GoCalifornia. Transportation Moves the Economy GoCalifornia.

Slides:



Advertisements
Similar presentations
March 2012 Ports and Cities Conference Newcastle Dorte Ekelund, Executive Director Major Cities Unit Department of Infrastructure and Transport
Advertisements

Performance Measures CTP 2040 Policy Advisory Committee August 19, 2014.
1 GOODS MOVEMENT IN CALIFORNIA. 2 California is facing a significant transportation infrastructure shortfall. California is using innovative approaches.
1 Trade Corridor Improvement Fund March 5, 2008 Southern California Consensus Group.
CALTRANS’ TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS CTP 2040 PAC 1 Kris Kuhl Assistant Division Chief, Division of Traffic Operations 4/15/2014 CREATING.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
Freight Action Strategy for the Everett-Seattle-Tacoma Corridor February 2003.
Dr Lina Shbeeb Minister of Transport. Jordan
2015 Interregional Transportation Strategic Plan Active Transportation and Livable Communities August 21, 2014 Scott Sauer.
ASSOCIATION OF AMERICAN RAILROADS Chicago Area Rail Infrastructure 16,000 acres, twice the area of O’Hare 78 yards, including 21 intermodal (rail-truck)
Anaheim – Los Angeles Project EIR/EIS California High-Speed Rail Authority HIGH-SPEED TRAINS IN SOUTHERN CALIFORNIA Orange County Business Council- Infrastructure.
May 28, Vision Statement and Goals, Objectives and Performance Measures for the 2040 LRTP Status of these items: Draft Approved by LRTP Subcommittee.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Transportation 2030 Plan for the San Francisco Bay Area: Action Plan Update.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Quality Region Principles The New Visions Plan addresses the region’s quality of life in a number of important ways and provides a framework for improving.
A New Regional Vision ASPA Conference April 2010 Steve Heminger, MTC Executive Director.
Freight Issues in the Report of the National Surface Transportation Policy and Revenue Study Commission Transportation for Tomorrow.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
December 12-13, 2007 Item 4.4 Tab 31 California State Rail Plan to
National Multimodal Freight Trends/Issues/Forecasts/ Policy Implications.
Jeff’s slides. Transportation Kitchener Transportation Master Plan Define and prioritize a transportation network that is supportive of all modes of.
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.
Green Transport Dr Lina Shbeeb Minister of Transport. Jordan.
Transportation Program Status Orange County Transportation OCBC Infrastructure Committee Meeting April 14, 2009 Kia Mortazavi, OCTA, Executive Director,
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
Transportation leadership you can trust. presented to FHWA “Talking Freight” Seminar Series presented by Lance Neumann Cambridge Systematics, Inc. August.
IMN’s Fourth Annual California Municipal Finance Conference IMN’s Fourth Annual California Municipal Finance Conference April 3, 2006 Steve Heminger Executive.
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Regional Goods Movement Study for the San Francisco Bay Area presented by Michael J. Fischer Cambridge Systematics, Inc. November 12, 2004 Agenda Item.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
Creating the 2040 Regional Transportation Plan. Today’s Presentation Now Developing the Next RTP  Very Early Stages of Development  Website: 2040Plan.org.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Challenges and Choices San Francisco Bay Area Long Range Plan Therese W. McMillan Deputy Executive Director, Policy Metropolitan Transportation Commission.
1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
Policy Advisory Committee (PAC) Sacramento Area Council of Governments, Sacramento, CA February 18, 2014 Policy Advisory Committee.
Southern California Association of Governments Freight Transportation: Emerging Issues for Southern California Alan Bowser Goods Movement PlanningWorkshop.
System Management and Operations System Development and Design Growth and Development Plan Components E AST -W EST G ATEWAY.
1 Climate & Transportation: Change is Coming Steve Heminger Executive Director Metropolitan Transportation Commission December 2010.
World Bank Transport Knowledge and Learning Program on ITS Cross Regional Cooperation and Freight and Logistics Applications June 22, 2010 I ntelligent.
Investing in Transportation Infrastructure Government Research Association Annual Policy Conference Janet Oakley, AASHTO July 28, 2009.
Regional Transportation & Land Use IREM / BOMA Real Estate Forecast Breakfast 2009 Rich Macias, Director Regional & Comprehensive Planning Southern California.
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
Transportation System Management & Intelligent Transportation Systems May 5, 2009 Steve Heminger Metropolitan Transportation Commission.
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
GoCalifornia Strategies to Maximize Mobility Transportation Investments Have More Impact If Built On This Foundation 1.
SAFETEA-LU System Management and Operations Provisions Jeff Lindley Director of the Office of Transportation Management Office of Operations Federal Highway.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
Orht I-5 North Coast Corridor Project CA Transportation Planning Conference – New Directions in Planning Integrating Resource and Infrastructure Plans.
Transportation 2035: S.F. Bay Area Targeting Health through Environment Metropolitan Transportation Commission Therese W. McMillan, Deputy Executive Director,
Valley Metro Update Open House and Public Hearing March 9, 2007.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
DESTINATION 2030 Regional Local Personal Adopted May 24, 2001.
1.  Transportation Vision  Near-term Recommendations  Ongoing Work / Next Steps 2.
Transportation Task Force Mission and Vision
Transportation Planning and Funding Overview
Presentation transcript:

GoCalifornia

Transportation Moves the Economy GoCalifornia

GoCalifornia Purpose of Statewide Workshop Present overview of GoCalifornia. Review and refine proposed strategies, projects and actions. Provide foundation and direction for regional workshops.

Provide overview of GoCalifornia. Review and refine proposed regional strategies. Obtain feedback and input on regional priorities. GoCalifornia Purpose of Regional Workshops

GoCalifornia Vision Improve mobility and accessibility for people, goods, services and information through a safe, integrated, multimodal, world-class transportation system that achieves the “3-E’s”: Prosperous Economy Quality Environment Social Equity

GoCalifornia Goal Mobility that continues to attract capital investment in California to generate jobs.

GoCalifornia Objectives 10-Year Investment Plan for Mobility  Address 20-Year Needs and Reduce Congestion Below Today’s Levels  Deploy Demand-Management Strategies, Use Existing Capacity More Efficiently, and Expand Capacity  Build a World-Class Transportation System That Incorporates Best Research and Technology

GoCalifornia Mobility for California Restore the “GO” in Golden State

GoCalifornia Presentation Overview Challenges – Congestion – Investments Solutions – Strategies – Projects Actions – Reform and Improve Accountability – Accelerate Project Delivery – Jumpstart Investments

GoCalifornia CHALLENGES

GoCalifornia Challenges California’s economic comparative advantage and competitive edge are threatened by decreasing mobility. Congestion is increasing statewide due to current land use patterns and planned levels of investment. Congestion is eroding our quality of life and impacting the environment. Transportation investment is not keeping pace with population increases and economic growth. California needs state-of-the-art tools to accelerate project delivery and pursue innovative partnerships with the private sector.

Current Trends Mean More Delay

More People, More Travel, Flat Revenues Vehicle Miles Traveled (VMT) Personal Income (Inflation Adjusted) Population Gas Tax (Inflation Adjusted) Year

Decades of Under-Investment Capital Expenditures Per Capita (2000 Dollars)

California State Highway System Congestion Current Congestion New Congested Routes

GoCalifornia SOLUTIONS Strategies

Measuring Our Progress Through Transportation System Performance Outcomes Accessibility Economic Development Environmental Quality Equity Mobility Productivity Reliability Return on Investment Safety System Preservation Note: Transportation system performance outcomes are enhanced by the coordination of land use and transportation.

GoCalifornia Strategies to Maximize Mobility Transportation Investments Have More Impact If Built On This Foundation

Improve and Expand System Monitoring and Evaluation Across All Systems and Modes and for Intermodal and Multimodal Transfer of People and Freight Strategies Improve System Monitoring and Evaluation Implement TMS Master Plan System Performance Outcome Improved Mobility 20% Reduced Delay Gives Vital Information on System Performance Protects System Investments Provides Key Information For Informed Decision Making Identifies Opportunities for System Integration and Coordination Implement Transportation Management System (TMS) Master Plan to Monitor Congestion/Delay on Freeway Corridors Foundation For Performance Measurement : System Monitoring and Evaluation Current Systems Monitor Performance of: State Highway System Local Streets and Roads Public Transit and Urban/Commuter Rail Intercity Passenger Rail Action Plan

Strategies Fund State Highway Operation and Protection Program (SHOPP) Plan - State Routes Increase Revenue for Local Streets and Roads System Performance Outcome Good Highway Conditions Save Each Motorist $558/Year Local Streets and Roads in Good Condition $1 in Preventive Maintenance Today Delays Spending $6-$10 in the Future for Rehabilitation Maintenance and Preservation * Costs Included in Operational Improvements Action Plan State Highways Local Streets and Roads Transit/Rail* Ensures Full Return on Investment Reduces Future Costs Reduces Delay Maintenance and Preservation : Applies To All Systems :

