Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014.

Slides:



Advertisements
Similar presentations
Wetsuit Roofing and Waterproofing
Advertisements

Examples of asbestos- containing equipment. Old blackboard from an office Condition safe but requires correct disposal. Front Rear Warning sign faintly.
Readyville Mill Restoring the Readyville Mill. March 2006 Forgotten and Neglected for 40 years.
The Installation Process applicable for new buildings.
Lightweight Forming System and Roofs for Concrete Floors.
Classroom 1. Mission San Luis Rey.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Installation of new drainage systems and reshaping of “splitter” island Rushden Redevelopment 2014.
Assignment: Draw the four elevations of your building
MNM Fatal Falling Material Accident Falling Material Accident August 17, 2012 (Florida) August 17, 2012 (Florida) Victim Recovered September 4,
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
© Oxford University Press 2011 IP1.9.4 Payback calculations Payback calculations.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
PERMITS & INSPECTIONS DEPARTMENT 2003 INTERNATIONAL RESIDENTIAL CODE IRC.
Hargrave Street Pumpstation – Site Preparation July 2014.
Futureview Solar Solutions Elysburg, Pa. Call
RENOVATION & RESTORATION. New 3 rd Floor Prosecutors Office Existing Attic Space.
 In Slovakia according to the climate, weather and geographic conditions, plus energy house cannot be built because the only source of energy can be used.
Part I January 26, Income Pledges $150,000 47% Offering $33,200 10% Total$183,200 57% Endowment $75,452 24% Other funds $48,542 15% Total$123,994.
Saline County Health Department Structural Reinforcement Feb 18, 2014.
Sylvan Theater Column Restoration Project
Roof Parapet Details.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Building the Houses Sri Lanka Tsunami Reconstruction Project in
ASSIGNMENT Begin on page 197 “The Foundation”.
Kitchen: fridge resting on debris blocking entrance to utility room.
Eco-$mart, Inc Pre-panelized, steel reinforced, super insulated, poured concrete wall system.
Introduction to a pit installation
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Construction Progress (Advance to the next slide by clicking your mouse) Photos provided by Karen Ressler, Board of Education Published 8/4/05.
Bing Kong Tong Building at the completion of Phase 1 Grants provided by CCHE and SHRA.
Construction on the Bing Kong Tong Building For CCHE Quarterly Report 1/1/2014 – 3/31/2014.
Access for All – The WMI Elevator Project What started as a dream several years ago is now becoming a reality. By the fall of 2010, the WMI will have a.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Hall C Users Meeting SHMS Structure Installation A pictorial review Mike Fowler Hall C Engineering 21 Feb 2014 M. Fowler Hall C Users Group, 2014.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
1 TT10 Remedial works What is happening. 2 Compression failure in crown (some cases) Tension/Shear failure in shoulders (typical) Compression Tension.
E0-LyOut.PPT Friday, March 04, East Blvd. LA #3#2 #1 #4 3 car port Washington Place EastBlvd.EastBlvd. North CL 25’ inside21’ 13’ 8”24’18’
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
Drafting 2 (Arch) Quiz Review #5
3’ door 32 ‘ 14 ‘ 18 ‘ Rear ramp door 8’4” 3’ x 16’ slide out 3’ x 10’ slide out 3 ‘ 8 ‘ 12 ‘ FRONT Top View Dimensions.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
WBS Experiment Infrastructure: LArTF GPP Project Status Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 11/02/12.
Foundations of Technology Construction
APPLICATIONS OF TECHNOLOGY
Prepared by Frank Cooney B.Arch MRIA
Grout and Other Reinforcement Module
Objective 6.02 part 1: Recognize components of construction
ASSESSEMENT AND REHABILITATION OF STRUCTURES
نتعارف لنتألف في التعارف تألف (( الأرواح جنود مجندة , ماتعارف منها أئتلف , وماتنافر منها اختلف )) نماذج من العبارات الايجابية.
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Section and Details Vocabulary and Basic Information
Minuteman Vocational Technical Regional High School Progress
Progress Report 11/10/11.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
STRUCTURAL TIMBER FRAMING
Collapse Patterns.
THIS CASTLE DESIGN IS FROM WWW. STORMCASTLE
In-Class Scheduling Exercise
Hurricane-Proof Homes
THIS CASTLE DESIGN IS FROM WWW. STORMCASTLE
Presentation transcript:

Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014

Forms and rebar at the front of the building ready to pour for shear walls.

Rafters getting reinforced Dry rot and broken rafters were reinforced to carry new roofing material.

LVLs (manufactured beams) were added at the rear and front of the building.

Concrete was poured into forms at the front and rear for shear wall support.

Old front parapet wall going down Main Street for storage at River Storage. It was removed due to dry rot damage.

Rebuilding of the new parapet wall to exact dimensions of the original.

The new parapet wall being placed

Installing insulation

Installing insulation prior to roofing