Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.

Slides:



Advertisements
Similar presentations
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
Advertisements

Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth
Clean Air Project: Team Big Green SpaceGasm Launch Readiness Review Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin.
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
TEAM kkkkk Conceptual Design Review Saad Alqahtani, Charles MacCraiger, Alexa Warly, Connor Jacobson, Kyle Skjerven, Matt Busby 09/19/11 Fall 2011 Rev.
Team R3D3 Critical Design Review Kate Kennedy Greg McQuie Nicole Ela Henk Wolda Marisa Antuna Devon Campbell Tyler Smith 10/04/11.
Team 7, Final Presentation December 1, Mission Overview Send up petri dishes containing bacteria Analyze the effects of temperature, pressure, and.
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
Flight Club Critical Design Review Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams October 14, 2008.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Space Monkeys Final Presentation Michael Bartek, Jacob Blakely, Katelynn Finn, Katie Fletcher, Lance Markovchick, Michael Skeen, Thomas Snow Fall.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Team R3D3 Final Presentation Devon Campbell Greg McQuie Kate Kennedy Henk Wolda Marisa Antuna Nicole Ela Tyler Smith 12/1/11.
Team Helios. Mission and Experiment Mission: Launch a balloonsat to determine the light filtering effect of the atmosphere and test the effectiveness.
Carnivorous Ninja Warriors Critical Design Review Cameron Comeau, Katie Brissenden, Kat Bryant, Arley Hendrick, Aram Podolski, Hannah Williams 06OCT2009.
Team Space Jam Critical Design Review Bridget Chase, Shane Meikle, Jamie Usherwood, Ben Azlein, Megan Scheele, Taylor King, and Paul Guerrie October 5,
Teamo Supremo Critical Design Review Ahna Issak Wes Roos Kristen Brenner Kimberley Fornall Barton Tofany Nick Martinez Ahna Issak Wes Roos Kristen Brenner.
Chouinard, John Getz, Jennifer Hewitt, Lisa Kim, Elise Salmons, Patrick Silva-Ortiz, Carlos.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
Space Debris Critical Design Review Cole Bostrom Corey Godwin Jonathon Kirchmaier Emily Logan Sean Murphy Seanna Renworth October 14, 2008 Fall 2008 Rev.
Carnivorous Ninja Warriors Launch Readiness Review Katie Brissenden, Hannah Williams, Aram Podolski, Kat Bryant, Arley Hendrick, Cam Comeau November 5,
GONS Final Presentation Steven Benedict Jake Danser Josh Hecht Brock Kowalchuk Erik Shuttlesworth Matthew Zemel December 4, 2007 Steven Benedict Jake Danser.
GloboGym Fighting Cobras Conceptual Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards September 21, 2006 Project.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Amelia Weller, Erick Chewakin, Will Hakes, Emma Mossinger, Brendon Barela, Jason Schelz, Ethan Long October 5, 2010 TEAM MATE CRITICAL DESIGN REVIEW Fall.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Team Hubble Jr. Final Presentation Rachel Small, Holly Zaepfel, Ryan Del Gizzi, Kyle Norman, and Evan Levy December 5, 2006.
Launch Readiness Review 11 Nov Brady Phillips, Elliot Guber, Brandon Campbell, Dushyant Dhundra, Joel Mendez, Cameron Trussell.
Conceptual Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani September 21, 2006.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Conceptual Design Overview
Thomas Jeffries, Anthony Anglin, Dylan Cooper, Dustin Fishelman, Colin Harkins, Joao Mansur, Starteya Pais, Andrew Trujillo 10/2/2012.
SPIRIT of the Koala Project VOLT Critical Design Review Anthony Anglin, Colin Harkins, Dylan Cooper, Thomas Jefferies, Starteya Pais, Joao Mansur, Andrew.
Lucas Ibarra Alexis Sutker Evan Long Jack Oblack Jaevyn Faulk Dylan Anderson Devon Connor Eric Hardwick October 18, 2012.
Team Andromeda Lucas Ibarra Alexis Sutker Evan Long Jack Oblack Jaevyn Faulk Dylan Anderson Devon Connor Eric Hardwick 2 October 2012.
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev A
Hang Seven Launch Readiness Review Lucas Migliorini, Becca Lidvall, Paul Smith Chase Goodman, Ethan Hollenbach, Nikhil Desai, Abby Caballero, Sierra Williams.
Team Lightning Rod Critical Design Review Fall 2010 Rev A Trevor Luke Chris Bennett Matt Holmes Sushia Rahimizadeh Alex Shelanski Matthew Dickinson.
Team Hang 7 Final Presentation Lucas Migliorini, Sierra Williams, Chase Goodman, Ethan Hollenbach, Becca Lidvall, Abby Caballero, Paul Smith, Nikhil Desai.
Hang Seven Critical Design Review Sierra Williams, Lucas Migliorini, Abby Caballero, Chase Goodman, Paul Smith, Becca Lidvall, Ethan Hollenbach, Nikhil.
Team: Hang Seven Conceptual Design Review Sierra Williams Ethan Hollenbach Rebecca Lidvall Nikhil Desai Paul Smith Lucas Migliorini Chase Goodman Abbigail.
Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya 5 November, 2009.
Space Monkeys Launch Readiness Review Project Curious George November 11, 2008 Project Curious George November 11, 2008.
Team Up, Up, and Away Final Presentation Trevor Arrasmith, Ty Bailey, Cameron Coupe, Samuel Frakes, Brandon Harris, Carolyn Mason, Soo Park, Peter VanderKley.
Zachary Cuseo, Sydni Smith, Andrew Fruge’, Tyler Knappe, Christopher Nie, and Shweta Maurya 8 October 2009.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Team Magnaritaville Final Presentation Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya December 1, 2009.
Team Honey Badger R.A.H.D. Critical Design Review October 18, 2012 Josh Power Karyn Science Kyle Team Leader C+DH Annie C+DH Zach Budget + Science C&DH.
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev C
Junk in a Box Final Presentation Frank Becky, Kyle Cummings, Jordan Haines, Villiam Klein, Matt Peoples, Ryan Scott and Aaron Young 4 December 2007.
Space Monkeys Conceptual Design Review Project Curious George Michael Bartek, Jacob Blakely, Katelynn Finn, Katie Fletcher, Lance Markovchick, Michael.
Team Hubble Jr. Critical Design Review Ryan Del Gizzi, Evan Levy, Kyle Norman, Chris Everhart, Holly Zaepfel, Rachel Small October 17, 2006.
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev A/B
Junk in a Box Critical Design Review
O2n Cloud Nine Critical Design Review
Mission Statement... The Space Wolverines will;
Team S.H.I.E.L.D. Final Presentation
Skillz That Killz Team 3 Final Presentation
Team Go Go Gadgets Launch Readiness Review
S^3 Launch Readiness Review
Space Debris Critical Design Review
Launch Readiness Review
Team Honey Badger Conceptual Design Review
Team SCREAM Launch Readiness Review
Presentation transcript:

Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design Review Oct 18, 2012

MISSION OVERVIEW

Mission Mission Overview – Our objective is to fly a GoPro camera, two digital cameras, a gyroscope and a variety of other sensors – We expect to film the entire flight to prove that 3D video is not viable in space – We expect to film the balloon burst, and we expect to determine the degrees of rotation of Saniqua – If we send a camera rig into space to take 3D video, then it will not produce viable 3D video.

Mission We are doing our mission because: – NASA invested much time and money in a 3D camera system for Curiosity – This aspect of Curiosity was scraped, as it was too complicated – We will disprove that 3D cameras are viable in space – This will save money on future projects that are considering using 3D cameras

Mission Statement Our Mission is to disprove the viability of 3D imaging in Space. We will take images using two identical cameras of the assent of our satellite, Shaniqua, of the balloon burst, and of the descent of our satellite. Using these images, we will attempt to create 3D pictures. In addition, we will use a gyroscope to determine the attitude and spin rate of our satellite.

REQUIREMENTS #Objective 1, Level 1Reference # 1.1Satellite Shaniqua shall fly a Gyroscope that will collect data continuously for the entire duration of the flight The data collected by the gyroscope shall be recorded and used to determine our satellite’s attitude and spin rate. 1 #Objective 2, Level 1Reference # 2.1Our satellite Shaniqua shall be attached to a hydrogen balloon that shall carry our satellite to an altitude of 30km Shaniqua shall be attached to a rope that is connected to the Balloon via a tube running through the center of our satellite Shaniqua shall use washers and clips to keep it stable on the rope.2 #Mission Objectives, Level 0 Requirements.Origin 0Test ability to produce 3D images in a near space environment.Mission Statement 1Determine attitude and rotation of our satellite during the entire flight.Mission Statement 2Our Satellite shall reach an altitude of 30 km.RFP 3Keep total weight under 1125g and total money spent $250.RFP 4Keep internal temperature of Satellite above -10 C.RFP 5Record environmental variables.RFP 6Ensure the safety of all members of the team.RFP 7BalloonSat must be able to fly again.RFP

