Overview General Info Mission Statement PDS TRM Questions.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

1 Location of Partners and customers Who are our customers? MSSL Centre for Process engineering European Space Agency JOANNEUM RESEARCH Swedish Research.
1 System Engineers Toolbox 1 Compliance Automation, Inc. INCOSE: NM Enchantment Chapter By Cheryl Hill August 12, 2009.
Architects View AJ 100 London and South East Practice of the Year 2009 FX Interior Design Practice of the Year 2008.
Page 1 Capability Business Benefit Business Risk KEYBA Capabilities: Benefits V Risks Facilitation of Decision making Getting the right people together.
LeadManager™- Internet Marketing Lead Management Solution May, 2009.
Formula 1 Group Members: Quinn Collett Steve Godlewski Tobiah Halter Jeff Swanson Academic Advisor: Dr. Chien Wern June 4, 2003.
Improving the world through engineering 1 FS2012 Presentation Event Business Presentation 2012 Feedback Craig Powers Head Presentation.
Cooling System Reuben Ness Riki Hopkins Craig McLain
OBP Research Oy for simpler creation of embedded systems.
Team UDFSAE: Suspension Group
Project Management.
IBM Engineering & Technology Services © 2002 IBM Corporation Page 1 IBM Engineering & Technology Services BlueGene/L Production: From Prototype to Customer.
2012 Formula SAE Outboard Suspension
BSAD 102 Mike’s Bikes Business Simulation
BRAKE DYNAMOMETER DEVELOPMENT FOR DREXEL UNIVERSITY FSAE RACE TEAM MEM-01 Dr. Tein-Min Tan Frank DiMentoAlfredo Vitale Anthony TofaniJohn Henry.
Formula SAE Cooling System Reuben Ness Riki Hopkins Craig McLain.
The Team Lincoln Cummings (IE) – Project Manager Joe Calkins (ME) – Chief Engineer Mark Fazzio (ME) – Technical Writer Allison Studley (ME) – Minutes.
POLY-SEAL CORPERATION February 15, Project Management n Provides an organization powerful tools to improve the organization’s ability to plan, organize,
Term Project Pick a system (discuss choice with me)  Want simple functionality, security issues, whole system (e. g., client and server side) Submit a.
Types of Risks 1.Project risks –Impact schedule and cost –Includes budgetary, schedule, personnel, resource, customer, requirement problems 2.Technical.
Software Process and Product Metrics
SERVICE EVALUATION APPROACHES AND COMPARISON WITH THE USE OF ITIL Matthew Fazo BIS 461.
Risk Management  Risk is the product of –Probability that something will go wrong And –Severity of its consequences  How to reduce risk? –Reduce probability.
What are MRLs ? Alfred W. Clark Dawnbreaker, Inc.
María Camila Luna Pablo Santizo Matheu Zachary Borden Zachary Delurey ENIORDESIGNENIORDESIGN.
PMI Knowledge Areas Risk Management.
Introduction to Software Quality Assurance (SQA)
Concept Evaluation and Selection… Integrated Product and Process Design ME En 475/476.
Basic Utility Vehicle (BUV) ME 462 Capstone Design Presentation Department of Mechanical Engineering, IUPUI December 14, 2005 Presented by: Tom Peters.
Ch. 5: Project Planning Good Quote: Plans are only good intentions unless they immediately degenerate into hard work Lame excuses for not planning: Takes.
Old dominion university formula sae
2012 Formula SAE Outboard Suspension
Cook Stove for Haiti Enhancements System Level Design Review Friday, January 14 th :00 AM – 12:30 PM Project
The Need Specification. References  Adapted from:  Design for Electrical and Computer Engineers, first edition, by Ralph M. Ford and Chris S. Coulston.
Annex I: Methods & Tools prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9 QUALITY.
Motor Assisted Wheelchair Design Review 09/10/15.
2011 Human Powered Vehicle Challenge 'Mjolnir' Team Members: Tad Bamford Ben Higgins Chris Schultz Aaron Stanton Neal Pang.
1 Chapter 1 The Product. 2 What is Software?  Pressman Instruction (computer programs) Data Structures Documents  Sommerville Software is computer programs.
Software Engineering B.Tech IT/II Sem-II Term: Unit-7 PPT SLIDES Text Books:1.Software Engineering, A practitioner’s approach Roger s. Pressman.
© G. A. Motter, 2006, 2008 & 2009 Illustrated by Examples Quality Function Deployment and Selection Matrices Customer Driven Product Development.
Microsoft Management Seminar Series SMS 2003 Change Management.
Improving the world through engineering 1 FS2011 Presentation Event Business Presentation 2011 Feedback Craig Powers Head Presentation.
Risk  Risk is the product of –Probability that something will go wrong And –Severity of its consequences  How to reduce risk? –Reduce probability that.
The Journey to a West Coast Drivetrain
Software Quality Assurance and Testing Fazal Rehman Shamil.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Ben Gruenzner Nick Hanson Aaron Pilger Dustin Kalhoff Chris Kost Jason Kuenzli Justin Moe Scott Rector Mike Schmitz Jamie Schlachter Ryan Schommer Ryan.
14471 Vibration Test Apparatus: Systems Design Review Team Lead: Brett Billings Lead Engineer: Nicholas G Scribe: Ashley W EDGE: Claire Kobal Team Members:
University of Wyoming: Robo-Ops Team Joshua Bailey Thomas Bilodeau Kyle Cox Carter Schultz – Project Lead 1.
Risk Management  Risk is the product of –Probability that something will go wrong And –Severity of its consequences  How to reduce risk? –Reduce probability.
System Development Life Cycle (SDLC). Activities Common to Software Projects Planning : Principles Principle #1. Understand the scope of the project.
Trade-offs in Web development Jianyun Zhou Dept. of Computer and Information Science.
Design of an Off-Road Front Suspension and Steering System
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Project Summary.
Supportability Design Considerations
GD211 Training Module 5 Conclusions.
Project management assignment, Spring 2017
INSPIRATION – BLOODHOUND SSC WORLD LAND SPEED ATTEMPT
Software Engineering B.Tech Ii csE Sem-II
Plan on no more than 15 minutes of talking
Validation through Instrumentation
Software Quality Engineering
Chapter 3 Project Management
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
Program Status (Chart 1)
P07122: Autonomous Quadcopter
Comparing two Spreadsheets
Overview Headlines RSP – Progress Overview General progress report
Team Members: Reuben Ness Craig Mclain Riki Hopkins
Presentation transcript:

