1 JCOP-UNICOS. 2 Purpose of this meeting Requested by IT/CO To present you the UNICOS requirements on the hierarchy classifications Not to discuss the.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

Microsoft Word By: Phuong Nguyen.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
1 Computing for Todays Lecture 22 Yumei Huo Fall 2006.
UNICOS Objects (CPC) 11/02/14 UNICOS, CERN1 CERN, EN/ICE, UNICOS Team.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Industrial Control Engineering UNICOS framework 2014 Marco Boccioli - EN/ICE-SCD - 18/12/2014  UNICOS  UNICOS  Plan for Q
With Internet Explorer 8© 2011 Pearson Education, Inc. Publishing as Prentice Hall1 Go! with Internet Explorer 8 Getting Started.
Microsoft Windows 2003 Server. Client/Server Environment Many client computers connect to a server.
CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA UNICOS: UN IFIED I NDUSTRIAL CO NTROL S YSTEM CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA 1 Marco Boccioli -
Novel techniques while developing on the WinCC OA Experience with the UCPC library.
© 2012 The McGraw-Hill Companies, Inc. All rights reserved. 1 Third Edition Chapter 5 Windows XP Professional McGraw-Hill.
Module 7: Fundamentals of Administering Windows Server 2008.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
1. Insert the Resource CD into your CD-ROM drive, click Start and choose Run. In the field that appears, enter F:\XXX\Setup.exe (if “F” is the letter of.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
11/03/2003LHC GCS - JCOP ER1 LHC GCS Renaud Barillère – CERN IT-CO.
© 2008 Map of Medicine Ltd. Commercial and in confidence. Training Foundation Module 2 – Map Management Suite Ver. 19 Jan 2011.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
Lecture Set 2 Part A: Creating an Application with Visual Studio – Solutions, Projects, Files.
ALICE DCS Meeting.- 05/02/2007 De Cataldo, Franco - INFN Bari - 1 ALICE dcsUI Version 3.0 -dcsUI v3.0 is ready and will be soon posted on the ACC site.
UNICOS-PVSS evolution Hervé Milcent (EN-ICE-SCD) 06/09/2010.
1 AutoCAD Electrical 2008 What’s New Name Company AutoCAD Electrical 2008 What’s New AMS CAD Solutions
FAIR Accelerator Controls Strategy
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
Industrial Control Engineering UNICOS distributed control  What does it mean?  Why do we need it  Implication for UNICOS device and tools Hervé Milcent.
Industrial Control Engineering UNICOS device and front-end Hervé Milcent UNICOS device front-endHervé Milcent1.
MARCO UNICOS based control system CERN Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
JCOP Review, March 2003 D.R.Myers, IT-CO1 JCOP Review 2003 Architecture.
New Features in DeltaV SimulatePro
Overview of PVSS 3.6 Oliver Holme IT-CO. 16/11/2006JCOP Project Team Meeting New features in 3.6 New Installer for PVSS on Windows New Qt User Interface.
ALICE Use of CMF (CC) for the installation of OS and basic S/W OPC servers and other special S/W installed and configured by hand PVSS project provided.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
In the depth of UNICOS … Hervé Milcent EN/ICE How to create a new package.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Chapter 3 Device Monitor Screen Otasuke GP-EX! Chapter 3 Device Monitor Screen Chapter 3 Device Monitor Screen.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
PVSS: Windows  Linux. 13th May Outline Current software architecture PVSS on Linux Demo What has to be redone for Linux console Vacuum, GCS, cryogenics.
Alarm Handling Oliver Holme 7 th November Guidelines & Strategies All provide recommendation to use Framework Classes Standard severities/behaviour/colours.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
UNICOS Roadmap 2015 Enrique Blanco On behalf of the UNICOS team EN-ICE 1 March 2015 CERN March 27, 2015 GSI - CERN Collaboration.
Web Site Development - Process of planning and creating a website.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
JCOP - 17 October 2001NA60_GAZ - E. Mazel J. Rochez1 A Project for the GAS control System At NA60.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Submitted by: DRPU Software Team Site:
XP Creating Web Pages with Microsoft Office
UNICOS-CPC course - CERN EN/ICE Industrial Controls Engineering Department Deployment of the CPC6 control application Marc Quilichini
SCADA Selection and Usage at CERN
CV PVSS project architecture
Recent developments in the Vacuum Control Software
Configuring System Settings
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 4: SCADA UCPC 6 UNICOS-Continuous Process Control Check.
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 4: SCADA UCPC 6 UNICOS-Continuous Process Control Check.
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
Diagnostics Analytical 920 LC Semi-Prep 940 LC
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Tools for the Automation of large distributed control systems
Web4Labels 3.1 Colour and logo definition features
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

