AMS-02 Integration Cables Status and Electrical Integrated Testing Status Tim Urban / ESCG January 10, 2007 Alpha Magnetic Spectrometer.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 DELTA CDR Permanent Magnet Avionics Changes Summary May 4, 2010 Timothy J. Urban / ESCG /
ISIM Integration & Test Mike Drury JWST-PRES
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Nick Arnal, Jason Entenmann, Chris Thompson Dr. Gokhan Mucmu URL: Test Fixture to Characterize Elastomeric.
Diagnostic & Troubleshooting Date 06/09/00, Page 1 Diagnostic & Troubleshooting s.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
From Research Prototype to Production
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
GLAST Large Area Telescope:
1 AMS-02 Integration & Test Plans & Status Trent Martin 24 January, 2007.
AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 Phase III PSRP / SRP Electronics Summary January 12, 2010 Timothy J. Urban / ESCG / Barrios.
1 Alpha Magnetic Spectrometer – 02 Phase III Flight Safety UPS Overview Jan John A. Heilig ESCG/Jacobs.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Status of PDS A.Lebedev MIT AMS TIM Meeting, Houston, January 2007.
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 Phase III PSRP / SRP Channelization Summary January 12, 2010 Timothy J. Urban / ESCG / Barrios.
1 AMS-02 Integration & Test Plans & Status Ken Bollweg/NASA John Heilig/JS Robert Becker/MIT 12 January, 2007 AMS JSC.
ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 1 Monthly Status Report Report due 2/25/01 Schedule statused.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Payload Safety Review Plan and Issues Leland D. Hill.
New product introduction:
TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Ground Safety Status.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
KSC Ground Operations Timeline. KSC CGSE TIM A Technical Interchange Meeting regarding the Cryo Ground Support Equipment was held at KSC November 1 st.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
CR AMS-02 D-0161 AMS Configuration Control Board Comments for AMS-02/D-016 Magnetic Spectrometer – 02 (AMS-02) Assembly and Testing Integration Plan.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH July 23rd 2008 VST Meeting1.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
GLAST LAT ProjectEnv Test Planning,15 March 2005 LAT System Engineering 1 LAT Thermal Vac EGSE Cabling.
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Obsolescence Driven Avionics Redesign (ODAR) Status POIWG #31, January.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
ELENA installation progress F. Butin / ELENA collaboration.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
Bill Raynor Naval Research Lab
Double Star: Experiment Activities
Gayle K. Martin November 14, 2016
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
Double Star: Table of Contents
Teleconference ACS – FREIA 31st October 2017
0.0 Instrument Suite Name Presenter’s name
Integration and Test Organization Chart
as a prototype for Super c-tau factory
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

AMS-02 Integration Cables Status and Electrical Integrated Testing Status Tim Urban / ESCG January 10, 2007 Alpha Magnetic Spectrometer

Integration Cables Status Electrical Integrated Testing Status: I/F Design Description: Power and Data Interfaces for Integrated AMS-02 Payload Testing Upcoming Tests: Pad Ops Preliminary Interface Test (POPIT) PDS EM Power Quality Test (PQT) January 10, 2007T. J. Urban / ESCG2 Alpha Magnetic Spectrometer Integration Cables and Electrical Integrated Testing Status Presentation Outline

Design: The integration cables design and drafting are complete. The cables are summarized in the table on the next page. The lengths of 6 cables are being updated based upon their redesign so that they may be used as test cables (discussed later). Of twenty different cable designs, four are complete through cable drawing checking. The remaining checking will be completed January 19, The cable drawings will be released at JSC when they complete checking. Procurement: All materials required for flight cable fabrication have been ordered. 88% of these materials have been received and are in bonded storage. The remainder of these materials are due by end of Jan ‘07 (1 item in Feb). All fabrication tools have been ordered and received. January 10, 2007T. J. Urban / ESCG3 Alpha Magnetic Spectrometer JSC Provided Integration Cables Design, Fabrication and Delivery Status

January 10, 2007T. J. Urban / ESCG4 Alpha Magnetic Spectrometer JSC Provided Integration Cables Design, Fabrication and Delivery Status Cable Summary