Overview General Info Mission Statement PDS TRM Questions

General Info Every year the Viking Motorsport team designs and builds an open wheel racecar using a 600cc engine and competes in an international competition held in Kentucky.

Mission Statement The mission of the Outboard Suspension team is to improve the design of the hub and upright by reducing machine time and cost, while decreasing weight, and decreasing rolling resistance in the bearings.

Product Design Specification Performance PriorityRequirements Primary Customer GoalMetricTarget Target Basis Verification 4Hub weightFSAE TeamDecrease weightPounds2lbCustomer defined Prototype Manufacturing PriorityRequirements Primary Customer GoalMetricTarget Target Basis Verification 4Ease of hub manufacturing FSAE Team / manufacturing Decrease complexity Machining time (min) 80 minutesCustomer defined Prototype

Product Design Specification Life in Service PriorityRequirements Primary Customer GoalMetricTarget Target Basis Verification 2Service lifeFSAE Team / driver Ensure sufficient reliability Operating life (years) Minimum 5 year life Customer / group FEA / prototype Disposal PriorityRequirements Primary Customer GoalMetricTarget Target Basis Verification 1Recyclable Material FSAE TeamMinimize Disposal Cost N/A Customer Defined MSDS

Product Benchmarking 2011 VMS Outboard Suspension 3.1 lb hub weight, 120 minute hub machining time, $200 hub cost, 4 lugs 2010 VMS Outboard Suspension 4 lb hub weight, off the shelf Volkswagen product, $35 hub cost, 4 lugs Taylor Race Engineering Outboard Suspension 4 lb hub weight, off the shelf product, $389 hub cost, 4 lugs 2012 Design Target 2 lb hub weight, 80 minute hub machining time, $200 hub cost, 1 lug

Technical Risk Management - Risk Identification - The team is unable to deliver on time The parts are improperly sized The parts cost too much to make

Technical Risk Management - Risk Assessment - FrequentLikelyPossibleUnlikelyRare CatastrophicExtreme High Moderate SevereExtremeHigh ModerateLow MarginalHighModerate Low NegligibleModerateLow Missed delivery dateParts undersizedParts cost too high

Technical Risk Management - Risk Mitigation - Delivery time Timelines for the project have been developed to keep the project on schedule - Reduces Likelihood Maintain ability to use previous years parts - Reduces consequence

Technical Risk Management - Risk Mitigation - Parts Undersized Detailed FEA and engineering practices are used to size parts - Reduces Likelihood Extensive on vehicle testing starting at low speeds to validate parts - Reduces consequence

Technical Risk Management - Risk Mitigation - Part cost too high Keep part features simple and easy to machine - Reduces Likelihood Ensure parts are designed correct the first time so duplicates don’t have to be made - Reduces consequence

Technical Risk Management - Risk Monitoring - Watch timelines to ensure project is on schedule Carefully monitor the vehicle during first runs to ensure parts are strong Get cost quotes before the parts are made and talk with the machinist to find areas to decrease cost

QuestIons?QuestIons?