Shield Module Design Considerations Adam Carroll Van Graves July 3, 2014.

Slides:



Advertisements
Similar presentations
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
Advertisements

WEDGES AND FRICTIONAL FORCES ON FLAT BELTS
01/07/2008HCAL Main Meeting- Mechanical Integration1 ILD HCAL Mechanical Integration HCAL Main Meeting Kirsten Kschioneck, DESY.
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
Moving Armor Target (MAT) Track Jacob Feist Cleon Stanley Thomas Hutton Sladana Lazic 03/30/2006.
Vacuum Vessel Production Readiness Review
Structural Collapse Technician Training
Designing for Stiffness
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
By: Joseph Martinez University of Michigan Supervisor: Dave Pushka, NuMI Project 3Q120-M Quadrupole Magnet Transport.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 11 Mar 2009 Neutrino Factory Cryostat 1 Concept V.B. Graves MERIT Videoconference.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
ILC Target Wheel Rotordynamics Lisle Hagler 5/23/2007 UCRL-PRES This work was performed under the auspices of the U.S. Department of Energy by University.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
Magnet System Definition L. Bromberg P. Titus MIT Plasma Science and Fusion Center ARIES meeting November 4-5, 2004.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
Helmholtz Capture Solenoid Update Peter Loveridge STFC Rutherford Appleton Laboratory, UK 2 nd Princeton-Oxford High Power Target.
Twin Solenoid Twin Solenoid - conceptual design for FCC-hh detector magnet - Matthias GT Mentink Alexey Dudarev Helder Pais Da Silva Leonardo Erik Gerritse.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
In the analysis of a tilting pad thrust bearing, the following dimensions were measured: h1 = 10 mm, h2 = 5mm, L = 10 cm, B = 24 cm The shaft rotates.
COLUMNS. COLUMNS Introduction According to ACI Code 2.1, a structural element with a ratio of height-to least lateral dimension exceeding three used.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
Neutrino Factory Mercury Vessel: Initial Cooling Calculations V. Graves Target Studies Nov 15, 2012.
Roller Coaster Dynamics-1: Energy Conservation
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
Structural option for the Jinping neutrino central detector Contributor : Yuanqing Wang, Zongyi Wang Speaker : Zongyi Wang Department of civil engineering,
Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.
20to2T5m100cm Images Van Graves February 13, 2014.
HCAL Mechanical Design Victor Guarino HEP-ANL. Work to date.. Have been thinking about how to construct individual modules and assemble them into a barrel.
Sizing Variable Flow Piping – An Opportunity for Reducing Energy
Calculation of Beam loss on foil septa C. Pai Brookhaven National Laboratory Collider-Accelerator Department
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
6- Calculation of shear stress at composite interface: A)Under service load: Strain and stress distributions across composite beam cross- section, under.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Engineering Analysis October 23, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
IDS120j WITHOUT RESISTIVE MAGNETS MODIFYING Hg MODULE Nicholas Souchlas, PBL (11/1/2012) 1.
Beam Design Beams are designed to safely support the design loads.
Week 8 Deliverables. Assisted Living Facility Visit Talked with elderly who are currently using walkers, a few who were using the same model as the one.
Standout Technical Designers MAE 416: ME Senior Design Sponsored by Cooper Hand Tools Brian SearsNate Ouellette Pooria Javidi Nathan Mize Chris EvansJustin.
IDS120j WITH AND WITHOUT RESISTIVE MAGNETS PION AND MUON STUDIES WITHIN TAPER REGION, III ( 20 cm GAPS BETWEEN CRYOSTATS ) Nicholas Souchlas, PBL (9/4/2012)
A View of NCSX Structural System and Load Path for the Base Support Structure.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Calculations D. Smargianaki 29/04/2015 LBNF. Outline D. Smargianaki(CERN) 2 29/04/2015 Comparison between Single Beam & Beam with Spliced connections.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Neutrino Factory Target Vessel Concept Update V. Graves Target Studies EVO June 12, 2012.
February 5, 2015 Dmitriy Yavid, Broad Shoulder Consulting LLC Broad Shoulder Consulting LLC Electronics, Mechanics, Optics, Software.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
LUKHDHIRJI ENGINEERING COLLEGE MORBI SUBJECT :- “BOX SHEAR TEST” 1.Mepani Kiran ( ) 2.Pavasiya Jaydeep ( ) 3.Pindoriya Jenti( )
AUGUST 3, 2010 BRYCE AUSTELL UNIVERSITY OF ILLINOIS FERMILAB SIST INTERN ADVISOR: RYUJI YAMADA Muon-to-Electron Conversion Experiment (Mu2e) Detector Solenoid.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Joint Institute for Nuclear Research Deformations and stresses in the flux return yoke A.Efremov, Yu.Lobanov, A.Makarov Darmstadt,
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
Summary of Platform and Hilman Rollers Deformation Studies John Amann ILC Mechanical Engineering 7/11/07.
Direct Shear Test.
16 T dipole in common coil configuration: mechanical design
SBN Far Detector Installation & Integration
Present status of the flux return yoke design
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE
By Arsalan Jamialahmadi
Presentation transcript:

Shield Module Design Considerations Adam Carroll Van Graves July 3, 2014

2Managed by UT-Battelle for the U.S. Department of Energy Shield Module Design Considerations 3 July 2014 Overview Capability to remotely remove and reinstall the shield modules is required Shield module concept is He-cooled tungsten spheres Current shield modules weigh up to 200 tons Cradle needs to be sized to support shielding Tungsten Shielding SC1 Cradle SC2

3Managed by UT-Battelle for the U.S. Department of Energy Shield Module Design Considerations 3 July to2T5m120cm4pDL Shielding Module Volumes ModuleVolume (m^3)Weight (MT)*Weight (ton) *Assuming density of 19,250 kg/m^3, packing factor of 60%

4Managed by UT-Battelle for the U.S. Department of Energy Shield Module Design Considerations 3 July 2014 Shield Supports Current concept is simple stand integrated with cryostat Provides curved shelf to support shield weight without transferring load to cryostat Mounted to base platform that can be moved laterally out of beam line Some design considerations – Inter-coil forces – Shielding module support & removal – Stability under weight – Space requirements – Shorter preferred in height and along beam axis Leg footprint: 100mm X 1600mm Shelf thickness: 40mm

5Managed by UT-Battelle for the U.S. Department of Energy Shield Module Design Considerations 3 July 2014 Translating the shielding Shielding Options for shield module extraction – Sliding material, low friction material to reduce force required to drag shielding Best materials not radiation tolerant Steel on steel: µ s = 0.5 – 0.8 Steel on brass: µ s = 0.35 – Tracked wheels, removes significant shielding space, difficult due to high weights, may be possible – Rollers, removes significant shielding space, but rad-hard and reliable – Lubricants likely not allowed Rollers considered for this presentation

6Managed by UT-Battelle for the U.S. Department of Energy Shield Module Design Considerations 3 July cm 60 cm Shielding Cut Away for Roller Shielding cutaway required to allow space for rollers Potentially could be optimized to provide more shielding, but a significant localized shielding reduction will always be required

7Managed by UT-Battelle for the U.S. Department of Energy Shield Module Design Considerations 3 July 2014 Hilman Rollers Rollers High weight capacity required – First concept is commercially available hardware with adequate capacity Minimum of three pairs required Continuous line of rollers reduces stress on cradle (see two slides forward for comparison)

8Managed by UT-Battelle for the U.S. Department of Energy Shield Module Design Considerations 3 July 2014 Cradle Stress Initial cradle design with the addition of a track is insufficient to support the weight of the shield. Transforming the cradle into a tube significantly improves its strength.

9Managed by UT-Battelle for the U.S. Department of Energy Shield Module Design Considerations 3 July 2014 Max Stress ~15ksi Max Stress above yield Cradle Stress Continuous rollers produce lower stress on cradle Other potential worse case loading situation may occur as the shield module is extracted, those situations will need to be considered to continue the conceptual design Three Pair Continuous Note: images don’t use same scale

10Managed by UT-Battelle for the U.S. Department of Energy Shield Module Design Considerations 3 July 2014 Cradle Buckling Buckling of the cradle was analyzed ~55x load factor calculated – Buckling not a concern in current concept Horizontal forces from inter- coil attraction/repulsion not considered

11Managed by UT-Battelle for the U.S. Department of Energy Shield Module Design Considerations 3 July 2014 Conclusions Remotely handling the shielding modules is a significant challenge Rollers are an option, optimization to reduce shielding loss required Cradle requires some strengthening to handle the shielding load Extraction procedure and tooling concepts need to be developed Smaller shielding modules beneficial from remote handling perspective – One shield per coil, one coil per cryostat – Cryostat performance must be considered – More utility connections required – Increases number of inter-coil forces if each coil is in its own cryostat – More and/or larger gaps between cryostats