Fabrication: The estimate for JSC cable fabrication labor is complete. JSC work will begin this month, and be complete by the end of April ’07. Four cable designs (total qty. 6) will be completely fabricated at JSC. Six cable designs (total qty. 12) will be 67% fabricated at JSC, with the remaining 33% completed at CERN in August ’07. Ten cable designs (total qty. 18) will be 67% fabricated at JSC, with the remaining 33% completed at KSC in February ’09. JSC cable fabrication tech. will perform cable completion at CERN & KSC. Delivery: Thirteen cable designs (total qty. 25) delivered to CERN in July ’07. Two AFD cable designs (total qty. 4) delivered to Shuttle FCE later in ’07. Five cable designs (total qty. 7) delivered to KSC in December ‘08. January 10, 2007T. J. Urban / ESCG5 Alpha Magnetic Spectrometer JSC Provided Integration Cables Design, Fabrication and Delivery Status

Miscellaneous: During CERN payload pre-integration and integration, UUSS and LUSS real estate required for subsequent KSC work should be marked and reserved: Integration cable routing Hardware installation: EVA Connector Panel, ROEU PDA, PVGF JSC ESCG (D. Nguyen) to continue working closely with AMS-02 cable routing modeling team. JSC ESCG to provide EVA rated cable labels for use by AMS-02 at CERN (4 week delivery ARO – purchased next week). MIT (X. Cai) will use existing 1553 cables in upcoming J-Crate ESS to verify 1553 RT stub length of 25 feet is acceptable at hot and cold temperatures. (design validation) The modified PVGF cable harness will be designed to include the fuse required to protect the SSRMS wiring from over-current / over-temperature from AMS-02 heaters powered during SSRMS operations. January 10, 2007T. J. Urban / ESCG6 Alpha Magnetic Spectrometer JSC Provided Integration Cables Design, Fabrication and Delivery Status

Interface Design Description January 10, 2007T. J. Urban / ESCG7 Alpha Magnetic Spectrometer Electrical Integrated Testing Status

T. J. Urban / ESCG8January 10, 2007 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Interface Design Description Payload Integration Cable Schematic

For payload testing: The payload flight model Interface Panel A will be used to provide GSE cable interface capabilities for STS power and data services. A new non-flight Test Connector Panel (TCP) will be used to provide GSE cable interface capabilities for ISS power and data services. This scheme will be used at: Europe: Functional, beam, TVT and EMI Tests KSC: Post-delivery functional. Interface Panel A connector savers will be used until ROEU ODA GSE is available. TCP will be used for all ground tests prior to installation of EVA Connector Panel / UMA and ACASS UMA is available. January 10, 2007T. J. Urban / ESCG9 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Interface Design Description

Interface Panel A Concept: GSE connector savers will be installed on all Interface Panel A flight connectors. For the power connections (5 of 6), GSE cables will be mated directly to the connector savers. For the sixth connection, 1553 & RS-422 data, a connector-saver to Trompeter adaptor (channel quantity TBC) will be utilized so that CERN GSE data cables will be simple, existing twin-ax cables. January 10, 2007T. J. Urban / ESCG10 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Interface Design Description

Test Connector Panel Concept: A non-flight test connector panel will be mounted to the UUSS (forward & starboard) to connect the GSE provided “ISS” power and data services to the PDS and J-Crate. This requires 6 flight cables to have new, interim, test cable configuration designs: -305 and -307 [test] instead of -301 and -303 [flight]. The test configuration cables will be fully assembled at JSC, then delivered to CERN (July ’07). The payload PDS, J-Crate and JPD connectors will be “FLIGHT” routed and connected to boxes at CERN – never to be disturbed. The other ends of these cables, with extra length coiled, will be attached to the Test Connector Panel. At KSC, the TCP will be removed and the -305/-307 cables will be re-routed and re-configured to the -301/-303 cables at the flight EVA Connector Panel. January 10, 2007T. J. Urban / ESCG11 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Interface Design Description

Test Connector Panel Concept (continued): The GSE power connections (2 of 6) at the TCP will be made via simple GSE connectors/cables. The GSE data connections (4 of 6) at the TCP will be made via circular connector to Trompeter or ST fiber connectors. This will allow the CERN GSE cables to be simple, existing twin-ax or ST fiber cables. January 10, 2007T. J. Urban / ESCG12 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Interface Design Description

GSE & Test Cable & Adaptor Schematic 13

Text Connector Panel Concept & Routing Test Connector Panel Test Cable Routing 14