#Objective 5, Level 1Reference # 5.1Our Satellite shall have an external and internal temperature sensor that shall continuously collect data for the duration of the flight Our satellite shall have a pressure sensor that shall continuously collect external pressure data for the duration of the flight Our satellite shall have an internal humidity sensor that shall collect data continuously for the duration of the flight 5 5.4Our satellite shall have a 3 axis accelerometer that shall collect data continuously for the duration of the flight All data collected from the temperature sensors, pressure sensor, humidity sensors, and accelerometer shall be stored on a 2 GB SD card Data collected form the temperature sensor, pressure sensor, and accelerometer shall be used to determine the altitude of our satellite as a function of time. 5 #Objective 4, Level 1Reference # 4.1Our Satellite shall have an internal heater powered by 9V batteries that shall heat the satellite for the duration of the flight Our satellite shall have ½ inch foam insulation on the interior of the structure.4 #Objective 3, Level 1Reference # 3.1A weight budget shall be kept and updated weekly to ensure our satellite shall weight less than 1125g A cost budget shall be kept and updated weekly to ensure our satellite cost does not exceed $250.3 Requirements

#Objective 6, Level 1Reference # 6.1Construction and Soldering equipment shall be used only in the proper manner and for the direct purpose of constructing our satellite All construction equipment and soldering tools shall be properly stored.6 #Objective 7, Level 1Reference # 7.1The structure of our satellite shall be made of foam core and shall be held together using aluminum tape and hot glue Our satellite’s structure shall remain intact during the entire flight, including the ascent, the balloon burst, the descent and 7 7.3All of our satellite’s sensors, cameras, and arduino boards shall be functioning during the duration of the flight and after landing. 7 Requirements

Design

How we are doing our mission: – We have a structure built – Programming is going well – On schedule – Tests will commence next week – Parts: All parts ordered Camera received Motors within the next 2 weeks

Design

Functional Block Diagram

$ Budget

Mass and Budget Item Quantit y WeightValueCostSupplier Arduino with Accelerometer 114g$24$21Amazon 2GB SD Card 33g$15$0Provided Arduino Uno with Humidity Sensor 130g$19$0Provided Foam Core.50m280g$45$0Provided Non-metal Tube 120g$3$0Provided Hot Glue Sticks 45g$1$0Provided Aluminum Foil.25m24g$11$0Provided Dry Ice (4.5kg) 1 bagN/A$12 Safeway Insulation.5 sheet5g$10$0Provided 9V Batteries 12111g$12$9 Provided/Safeway GoPro Camera 1350g$300$0Team heater System 1100g$5$0Provided Canon SD g$150$83.47 Provided/Amazon Free Software 1N/A$0 Team Housing and Gears 1TBD$5 Team Mabuchi FF-N20PN 25g$13.67$13.76Ebay TOTAL g$642.67$

MANAGEMENT

Schedule meeting Purpose mondays at 6pmTeam Meeting 9/28Turn in Proposal TBDCoDR Presentation 10/5Authority to Proceed Given 10/10Order Parts Deadline 10/19Receive Parts Deadline 10/22Structure Building 10/26Internal Parts Building 11/5Structure testing 11/12Vibration testing 11/15DD Rev Due 11/19Finalize Testing and Construction 11/27Launch Readiness Review 12/1LAUNCH DAY 12/11Final Presentation Due

How we will complete our mission –THIS IS HOW WE WILL COMPLETE OUR MISSION! We will fly 2 canon SD780 cameras side by side in a custom rotating camera rig Will create 3D images and video with footage from tests and flight Will fly a gyroscope; it will collect data for the entirety of the flight Will use gyroscope data to determine attitude and spin rate of satellite during tests and flight Will fly temperature, pressure, and humidity sensors Will use data to determine environmental variables during tests and flight Will ensure all components are within weight and cost budget Shaniqua will survive tests, flight and will be in condition to fly again after first flight Sensors will be properly calibrated before testing and flight, will be determined to be functioning properly We will test our structure extensively to ensure that it will survive the most violent flight conditions

TESTING

Testing Plan We have not yet tested our payload. Tests commence November 2 nd Planned Tests Structure Test – Drop and kick structure from various heights with mass models of components inside Vibration/Whip Test – Swing structure around, shake violently, mass models and gyroscope installed Image Test – All cameras shall be activated by the Arduino and shall take pictures/video to make sure they work Functional/Final Integration/Cold Test – All elements of satellite combined, shall be placed in a cooler and shall undergo cold testing to ensure all systems function at very cold temperatures

10/20Structure construction 10/20Internal parts construction 11/2Structure Testing 11/3Vibration testing 11/6Image Testing 11/9Final Systems Integration Testing 11/10Comprehensive Test Review TESTING

EXpected Results Expected Test results –Structure is expected to survive testing with minimal damages –All sensors are expected to record accurate test data –Camera rig is expected to rotate autonomously during testing –Canon cameras are expected to take synchronized video –Internal temperature is expected to remain above 20 degrees Celsius –We expect our systems to remain functional during and after cold testing

Team Diagram

Nail Biters Survival of GoPro Sensor Failure Condensation Withstanding G’s