Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.

Slides:



Advertisements
Similar presentations
16/12/02GS/ALICE TB 1 Update on the ALICE Grounding Plan From draft document (June 02) The grounding plan for ALICE proposed in this document is based.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
R.Becker (MIT) 15/10/02 UGBS Main Plate Patrick Schmid (left) of ETHZ did the CNC machining of the plate. Urs Horisberger (ETHZ) Completed follow up machining.
Variation Management of Key Characteristics
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Introduction to Equipment
PRODUCTION PROCESS SchedulingInventory Incoming QC BinningPre-assemblyCalibration Final Assembly Final QA Packaging & Shipping.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
Analysis Modules F. Hahn. Goal of todays Meeting Inform about current status and layouts of the analysis modules. (the focus will be on common modules)
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
04/02/ FH Plans for 2005 PH-DT1-GS. 04/02/ FH Physicists: Stefan Haider, Serguei Morozov (PJAS), Ferdi Hahn, Mar Capeans Technicians: Andrea.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
LHC Fire & Gas Detection Rui Nunes ST/AA/AS. Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Project Goals Install in LHC –Fire Detection –Flammable Gas Detection.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Oracle for Physics Services and Support Levels Maria Girone, IT-ADC 24 January 2005.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Detector Gas Systems Status Update Ferdi Hahn PH-TA1-GS Detector Steering Meeting November 2004.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
V. Bobillier1 Cable installation status.
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Quality Assurance for LHC Gas Systems Stefan Haider / EP-TA1.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
External Data and DIP Oliver Holme 18 th January 2008.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
ELENA installation progress F. Butin / ELENA collaboration.
Teleconference ACS – FREIA 31th May 2017
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Complementary ISTC Projects #3888, 3889p
Gas System Commissioning
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Current Status Future Progress Monitoring
Far Detector Activities Late 2017 – Early 2018
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
REX Regulator (KM47/77).
Presentation transcript:

Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas

S. Haider EP/TA1-Gas Gas Coordination meeting 24/10/032 Outline Status of present activities How do we work now How will we work for ATLAS Component cleaning Conclusions

S. Haider EP/TA1-Gas Gas Coordination meeting 24/10/033 Status CMS UX-Distribution racks nearly finished. Foreseen date of completion Nov 2003 Completed the final gas system for ALICE TPC. Tests on a dummy volume will start beginning of November. First gas system with final HW and SW in place. Started the preparations of the ATLAS Muon UX distribution racks PRR’s for CMS (all), ATLAS( except TRT) ALICE (exc.TDR), start LHCb soon.

S. Haider EP/TA1-Gas Gas Coordination meeting 24/10/034 How do we work now (1/2) For CMS and ALICE TPC we specified to all manufacturers lubricant free equipment where possible. Otherwise only lubricants specified by the detector groups were allowed. Special equipment like e.g. flexible pipes, gas distribution manifolds, etc were cleaned in CERN Prevessin. Verification with: a chemical analysis. No Si found after cleaning. TRT aging test on flexible pipe. ~700hours  no aging At the assembly place/time, Si-based oils/lubricants must be avoided by all means. In our assembly lab, all Si-based products have been removed!

S. Haider EP/TA1-Gas Gas Coordination meeting 24/10/035 How do we work now (2/2) All parts necessary for a gas system were produced using a relatively clean working environment (but no clean rooms). After all cutting, welding, etc the racks were pre-assembled to their final form and a functional test was performed. Subsequently, the piping was disassembled and all parts produced in our lab (except those already cleaned before) were sent for cleaning to Prevessin. Hereafter the rack was assembled, pressure tested and rapped with plastic foil for storage.

S. Haider EP/TA1-Gas Gas Coordination meeting 24/10/036 How will we work in the future More stringent cleanness requirements for MDT and TRT We shall install a Quality Control procedure for the rack production by end Document is in preparation that will describe in detail: Good workshop practice Component selection, procurement, cleaning and validation Logistics: reception of equipment from firms proper storage Pre- and final assembly Copy of this paper to experiments asap

S. Haider EP/TA1-Gas Gas Coordination meeting 24/10/037 Component Cleaning (1/2) By supplier Cleaning at CERN Large tubes will be cleaned in Prevessin. Limited capacities… Smaller parts in new cleaning facility at Meyrin side. Hydrocarbon-based cleaning fluid. L.Ferreira EST prepares the new cleaning machine. 1 st liters of cleaning liquid arrived at CERN, called Promoclean Will be tested on known pollutants and results will be verified via analysis Distillation apparatus for cleaning liquid must be repaired for mass cleaning Cleaning sequence:  Promoclean, distilled water rinse, Promoclean, distilled water rinse

S. Haider EP/TA1-Gas Gas Coordination meeting 24/10/038 Component Cleaning (2/2) 1 st foreman from Russia arrived. Anatoli Kapitchnikov Started to work on the MDT prototype. He will handle the EST cleaning machine in Bldg. 102 Later assembly of TRT racks

S. Haider EP/TA1-Gas Gas Coordination meeting 24/10/039 Component validation We shall supply the TRT group with equipment that we belief are clean. Aging test with the “Rapid Aging Facility” will reveal Silicon components. Goal: one equipment per week!!! After some iterations, we should come to the point that we are CERTAIN, that the cleaning procedure removes really all Silicon products efficiently.  we have validated the Cleaning Procedure

S. Haider EP/TA1-Gas Gas Coordination meeting 24/10/0310 Quality assurance How do we assure and maintain a stable quality once a cleaning procedure (here or at the suppliers place) has been established? to be defined…

S. Haider EP/TA1-Gas Gas Coordination meeting 24/10/0311 Information New EP/TA1-Gas web site: Aging test results, chemical analysis, etc.. to be found at /Equipment/componentValidation.htm

S. Haider EP/TA1-Gas Gas Coordination meeting 24/10/0312 Conclusions To the existing manufacturing procedures we shall add more stringent quality control by the end of 2003 Manpower from Russia arrived for help in the rack assembly EST cleaning equipment in preparation Component validation procedures must be settled by the sub-detectors,- with our help as much as possible.