1 JCOP-UNICOS

2 Purpose of this meeting Requested by IT/CO To present you the UNICOS requirements on the hierarchy classifications Not to discuss the implementation or to impose an implementation UNICOS is one user of the JCOP framework UNICOS is using the JCOP hierarchy mechanism

3 Outline Applications using UNICOS Requirements for the hierarchical classification JCOP components used in UNICOS v1.0 JCOP components to be used in UNICOS Development procedure of UNICOS application Demo

4 JCOP-UNICOS Close collaboration with JCOP-FW Share PVSS expertise Re-use of components UNICOS follows the JCOP device model For version 2.0 (planned for end of July 2003) Easy to add new device into the UNICOS core

5 Application using UNICOS Accelerator sector: LHC Cryogenics Surface and tunnel Discussion with the Vacuum system Experimental sector: GCS of the experiment: IT/CO Magnet control of the experiment ATLAS liquid Argon Calorimeter: LAL Cryogenics for experiments: AT/ECR

6 Application using UNICOS-PVSS Version v1.0: Fully compatible with the JCOP-framework v1.2.3 Used in production LHC cryogenics: QRL test, Nov 2003 Gas control: GCS team (IT/CO), one application: ALICE TPC Magnet control of the experiment ATLAS vacuum: EP/TA3 LN2 refrigerator: BNL to be test in Summer Cryogenics for experiments: End 2003, AT/ECR ATLAS main refrigerator ATLAS shield refrigerator ATLAS proximity solenoid ALICE Solenoid control: EP-TA3, in preparation planned for Sept 2003.

7 UNICOS hierarchy requirements – 1 Hierarchy used for: Devices (11 devices) classification E.g.: AnalogInput, DigitalInput, etc. 3 possible hierarchical classifications: Hardware hierarchy used by the expert doing the cabling In PVSS this is the dpName: prefix-PLCName-ApplicationName- DeviceType-number Functional hierarchy used by the cryogenics expert, it corresponds to the cryogenic drawing In PVSS the alias is used: system_location_deviceName Software hierarchy used by the software expert implementing the control in the PLC Into the PLC: link between device for the control Not currently in PVSS but GCS team and cryogenics expert requested it. Planned for future release Parent-child relationship E.g.: in the PVSS layer, get the list of device link

8 UNICOS hierarchy requirements – 2 Hierarchy used for Panel hierarchical classification Like window explorer The panels can be referenced in many places of one or many hierarchies Equivalent to symbolic link in UNIX Plot and page hierarchical classification JCOP trending tool Like window explorer The plot and page can be referenced in many places of one or many hierarchies.