JSC ESCG: Provide Test cables and Adaptors 6 test cables – quantity 1 each Adaptor, circular to 8 channel twin-ax – quantity 2 Adaptor, circular to 2 channel twin-ax – quantity 3 Adaptor, circular to 4 channel fiber ST – quantity 2 Loop-back connector, sub-miniature D 9 pin – quantity 3 Design Procurement of materials Fabrication Provide 6 connector savers for Interface Panel A – quantity 1 each Provide mating connectors for 7 other GSE cables – quantity 2 each Loan tools required for assembly of these 7 GSE cables January 10, 2007T. J. Urban / ESCG15 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Interface Design Description Responsibilities and Actions

CERN / MIT: Provide Trompeter twin-ax and fiber ST GSE cables. Provide cables and chamber feed-throughs required for interfacing GSE cables / adaptors during payload TVT and EMI tests. Assemble 7 GSE cables – quantity 2 each. THE DATE ALL ITEMS ARE NEEDED IS TBD (probably 3 rd quarter 2007). January 10, 2007T. J. Urban / ESCG16 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Interface Design Description Responsibilities and Actions (continued)

Pad Operations Preliminary Interface Test January 10, 2007T. J. Urban / ESCG17 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Upcoming Tests

Purpose: Pin to pin verification of AMS-02 payload to AMS-02 GSE data channels via the STS Mobile Launch Platform (MLP) and T0 Umbilical wiring. Transmission signal quality evaluation. “Stake a claim” on required KSC MLP GSE cables and equipment. Where: KSC: MLP in Vertical Assembly Building (no Orbiter). When: April 2007, one week Who: PADSOFT: Dennett ESCG: Urban and D. Nguyen MIT: Lebedev, Koutsenko, Cai T. J. Urban / ESCG18January 10, 2007 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Upcoming Tests Pad Operations Preliminary Interface Test

T. J. Urban / ESCG19January 10, 2007 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Upcoming Tests - POPIT 1553 Communications Test Configuration 1

T. J. Urban / ESCG20January 10, 2007 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Upcoming Tests - POPIT 1553 Communications Test Configuration 2

T. J. Urban / ESCG21January 10, 2007 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Upcoming Tests - POPIT RS-422 Communications Test

ESCG / Urban to compile and distribute required materials list: ESCG: Cables to be designed & fabricated and materials procurement KSC: MLP and T0 Test cables and test equipment STS / USA: Test PDIP CERN / MIT: Computers Software (1553) – changes recommended by PADSOFT in test plan, will be forwarded by ESCG / Urban. PADSOFT: RS-422 Software Items must be ready for shipment by end of March ‘07. This test will require KSC Test Readiness Review (March ’07). Other issues: KSC access and Visas January 10, 2007T. J. Urban / ESCG22 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Upcoming Tests - POPIT Responsibilities and Actions

PDS EM Power Quality Test January 10, 2007T. J. Urban / ESCG23 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Upcoming Tests

Purpose: Characterize PDS EM performance under load, and its affect on STS and ISS input power, as a design validation test. To include (from P. Lipoma): Electrical Power Characteristics Steady State Voltage Ripple Characteristics Transient Voltages Normal Voltage Range Electrical Power Interface Power Bus Isolation RPC Soft Start/Stop Compatibility Surge Current Reverse Energy Other RPC Characteristics Complex Load Impedance Large Signal Stability Electrical Power Constraints T. J. Urban / ESCG24January 10, 2007 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Upcoming Tests PDS EM Power Quality Test

Where: JSC: Electrical Power Systems Laboratory (EPSL) When: June 2007, one week Who: JSC: EPSL staff ESCG: Urban, Lipoma and D. Nguyen MIT: Koutsenko, Koulemzine, Capell or Lebedev CGS: Alia T. J. Urban / ESCG25January 10, 2007 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Upcoming Tests PDS EM Power Quality Test

T. J. Urban / ESCG26January 10, 2007 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Upcoming Tests Block Diagram

Responsibilities and Actions : ESCG coordination with JSC EPSL, including test plan and test procedures. EPSL will provide test facility, input 120 VDC, and test equipment. List of items to be provided by CGS: Payload simulating load Special test equipment Cables List of items to be provided by CERN / MIT: PDS EM Computer and CAN software Cables Date equipment should be ready to ship is the end of May ’07. Other issues: JSC access and Visas January 10, 2007T. J. Urban / ESCG27 Alpha Magnetic Spectrometer Electrical Integrated Testing Status Upcoming Tests PDS EM Power Quality Test