Wise and Integrated Land Use Decisions: Ensure Jobs/Housing Proximity Promote Transit Oriented Development Encourage High Density Residential/Commercial Development Along Transit/Rail Corridors Innovative Concepts Designed to Change Travel Behavior: Employer Sponsored Programs StrategiesSystem Performance Outcome Make Wise Land Use Decisions Implement Demand Management Strategies Implement Value Pricing Reduced Travel Demand Reduced Travel Demand/Less Delay Reduced Travel Demand/ Increased Transportation Revenue Market-Based Strategies Value Pricing Accelerated Deployment of Broadband Infrastructure Comprehensive, Integrated, Multimodal Planning and Implementation to: Manage California’s Mobility System Maximize Return on Investments Link Strategies, Actions, and Improvements for Maximum Effectiveness Reduce, Manage and Eliminate Trips Through: Smart Land Use Demand Management/Value Pricing Action Plan

Intelligent Transportation System (ITS) Includes: Traveler Information Traffic Control Incident Management (Includes Freeway Service Patrol) System Monitoring and Evaluation (At Base of Triangle) Traveler Information – Benefit/Cost Ratio of 15:1 Traffic Control – Benefit/Cost Ratio of 10:1 Incident Management – Benefit/Cost Ratio of 11:1 to 20:1 Intelligent Transportation Systems Traveler Information/Traffic Control Incident Management Action Plan Strategies Fully Fund and Implement ITS in SHOPP Plan Improve Central and Field Element Operations and Maintenance Expand Freeway Service Patrol System Performance Outcome Reduced Delay by 20% Preserved Health of System Operation and Reduced Delay Reduced Delay Total Package Will Result in: Reduced Future Delay by 200,000 Hours/Day

Strategies Fully Fund and Implement SHOPP Plan Implement Safety Improvements Implement ITS Deploy and Operate Central and Field Elements Ensure Continuation of and Improve Transit/Rail Services Total Package Will Result in: System Performance Outcome Reduced Delay/Improved Safety Improved Safety Reduced Delay/Improved Safety Preserved Health of System Operations/Maintenance Continued and Enhanced Services, On-Time Performance, Smoother Transfers Reduced Future Delay 35-50,000 Hours/Day Estimated Savings of $25 Million For Safety Increase State Highway Throughput With: Auxiliary Lanes Ramp Improvements Commercial Vehicle Weigh Stations Better Signs and Lighting Intelligent Transportation System (ITS) Elements Preserve and Enhance Existing Services: Increase Bus/Rail Car Maintenance and Rehabilitation for Reliable System Operation and On-Time Performance Improve Passenger Stations Implement Service Refinements Operational Improvements Action Plan Improve Safety: Reduce Safety Problems Implement Safety Conscious Planning and Response

System Performance Outcome Improved Mobility and Reliability, Reduced Congestion Improved Mobility Improved Goods Movement and Mobility Improved Mobility and Safety Reduced Congestion/Increased Transit Reduced Congestion/Increased Transit Ridership Reduced Congestion Improved Transportation Alternatives Improved Access and Mobility Reduced Future Delay 100,000 Hours/Day System Completion and Expansion: Complete and Improve High Occupancy Vehicle (HOV) System Network Upgrade Key Interregional Routes to Freeway/ Expressway Standards on 10 Focus Route Corridors Add Capacity and Improve Major Goods Movement Corridors (Highway/Rail) Upgrade Selected State Highways to Higher Standards Expand Urban/Commuter Rail and Intercity Passenger Rail System Completion and Expansion Expand Park and Ride Facilities Expand Pedestrian and Bicycle Facilities Expand Tribal Roads and Improve Access To Tribal Lands Action Plan Strategies Complete HOV Systems Complete Focus Routes Expand Freight Corridors Complete Regional Priority Routes Expand Existing Transit/Rail Services Fund New Urban/Commuter Rail Expand Intercity Passenger Rail Expand Park and Ride Program Improve Bicycle and Pedestrian Improve Tribal Roads Total Package Will Result in:

GoCalifornia SOLUTIONS Projects

Highway System Goods Movement Intercity Rail Local Streets – Roads Public Transit Commuter Rail Paths – Bicycles/Pedestrians GoCalifornia 10-Year Mobility Implementation Plan Comprehensive Integrated Transportation System Components:

Must Preserve $300 Billion State Highway Investment Improve Safety Repair Bridges Replace/Repair Existing Roadway Preserve Roadside Features Reduce Delay to Facilitate Goods Movement Upgrade Operational Facilities

LANE REPLACEMENT Cost Effective Investment Excellent Failed Age Each $1 spent here Condition Delays spending $6 here Delays spending spending $20 here $20 here New ROUTINE MAINTENANCE Old REHABILITATION PREVENTIVE MAINTENANCE RECONSTRUCTION Repair Costs Pavement Conditions

National Goods Movement Corridors Network Flows (Tons) State to State Flows (Tons) 0 to 500,000 0 to 1,000, ,001 to 1,000,000 1,000,001 to 5,000,000 1,000,001 to 10,000,000 5,000,001 to 10,000,000 10,000,0001 to 50,000,000 More than 10,000,000 More than 50,000,000

California Goods Movement Four “Port to Border” Regional Corridors  Los Angeles-Long Beach  Bay Area  Central Valley  San Diego

The Goods Movement Action Plan identifies the need to invest $50-$53 billion over the next 20 years.  About $3.9 billion of projects underway.  Total statewide projects identified require $48 billion over 20 years ($14.4 billion priority projects).  Environmental mitigation is estimated to cost $2-$5 billion.

GoCalifornia Examples of Major Projects to Improve Goods Movement Upgrade Alameda Corridor East Through the Inland Empire Construct Alameda Corridor State Route (SR) 47 Expressway Construct Southern California Separated Truck Tollway Replace Gerald Desmond Bridge Near Port Terminals Expand Port of Oakland Joint Intermodal Terminal Construct Interstate 205/Interstate 580 (I-205/I-580) Truck Climbing Lanes Complete SR 99 from Bakersfield to Sacramento to Freeway Standards Construct Additional Main Line Rail Track Through Cajon Pass Construct Near Dock and Inland Port Facilities Construct Mexico Border Improvements at Otay Mesa

Intercity Passenger Rail Ensures Modal Choices Between Cities Statewide Complements Mobility in Major Freeway Corridors Provides Connectivity and Multimodal Transfer For Californians and Visitors GoCalifornia

All Corridors Acquire Additional Rolling Stock Pacific Surfliner Corridor Add Third Track and Grade Separations from Los Angeles to Fullerton Upgrade Tracks to Improve Operations at Los Angeles Union Station Capitol Corridor Improve Track to Improve Reliability, Travel Time and Capacity/Frequency Develop Intermodal Terminal at Sacramento Station Rail Yard San Joaquin Corridor Add Double Track from Pittsburg to Antioch GoCalifornia Examples of Major Projects to Improve Intercity Passenger Rail Services

GoCalifornia Statewide Strategies Regional Priorities Optimize Capacity Through System Management Facilitate Goods Movement to Reduce Delays Expand and Improve Multimodal Transfer Facilities/Expand Transit Services Foster Efficient Land Use Encourage Collaboration Across Boundaries and Borders

GoCalifornia Performance Metric for Mobility Speeds of 35 Miles Per Hour or Less During Peak Commute Periods Lasting 15 Minutes or Longer

Bay Area Current Congestion

New Congested Routes Bay Area

Optimize Capacity Through System Management Close Freeway Gaps Facilitate Goods Movement Expand and Improve Multimodal Transfer Facilities/Expand Transit Services Foster Efficient Land Use Ensure Sufficient Housing Supply for All Promote High Density Development Along Transit Nodes/Corridors Encourage Infill/Refill Development Encourage Collaboration Across Boundaries and Borders Bay Area Current Congestion New Congested Routes

Southern California Los Angeles and Orange Counties Current Congestion

Southern California Los Angeles and Orange Counties Current Congestion New Congested Routes

Optimize Capacity Through System Management Facilitate Goods Movement Expand and Improve Multimodal Transfer Facilities/Expand Transit Services Foster Efficient Land Use Ensure Sufficient Housing Supply for All Promote High Density Development Along Transit Nodes/Corridors Encourage Infill/Refill Development Encourage Collaboration Across Boundaries and Borders Southern California Los Angeles and Orange Counties Current Congestion New Congested Routes