9 UNICOS constraints Avoid whenever possible create/delete of dps UNICOS encountered problem with project having a lot of copy/delete The system was slow UNICOS always reserves spare elements The functional name (PVSS alias) can be modified online Insert nodes (folder) Into the panel, plot, page hierarchies Want to be compatible with JCOP: Build on top of JCOP Users from LHC experiments Re-use of JCOP components Provide useful components to JCOP: if interested

10 JCOP components in UNICOS v1.0 JCOP hierarchy to build: Panel hierarchies No use of the basic PVSS panel hierarchy because: Reference to other panel from a hierarchy is a copy No node We also need a horizontal navigation  DP type Component installation tool: To install the JCOP and UNICOS components Trending tool: To configure the plot and page To define the hierarchies To show the plot and page. Not the same look and feel as JCOP Access control: One domain and four privileges used to act on the device Per device type

11 JCOP components for UNICOS FSM toolkit: For high level of processing No need for partionning (not now but may be in the future) Database interface: PVSS & front-end Configuration Recipes Long term archiving UNICOS has to be interfaced to the LHC Logging Any other useful components

12 Development of UNICOS application Database Specification Template Automated Generation Tool Premium database Premium User program Quantum databaseObject Instantiation SCADA Databases

13 Development of UNICOS application 4: set-up the communication with the front-end 5: validate the devices Generic panels based on the hardware hierarchy Will be automated in future release 6: develop synoptic (panel) With PVSS00NG but not the PARA 7: configure the hierarchical and horizontal navigation 8: configure the plots and page Hierarchical and horizontal navigation Plot and page definition 9: adjust the device configuration Save back to the specification database 10: configure the integrity of the PVSS application Checks of PVSS drivers, archives error, front-end communication problem

14 GraphicalFrame UIM PVSS modules Close  close all the modules 1 per screen Header Alarm row Logo, application name Access to utilities Horizontal, hierarchical navigation Alarm list, etc. Configuration, management menu Synoptic area One per module One opened at a time Footer Contextual area For devices Panel, plot, page Text message

15 Devices in synoptics Each device: Contextual panel Faceplate Set of widgets Libs. Generation Display

16 Develop synoptic Double click or Ok button

17 Demo: synoptic development

18 Panel: hierarchy configuration – 2 Creation panels, node & navigation Reserved to expert user and users in expert group Not allowed for Views and node

19 Horizontal navigation For panel, plot, page device Up to 10 panels, plots or pages Shown in the context area

20 Historical navigation Panel, plot and page opened in the central area of the graphicalFrame Like Internet Explorer Back, forward, home, refresh, close History

21 Demo: panel, plot & page

22 Adjust the device configuration Double click or Ok button

23 Adjust the device configuration

24 Demo: modify device configs

25 UNICOS device: widget – 1 Mouse over Mouse click Select if user authorized: operator minimum Mouse double click Select, open faceplate Mouse right click Menu Device selected: White box around Contextual button opened in context area Device name set in the footer of the graphicalFrame Mouse over Device selected mouse over Device selected By another UIM No action possible

26 UNICOS device: widget – 2 Color and letter convention Dark pink: no data connected to the device, no access Cyan: data invalid aut_inv bit The data was never updated into PVSS Body to represent the type of widget Pump, heater, etc. WA M Mode Alarm Data quality Body Selection

27 UNICOS device: widget – 3 WA M Mode Alarm Data quality Body ModeLetterColor AutoNone ManualMWhite LocalLWhite ForcedFYellow RegulationRWhite TrackingTWhite AlarmLetterColorPriority Full Stop InterlockF Red Highest Stop InterlockSHigh Start Interlock I Normal Position AlarmP MaskLetterColorPriority Alarm Blocked (in PLC) B Yellow Highest Alarm Masked (in PVSS) MHigh BodyColorPriority InvalidCyanHighest Alarm Unack.Red Blinking High AlarmRedNormal Forced ModeYellowLow Auto ModeGreenLowest Data qualityLetterColorPriority InvalidN Cyan Highest IO ErrorE Orange Highest IO SimulatedSHigh Forced <> Auto WNormal Manual <> Auto Position Warning … Data not connected Data invalid

28 UNICOS device: faceplate Data area Trend area Info: HTML page Diagnostic: PVSS panel Contextual button Per device type Animation depend on the state of the device