Hotel Rates: –Grand Hyatt San Antonio : 600 E. Market Street, San Antonio, Texas, USA –GROUP RATE (SINGLE): $195/Night (plus applicable taxes)* Rate applies to Single Occupancy Run of House Rooms, Internet access included. –GROUP RATE (DOUBLE): $215/Night (plus applicable taxes)*. –EXTENDED DATES: November 2-26, 2012; subject to availability Subir Das, Chair WG Sept 2012 Slide 11
Session#52-Closing_Plenary_Notes.ppt Future Sessions – 2013 Interim: January, 2013, Hyatt Regency, Vancouver, BC, Canada Plenary: March, 2013, Caribe Royale, Orlando, FL, USA –Co-located with all 802 groups Interim: May 2013, Hilton Waikoloa Village, 2013 –Co-located with all 802 wireless groups Plenary: 14-19, July 2013, Geneva, Switzerland –Co-located with all 802 groups Interim: 15-20, September 2013, Nanjing, China –Co-located with all 802 wireless groups Plenary: Nov 2013, Hyatt Regency Reunion, Dallas, TX, USA –Co-located with all 802 groups Subir Das, Chair WG September 2012 Sept 2012 Slide 12
Session#52-Closing_Plenary_Notes.ppt Future Sessions – 2014 Interim: January, 2014, Century Plaza, Los Angeles, CA, USA –Co-located with all 802 groups Plenary: March, 2014, Hyatt Regency, Atlanta, GA, USA –Co-located with all 802 groups Interim: May 2014, Hilton Waikoloa Village, HI –Co-located with all wireless groups Plenary: 13-18, July 2014, Manchester Grand Hyatt, San Diego, CA, USA –Co-located with all 802 groups Interim: 14-19, September 2014, TBD –Co-located with all 802 wireless groups Plenary: 2-7 Nov 2014, Grand Hyatt, San Antonio, TX, USA –Co-located with all 802 groups Subir Das, Chair WG September 2012 Sept 2012 Slide 13