Southern California Inland Empire Current Congestion

Southern California Inland Empire Current Congestion New Congested Routes

Optimize Capacity Through System Management Improve and Complete Key Interregional Routes Identify State Highways and Regional Corridors for Improvement Facilitate Goods Movement Expand and Improve Multimodal Transfer Facilities/Expand Transit Services Foster Efficient Land Use Ensure Jobs/Housing Proximity Promote High Density Development Along Transit Nodes Encourage Infill/Refill Development Implement Regional Growth Strategies Southern California Inland Empire Current Congestion New Congested Routes

San Diego and Imperial Counties Current Congestion

San Diego and Imperial Counties Current Congestion New Congested Routes

Optimize Capacity Through System Management Complete Focus Routes and Mexico Gateway Routes Facilitate Goods Movement Expand and Improve Multimodal Transfer Facilities/Expand Transit Services Foster Efficient Land Use Ensure Sufficient Housing Supply for All Promote High Density Development Along Transit Nodes/Corridors Encourage Infill/Refill Development Encourage Collaboration Across Boundaries and Borders (Example: San Diego Association of Governments Regional Comprehensive Plan) San Diego and Imperial Counties Current Congestion New Congested Routes

Central Valley Current Congestion

Central Valley Current Congestion New Congested Routes

Upgrade SR 99 to Freeway Standards Facilitate Goods Movement Upgrade East/West Focus Routes Foster Efficient Land Use Ensure Jobs/Housing Proximity Promote High Density Development Along Transit Nodes/Corridors Encourage Infill/Refill Development Encourage Collaboration Across Boundaries and Borders Improve Air Quality Develop Regional Growth Strategies Central Valley Current Congestion New Congested Routes

Central Coast Current Congestion

Central Coast Current Congestion New Congested Routes

Close Freeway Gaps Improve East/West Connector Highways Foster Efficient Land Use Promote Sufficient Housing Supply for All Encourage Infill/Refill Development Encourage Collaboration Across Boundaries and Borders Central Coast Current Congestion New Congested Routes

North State, Mountain and Eastern Sierra Counties Current Congestion

North State, Mountain and Eastern Sierra Counties Current Congestion New Congested Routes

Improve Key Interregional Routes Optimize and Add Capacity on I-5 and I-80 Facilitate Goods Movement Promote Economic Development, Tourism and Jobs North State, Mountain and Eastern Sierra Counties Current Congestion New Congested Routes

Current and Future Congestion Reduced Improved Travel Time and Reliability 2025 – Eliminate or Reduce Future New Congestion GoCalifornia Statewide Strategies - Regional Priorities Future With GoCalifornia

Current Congestion 2025 Congestion Improvement Due to Implementation Daily Vehicle Hours of Delay GoCalifornia Comprehensive Strategies to Reduce Congestion HOV System Completion, Highway and Rail/Transit Expansion Highway Operational Improvements and Enhanced Rail/Transit Intelligent Transportation Systems Smart Land Use and Demand Management Preventive Maintenance Reduces Delay from Reconstruction Conceptual Framework for Reducing Congestion that Needs to be Verified Through Experience 2025 Congestion

Daily Vehicle Hours of Delay Congestion Reduction Congestion Current 2025 Congestion San Diego Region (SANDAG) Southern California Association of Governments (SCAG) Bay Area Region (MTC) Sacramento Region (SACOG) San Joaquin (SJCOG) Outcomes of Comprehensive Strategies to Reduce Future Congestion in California’s Five Major Regions

GoCalifornia ACTIONS

Actions  Reform and Improve Accountability Make Caltrans a “Mobility Company” ($50 Million/Year Savings from Efficiencies) Adopt Performance Standards Increase Return on Investment GoCalifornia

Actions  Accelerate Project Delivery Design-Sequencing (Process Streamlining) Design-Build (Innovation in Construction) Public-Private Partnerships (HOT Lanes, Express Lanes, Goods Movement) GoCalifornia

Actions  Jumpstart Investments Gaming Compact Revenues ($1 Billion) Proposition 42 Funding ($1.3 Billion) Proposition 42 Fix ($1.3+ Billion 07-08) Proposition 42 Loans Repayment ($2.5 Billion) Private Investment – Users Fees GARVEE Bonding on Federal Funds ($2.4 Billion) Federal Funds (Goods Movement Corridors) GoCalifornia

Yield High Returns For All Californians Increase Safety and Reliability Provide More Viable Transportation Choices Improve and Strengthen the Economy Increase California’s Comparative Advantage and Competitive Edge An Enhanced and Expanded Economy Is Dependent Upon a Safe, Efficient and Reliable Transportation System Investments in Transportation

GoCalifornia