Dec. 5 - 7, 2005TTC Meeting, Frascati1 Program for WG1.

Slides:



Advertisements
Similar presentations
Electrochemistry Quizzle Define the cathode. Where reduction occurs.
Advertisements

T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
The Continuing Role of SRF for AARD: Issues, Challenges and Benefits SRF performance has been rising every decade SRF installations for HEP (and other.
Lecture 264/6/05. Nernst Equation (another way to write it)
ANL-FNAL Collaboration Meeting: Superconducting RF ANL: Mike Kelly, Scott Gerbick, Bill Boettinger (NE) FNAL Collaborators: Kerry Ewald, Cristian Boffo,
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
EP parameter comparison between JLab and KEK 28 Mar ILCW2010 at Beijing, GDE/Main Linac session T. Saeki.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
1 BCD/ACD developments for Cavities Several improvements are needed on both BCD/ACD A significant amount of R&D work is needed to resolve issues –Quality.
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
Industrialization of Electropolishing (EP) D.Proch, DESY EP is the preferred cleaning method for superconducting Nb resonators (besides Buffered Chemical.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
Cornell SRF New Materials Program Nb 3 Sn Development Sam Posen and Matthias Liepe Cornell University TTC Meeting 6 December 2011 Beijing, China.
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
Deutsches Elektronen-Synchrotron Helmholtz Association of German Research Centers Hamburg, Germany Unloaded Quality Factor.
High Q R&D at JLab G. Ciovati, P. Dhakal, R. Geng, P. Kneisel, G. Myneni TTC Topical Meeting on CW SRF Cornell Univ., June 12 th -14 th, 2013.
Nb 3 Sn Cavity ERL1-4 History of ERL1-4 – Nb 3 Sn coating, just HPR Test shows relatively flat Q vs E up to quench at ~13 MV/m, Q~1e10 – 5x HF rinse, HPR.
TTC Meeting, Frascati, 5-7 December Summary of EP discussions at Oct SMTF meeting at FNAL T. Tajima (LANL), C. Boffo (FNAL)
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
X Rays LO: Describe how electron beams produce X Rays Calculate the current in terms of rate of flow of electrons.
Advances in Large Grain Resonators Activities of DESY, W.C. Heraeus and RI material and fabrication aspects preparation and RF test results W. Singer,
ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
LHC vacuum chamber dust High Pressure pure water rinse –Developed at CERN for LEP sputtered SCRF NEG Coating –Most likely must be re-applied Nozzles and.
Lutz Lilje DESY -MPY- Summary of the Superconducting RF WG DESY -MPY Overview on talks given List European Assets.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
Status JRA-SRF List of submitted deliverable reports Report on continuing activities –WP 2, WP 4 Status of remaining deliverables Highlights Approaching.
ILC-HiGrade annual meeting - 12 October 2011 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Standard EP recipe at KEK T. Saeki KEK Hot topics session SRF – 29 July 2011, Chicago.
Hydroformed Multi-Cell Cavities. Update Waldemar Singer, DESY Peter Kneisel, JLab.
Quality control of EP in KEK-STF TTC meeting April 21 st 2010 FNAL Motoaki SAWABE.
Annual Meeting CERN - November 2005 Bernard V ISENTIN.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
Recent FNAL/ANL Cavity Performance C.M. Ginsburg (FNAL) On behalf of the FNAL/ANL Cavity Crew TTC Meeting - Milano 28.Feb.-3.Mar
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Hans Weise, DESY TTC Meeting, Milano, February 28 – March 3, 2011 Technical Board Meeting TESLA Technology Collaboration Meeting Milano, February 28 th.
The problem of incrustation on Nb surface after CP or EP processing. STF Surface Research Group. M.Sawabe, H.Hayano, H.Monjushiro, S.Kato, T.Saeki, & T.Kubo.
TTC Tech Board Report Dec 7, Frascati h edwards. Tech Board Topics to discuss 1) Cavity gradient issues. This is a critical issue and the TB meeting has.
JRA1 Meeting CEA Saclay Electropolishing in Saclay Status 2005.
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
Summary of STF-EP facility at KEK.
Identification of Paint Resistance and Deposition Model Parameters for Electrodeposition Coating Simulation Ayaka SHIMURA, Yuki ONISHI, Kenji AMAYA Tokyo.
Vertical Electro-Polishing activities at CEA Saclay
Motivation Vertical Electro-Polishing for high gradient cavity R&D.
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
ANL Proposal to Perform Electropolishing for the ILC
Surface Analysis of the Quench Area Sample of Cavity Z111
Some History of Electropolishing of Niobium 1970 – 1990
Effort Torwards Improving Large Scale Production for SC Cavities
Recent results of Vertical-EP at KEK-Marui
A. Yamamoto, S. Michizono, and B. List
A COMMON R&D ON THE HIGH GRADIENT Nb CAVITIES
High Gradient Cavities
Charge for the Technical Board Members of the Tesla Technology Collaboration (TTC)
R&D Activity for Field Emission and Vertical EP
Working Group 3 Summary TTC Meeting INFN Milan,March 3, 2011
Quality control study with single-cell cavities
Proposal for an International Single Cell Cavity R&D Plan for Electropolishing Development P. Kneisel JLab Sept. 25 – 28, 2006 TTC meeting at KEK.
SRF Pb/Nb photoinjector; recent results
TTC topical-meeting on CW SRF 2013
ON THE HIGH GRADIENT Nb CAVITIES
Development of Large Grain Cavities at DESY
The S0S1 Taskforce: an Example of the Complexity for the ILC R&D Environment Lutz Lilje DESY Beijing ILC Workshop Global Design Effort.
TTC meeting at Milano, 2011' Feb. .28
Marui Galvanizing Co ., Ltd. Corporate History
Cavity Degradation Experience at S1-Global
Presentation transcript:

Dec , 2005TTC Meeting, Frascati1 Program for WG1

Dec , 2005TTC Meeting, Frascati2 Talks Short history of EP ( )P. Kneisel What we should know, but forgot Summary report of EP discussion at SMTF meeting at FNALT.Tajima Update of DESY experience with EPA. Matheisen Expereince at KEK with EPK. Saito EP activities within the CARE programA. Matheisen? Update on HPR activities at INFN MilanoP. Michelato Update in Dry Ice cleaningD. Reschke If time allows and there is some interest: Update on large grain cavity activities at DESYW. Singer Update on large grain cavity activities at JlabP. Kneisel

Dec , 2005TTC Meeting, Frascati3 Discussion Topics EP Parameters: Constant voltage vs const. current, current density, operations voltage,bath temperature,acid flow rate, anode rotational speed. aging of bath (HF concentration, dissolved Nb, composition degradation) Others: uniformity of material removal,shaping and shielding of electrodes, avoidence of Q- disease (cathode bag,acid level, HNO 3 addition), QA during EP (“online” polarisation curves and HF concentration) Contamination control ( sulfur, others,draining of acid, rinsing: hot UP water,diluted H 2 O 2,anodizing/oxipolishing, materials)….., when to start/stop application of voltage Questions: Should the community explore other EP bath compostions or make present composition “fool proof”? `How can the output of multi-cell cavity tests be increased? Is it worthwhile and possible to share facilities and testing? Are mutli-cell cavities behaving differently during EP than single cells? What can we learn from simulation calculations (DESY purchased program)? Is more input from “electro-chemistry professionals” needed? Do we need more surface science to understand contamination? And if so, where and who?

Dec , 2005TTC Meeting, Frascati4 Charge to WG1 Reducing the scatter of high-gradient EP Cavities Analysis of measured results To what extent do we understand the scatter of the results List and prioritise R&D activities Identify resources to work on these activities Describe schedule milestones Coordinate joint efforts